X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24430

Well Details

Well ID: 34-111-24430
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Washington Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-000472
Farm/Lease Name: GARY GREEN S WSH MN
License Status: Producing
License Date: 2014-11-07
Spud Date: 2013-12-30
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2015-02-18
Well Total Depth: 14726.00 ft
Configuration: Horizontal
Latitude: 39.670000
Longitude: -81.180000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-11-04 Proposed Formations:UTICA SHALE-POINT PLEASANT, Issued Date:11/4/2013, Expired Date:11/4/2015 12:00:00 PM, Drilling unit acres:363.358, Proposed Well Type:OG, Proposed Well Class:EDPW
Change of Owner 2014-10-30 Operator changed from 8793, HG ENERGY LLC to 9193, AMERICAN ENERGY UTICA LLC
APP 2014-11-07 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:11/7/2014, Expired Date:11/6/2016 12:00:00 PM, Drilling unit acres:377.412, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-02-18
Change of Owner 2015-06-19 Operator changed from 9193, AMERICAN ENERGY UTICA LLC to 8799, GULFPORT ENERGY CORPORATION
Construction Permit Expires 2016-11-06
Completion Report Received 2018-01-25
Record Last Modified 2018-06-27

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-02-06 9541 9686 50
2018-02-06 14416 14561 50
14416 14561 50
9541 9686 50
9541 9686 50

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 03/26/2017 04/10/2017 9185 7,728,410.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 B-84 X-Chem Biocide n-Alkyl(C12-C16) dimethyl benzyl ammonium chloride 68424-85-1 10 0.00330739 2389.53
Ethanol 64-17-5 5 0.0016537 1194.77
Didecyl dimethyl ammonium chloride 7173-51-5 10 0.00330739 2389.53
Glutaraldehyde 111-30-8 30 0.00992218 7168.6
SFR-470 X-Chem Friction Reducer Petroleum distillates, hydrotreated light 64742-47-8 30 0.0216017 15606.8
Alcohols, C10-16, ethoxylated 68002-97-1 1.5 0.00108008 780.341
Alcohols, C12-14, ethoxylated 68439-50-9 1.5 0.00108008 780.341
Ammonium chloride 12125-02-9 13 0.00936073 6762.95
Alcohols, C12-16, ethoxylated 68551-12-2 1.5 0.00108008 780.341
SC-30 X-Chem Scale Inhibitor Sodium Hydroxide 1310-73-2 1.5 0.000303671 219.397
100 mesh sand Muskie PROPPING AGENT CRYSTALLINE SILICA 14808-60-7 100 0.842097 608400
NEFE-210 X-Chem Acid Non-Emulsifier and Iron Control Methyl alcohol 67-56-1 35 0.000524293 378.792
Acetic acid 64-19-7 65 0.000973687 703.471
Propargyl alcohol 107-19-7 5 0.00007490 54.113
Cocamide DEA 68603-42-9 5 0.00007490 54.113
Alcohols, C12-16, ethoxylated 68551-12-2 5 0.00007490 54.113
2-Ethyl hexanol 104-76-7 10 0.000149798 108.226
Tall oil fatty acid 61790-12-3 5 0.00007490 54.113
40/70 white sand Muskie PROPPING AGENT CRYSTALLINE SILICA IN THE FORM OF QUARTZ 14808-60-7 100 9.5219 6,879,400.0
Water Gulfport Carrier/Base Fluid Water 7732-18-5 100 89.2667 64,493,600.0
Other Chemical(s) Listed Above See Trade Name(s) List Methyl alcohol 67-56-1 35 0.000524293 378.792
WATER 7732-18-5 100 0.242482 175189
n-Alkyl(C12-C16) dimethyl benzyl ammonium chloride 68424-85-1 10 0.00330739 2389.53
Ammonium chloride 12125-02-9 13 0.00936073 6762.95
Ethanol 64-17-5 5 0.0016537 1194.77
Alcohols, C12-16, ethoxylated 68551-12-2 1.5 0.00108008 780.341
Propargyl alcohol 107-19-7 5 0.00007490 54.113
Cocamide DEA 68603-42-9 5 0.00007490 54.113
Alcohols, C12-14, ethoxylated 68439-50-9 1.5 0.00108008 780.341
Didecyl dimethyl ammonium chloride 7173-51-5 10 0.00330739 2389.53
Alcohols, C10-16, ethoxylated 68002-97-1 1.5 0.00108008 780.341
Alcohols, C12-16, ethoxylated 68551-12-2 5 0.00007490 54.113
2-Ethyl hexanol 104-76-7 10 0.000149798 108.226
Tall oil fatty acid 61790-12-3 5 0.00007490 54.113
28% HCl Acid X-Chem ACID HYDROCHLORIC ACID 7647-01-0 32 0.0775943 56060.5
WATER 7732-18-5 100 0.242482 175189

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-03-27 H2O 15 6813 Bbl 276040 EVOLUTION WELL SERVICE STAGE 1/28

