X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-029-21838

Well Details

Well ID: 34-029-21838
Loading map...
Country: United States
State: Ohio
County: Columbiana
Municipality: Franklin Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000717
Farm/Lease Name: PITTS 22-14-4
License Status: Producing
License Date: 2013-12-26
Spud Date: 2013-11-27
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2014-03-27
Well Total Depth: 13304.00 ft
Configuration: Horizontal
Latitude: 40.680000
Longitude: -80.910000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-11-22 Proposed Formations:TRENTON THRU BLACK RIVER, Issued Date:11/22/2013, Expired Date:11/22/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2013-12-26 Proposed Formations:POINT PLEASANT, Issued Date:12/26/2013, Expired Date:12/26/2015 12:00:00 PM, Drilling unit acres:459.64, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2014-01-31 CHANGE IN SURFACE FOOTAGE & GROUND LEVEL ELEVATION
Reached Total Depth 2014-03-27
Correction to Well 2014-07-11 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2015-01-09
Construction Permit Expires 2015-12-26
Record Last Modified 2019-06-11

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-10-23 8654 13107 510
8654 13107 510
8654 13107 510

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/26/2014 07/29/2014 7875 3,822,670.0 319440

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 5.84428 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 80.8865 0
A264, B244, B317, D047, J218, J475,

J580, J609, J610, L058, Acid, Hydrochloric 15pct, Northern White Sand, 100 Mesh Sand

SCHLUMBERGER Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Defoaming Agent, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural Glycerol 56-81-5 0.03 0.00368 0
Sodium erythorbate 6381-77-7 0 0.0006 0
poly(tetrafluoroethylene) 9002-84-0 0 0 0
Potassium borate 1332-77-0 0.09 0.01129 0
Decamethyl cyclopentasiloxane 541-02-6 0 0 0
Alkenes, C>10 a- 64743-02-8 0 0.00007000 0
Crystalline silica 14808-60-7 97.89 12.9349 0
Sodium sulfate 7757-82-6 0 0.00015 0
Prop-2-yn-1-ol 107-19-7 0 0.00011 0
Dimethyl siloxanes and silicones 63148-62-9 0 0.00001000 0
Polypropylene glycol 25322-69-4 0 0.00011 0
Alcohols, C14-15, ethoxylated (7EO) 68951-67-7 0 0.00017 0
Hydrogen chloride 7647-01-0 1.43 0.18835 0
Tetrasodium ethylenediaminetetraacetate 64-02-8 0 0.00002000 0
Dodecamethylcyclohexasiloxane 540-97-6 0 0 0
Potassium hydroxide 1310-58-3 0.03 0.00417 0
Ethanol, 2,2,2-nitrilotris-, 1,1,1-tris(dihydrogen

phosphate), sodium salt

68171-29-9 0.01 0.0018 0
Urea 57-13-6 0 0.00064 0
Octamethylcyclotetrasiloxane 556-67-2 0 0 0
Thiourea, polymer with formaldehyde and 1-phenylethanone 68527-49-1 0 0.00036 0
Methanol 67-56-1 0 0.0006 0
Siloxanes and Silicones, di-Me,

reaction products with silica

67762-90-7 0 0 0
Guar gum 9000-30-0 0.29 0.03804 0
Magnesium silicate hydrate (talc) 14807-96-6 0 0.00001000 0
Ammonium sulfate 7783-20-2 0.1 0.01318 0
Acrylamide, 2-acrylamido-2-methylpropanesulfonic

acid, sodium salt polymer

38193-60-1 0.07 0.00973 0
Non-crystalline silica 7631-86-9 0 0.00024 0
Trisodium ortho phosphate 7601-54-9 0.01 0.00079 0
Copper(II) sulfate 7758-98-7 0 0 0
2-propenamid 79-06-1 0 0.00003000 0
Fatty acids, tall-oil 61790-12-3 0 0.00044 0
Polymer of 2-acrylamido-2-methylpropanesulfonic

acid sodium salt and methyl acrylate

136793-29-8 0.01 0.00104 0
Diammonium peroxidisulphate 7727-54-0 0.01 0.00121 0
Vinylidene chloride/methylacrylate copolymer 25038-72-6 0 0.00026 0
Glutaraldehyde 111-30-8 0.05 0.00597 0
Ethane-1,2-diol 107-21-1 0 0.00023 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-07-29 H2O 15 2280 Bbl 338321 Schlumberger STAGE 17/17

