If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-20988 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.36,"lon":-81.27,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Franklin Township | |
Operator Name: TUCO PARTNERSHIP | |
Well Pad ID: | |
Farm/Lease Name: EDIE | |
License Status: Producing | |
License Date: 2005-02-11 | |
Spud Date: 2005-02-18 | |
Spud Drilling Contractor: WARREN DRLG | |
Final Drill Date: 2005-02-24 | |
Well Total Depth: 5898.00 ft | |
Configuration: Vertical | |
Latitude: 40.360000 | |
Longitude: -81.270000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2005-02-11 | Proposed Formations:CLINTON, Issued Date:2/11/2005, Expired Date:2/11/2006 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Completed | 2005-02-24 | RBDMS Rec |
Reached Total Depth | 2005-02-24 | RBDMS Rec |
Construction Permit Expires | 2006-02-11 | RBDMS Rec |
Completion Report Received | 2007-01-23 | RBDMS Rec |
Change of Owner | 2011-02-08 | Operator changed from 7780, TUCO OPERATING PARTNERS,LLC to 2960, TUCO PARTNERSHIP |
Record Last Modified | 2015-09-24 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2007-04-09 | 5468 | 5523 | 55 |
2007-04-09 | 5542 | 5566 | 25 |
5468 | 5523 | 55 | |
5542 | 5566 | 25 | |
5468 | 5523 | 55 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 0 | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | PAC DRILLING LLC | 1512.00 | 45.00 | 346 |
2012 | PAC DRILLING LLC | 1186.00 | 0.00 | 347 |
2013 | PAC DRILLING LLC | 737.00 | 203.00 | 206 |
2015 | PAC DRILLING LLC | 0.00 | 236.00 | 194 |
2017 | PAC DRILLING LLC | 0.00 | 0.00 | 357 |
2018 | PAC DRILLING LLC | 187.00 | 0.00 | 297 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | PAC DRILLING LLC | Brine | 0 | 346 |
2012 | PAC DRILLING LLC | Brine | 0 | 347 |
2013 | PAC DRILLING LLC | Brine | 135 | 206 |
2015 | PAC DRILLING LLC | Brine | 43 | 194 |
2017 | PAC DRILLING LLC | Brine | 110 | 357 |
2018 | PAC DRILLING LLC | Brine | 0 | 297 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1066591554 | 2005-2-19 0:00: | DD | No Violations | 3.00 |
-128299096 | 2013-7-23 0:00: | PL | No Violations | 1.00 |
-1324785540 | 2020-4-15 0:00: | PW | No Violations | 1.00 |
-1612890201 | 2020-3-3 0:00:0 | PW | No Violations | 1.00 |
-858628756 | 2020-7-28 0:00: | PW | No Violations | 1.00 |
-8786742 | 2014-7-29 0:00: | PW | No Violations | 1.00 |
-966312846 | 2016-7-1 0:00:0 | PW | No Violations | 0.50 |
0008786742 | 2014-07-29 | Production Wells | No Violations | I was on location for a status check. I found during my inspection the well in production with a pumping unit. The tank battery consisted of two, 100 barrel production tanks, a 50 barrel brine tank and a separator. A dike surrounded the production equipment. An identification sign was properly posted. Bull plugs were installed on the load lines. The lease road was in stable condition and constructed of crushed stone. |
0128299096 | 2013-07-23 | Preliminary Restoration | No Violations | Everything passed according to 1509.072A. |
0966312846 | 2016-07-01 | Production Wells | No Violations | |
1066591554 | 2005-02-19 | Drill / Deepen / Reopen | No Violations | On site to witness the surface job . Arrived on location and Warren Drilling hung in the hole . The toolpusher ( Charlie Ball ) advised that the power-tongs and the cement trucks were already late . Finally got the drill unstuck and started coming out of the hole . I decided to leave the location because tomorrow is a holiday and the job wont be finished until 2 or 3 oclock in the morning . I didnt have prior approval to work the holiday . |
1108467648 | 2005-02-12 | Drill / Deepen / Reopen | No Violations | Meet with Jason Caldwell on site to while Whipstock is clearing and building location . He wanted to know about digging the drilling pits , amount of conductor pipe that they would have to run , and H2S gas in the area . I advised that according to RBDMS records most the wells in the area had from 60 to 103 of conductor pipe . I also advised that Clinton/Cgas had plugged several wells in the area due to excessive amounts of H2S gas . I also strongly recommended that they run extra cement on the production string to cover the formation producing the H2S gas. Note: Whipstock was clearing the trees off location and was going to start building location later today. The drilling rig should be moving on location Monday or Tuesday. |
1108555314 | 2005-02-15 | Drill / Deepen / Reopen | No Violations | Inspection revealed that they are finishing building the location . I talked with the dozer operator and he advised that the rain yesterday put them behind schedule . He also advised that he wasnt sure when the rig was moving onto location . No violations at this time . |
1109081276 | 2005-02-17 | Drill / Deepen / Reopen | No Violations | Inspection revealed that Warren Drilling is moving onto location . They advised that they should be ready to set surface sometime Sunday evening or early Monday morning . No violations at this time . |
1262233795 | 2016-06-21 | Production Wells | No Violations | |
1342015923 | 2012-07-05 | Production Wells | Violations Noted | The well is in production. The well is not legibly identified. I called 734-421-2719 on 7-5-2012 and again on 7-11-2012 on both occassions a message was left. Legibly identify well. |
1533498879 | 2016-07-07 | Production Wells | No Violations | |
1582568396 | 2020-2-18 0:00: | PW | No Violations | 2.00 |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1342015923 | US-OH-109869 | 2012-07-11 | Failure to legibly identify well |
For data sources see[9]