STAGES 2-27 SEE IMAGES

2017-04-10 H2O 15 6472 Bbl 228020 EVOLUTION WELL SERVICE STAGE 28/28

STAGES 2-27 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 GULFPORT ENERGY CORPORATION 1553270 0 211
2018 GULFPORT ENERGY CORPORATION 888636 0 362
2019 GULFPORT ENERGY CORPORATION 146330 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 GULFPORT ENERGY CORPORATION Brine 24185 211
2018 GULFPORT ENERGY CORPORATION Brine 10017 362
2019 GULFPORT ENERGY CORPORATION Brine 1563 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1272598005 2014-1-2 0:00:0 DD No Violations
-1739061571 2018-3-5 0:00:0 PW No Violations 0.20
-1944785653 2015-2-3 0:00:0 DD No Violations
-200400751 2017-6-27 0:00: PL No Violations 0.50
0200400751 2017-06-27 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the well site meets ORC 1509.072 with vegetation established and erosion control in place. The lease road is in good repair and graveled from County Road 12 to the well pad. There is a midstream distribution sales point located on the South East side of the well pad near the well pad entry point, Rice Energy is the Mid Stream operator and there is a glycol dehydration unit present on the mid stream site. Situated on the well pad is a total of( 6) wells all now in production with production trees in place and the well head production valves in the open position. The wells are all equipped with annular monitoring pressure gauges. The wells are selling into gas processing units with a total of (6 )gas processing units on location one for each well. Also present on the West side of the well pad is the production fluid storage area consisting of a total of (4) steel construction 400 barrel capacity production tanks located inside a polymer lined steel containment dike area. The pumper is on site and has indicted they are shipping 2,100 barrels of production flow back fluid per every 24 hours. Identification is posted at each well and at the end of the lease road. Safety shut down points are at each well along with at the production facility and well pad entry point.
0364617010 2018-03-05 Production Wells No Violations Producing well status check inspection found the well head designed to produce from the tubing well head above the B-Section and casing head section. In the tubing section vertically there is a total of (2) manually operated valves then the tubing flow cross, attached to the tubing flow cross downstream is a third manual valve then a Emergency Shut Down (ESD) valve with remotely controlled switches at multiple locations on location including at the well head and gas processing units along with the production facility and entry point of the location. On location there is a total of (6) active well heads with annular pressure monitoring in place on each well head. The said well has annular pressure gauges in place with the valves in the open position. The annular pressure between the 13.375 casing and 9.625casing reads 100 psi and between the 9.625 casing and the 5.5 casing 600 psi. Addressing the well support equipment on location- at the entry point of the location is a midstream operation operated by EQT Company, on the left hand side of the well pad is a total of (6) gas processing units one each for every active well on the pad. At the left rear corner of the well pad is the production facility consisting of a total of (4) steel construction tanks each with a total fluid volume of 400 barrels capacity, the tanks are situated inside a polymer lined steel containment dike area. The well pad does have a perimeter earthen berm. Proper well identification is posted at the each well and the tank battery as well as the entry point of the lease road and well pad.
0953944783 2017-03-06 Preliminary Restoration No Violations Preliminary Restoration status check inspection accompanied by ODNR County Inspector Austin Gutridge. The area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. The lease road is stoned and in good repair. Signage is posted at the well pad entrance. Evolution Energy Service DC turbine electric powered stimulation pump fleet is on location and has stimulated 19 stages on the 5-H well. Red Dirt rentals completion master valves are in place on each of the 5 wells on location. Nine Energy completion service is on location perforating each stage of the well bores to be stimulated with 5 clusters of 10 shots each cluster. The well completion iron is 15,000 psi rated capacity. All completion equipment is located on secondary polymer containment with the well pad berm serving as the primary containment with the perimeter drain valves in the closed position.
1272598005 2014-01-02 Drill / Deepen / Reopen No Violations The said well was spudded on 12/30/13 with 100 of 20 conductor being set by HAD drilling with no annular space.
1491842258 2017-04-10 Completion Testing No Violations Status check inspection on the well completion process found Evolution Energy Turbine Electric DC powered stimulation fleet on location and the well bore stimulation now complete with stage 28 out of 28 stimulated. The last and final stage was stimulated by Nine Energy wireline service with a solid completion plug being set at a depth of 9,704 and the stage being perforated between the depths of 9,686 and 9,541. Nine Energy is currently running in the well bore to set a isolation kill plug that will be set 2 casing joints above the last perforation at 9,541. The stimulation fleet will move to the Whitacre 702 well pad next.
1739061571 2018-03-05 Production Wells No Violations On this day, I accompanied ODNR Inspector William Stolarik. Please refer to his comments for a detailed report. The lease road is gated and an EQT midstream production facility is situated on the righthand side, prior to the well pad. There is an emergency shutdown button on the left, at the entrance. The well is equipped with annular pressure monitoring and an emergency shutdown button is located at the wellhead. There are (6) gas processing units on the left of the pad, and all are equipped with an emergency shutdown button. At the backside of the pad are (4) 400 barrel steel tanks within containment.
1944785653 2015-02-03 Drill / Deepen / Reopen No Violations Status check inspection on the drilling process found Nomac Drilling rig #82 on location drilling the 12.250 1st intermediate wellbore at a depth of 3,199 with the company currently deviating the well bore at 4.21 degrees in the directional azimuth of 231 degrees.
364617010 2018-3-5 0:00:0 PW No Violations 0.20
481936312 2020-4-21 0:00: PW No Violations 1.00
953944783 2017-3-6 0:00:0 PL No Violations 0.50

For data sources see[10]

References