30 SHOTS

2014-07-26 H2O 15 2872 Bbl 331721 Schlumberger STAGE 1/17

30 SHOTS STAGES 2-16 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC 146372 1102 48
2015 CHESAPEAKE EXPLORATION LLC 530603 1422 313
2016 CHESAPEAKE EXPLORATION LLC 399014 617 366
2017 CHESAPEAKE EXPLORATION LLC 290045 276 365
2018 CHESAPEAKE EXPLORATION LLC 236538 156 364
2019 CHESAPEAKE EXPLORATION LLC 51555 19 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC Brine 15445 48
2015 CHESAPEAKE EXPLORATION LLC Brine 3630 313
2016 CHESAPEAKE EXPLORATION LLC Brine 2356 366
2017 CHESAPEAKE EXPLORATION LLC Brine 2692 365
2018 CHESAPEAKE EXPLORATION LLC Brine 1615 364
2019 CHESAPEAKE EXPLORATION LLC Brine 342 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-532190523 2013-11-29 0:00 DD No Violations
0532190523 2013-11-29 Drill / Deepen / Reopen No Violations I was at the site to check the progress on the conductor drilling operation. Precision Rathole was on location and in the process of drilling the conductor hole for the Pitts 22-14-4 #5. The bit was stuck down due to a mechanical failure, and the rig crew was working to free the bit. A second rig was in the process of drilling the Pitts 22-14-
0740968724 2016-03-29 Production Wells No Violations I was on location for a status check. My inspection found the access road gate locked and the

access road is in good repair. An identification sign at the access road entrance, well, and tank battery. The pad is fenced and all man doors are locked. The #5H well is in production. The well is equipped with a christmas tree valve assembly. There is a steel dike around the tank battery. The equipment on the pad consists of the following: 6 - Storage tanks 400 bbl 1 - Vapor recovery unit (VRU) 6 - Gas processing units (GPU) 1 - Vertical separator 6 - Sand separator

1 - Thermal electric generator 6 - Producing wells Site fenced and man doors locked

0783991458 2013-12-02 Casing String Witnessed No Violations

-

1395752928 2014-03-20 Casing String Witnessed No Violations
1396988369 2014-03-29 Casing String Witnessed No Violations

-based mud used to drill and condition the hole, a lead cement followed by a tail cement were pumped. The Mudpush spacer was mudscaled, and pumped at 12.5 pounds per gallon (ppg). Schlumberger then pumped 247 bbls of lead cement at 13.5 ppg, and 267.5 bbls of tail cement at 15.0 ppg. The plug was dropped and displaced with 293 bbls of water as measured by pump truck tanks. The plug bumped the float collar at 3:03am on 03/29/2014. The plug landing pressure was 2176 psi, and it was raised to 3226 psi, and held for 5 minutes. Pressure held. The float held when the pressure was released, and 3.5 bbls of water bled back.

1642670800 2020-7-8 0:00:0 PW No Violations 1.00
1691474925 2017-01-30 Production Wells No Violations The purpose for my inspection was to conduct a status check on well (#2-1838-00-
2037373356 2014-12-11 Preliminary Restoration No Violations

-lined and sealed secondary containment. There are concrete barriers protecting the containment from vehicles. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipaters. There is a truck grounding area for trucks collecting condensate and/or produced water. Along the interior of the chain link fence there are two site drains installed. There is an earthen berm, with well-established ground cover. The soil stockpile is well stabilized with vegetation. Crops, woodlands and/or underbrush are growing normally outside the area of disturbance. Drainage and erosion controls outside the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. Preliminary

740968724 2016-3-29 0:00: PW No Violations
783991458 2013-12-2 0:00: CS No Violations

For data sources see[10]

References