If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21085 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.4,"lon":-81.03,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Rumley Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000330 | |
Farm/Lease Name: GOTSHALL 14-12-5 | |
License Status: Producing | |
License Date: 2012-07-20 | |
Spud Date: 2012-08-26 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2012-09-12 | |
Well Total Depth: 13499.00 ft | |
Configuration: Horizontal | |
Latitude: 40.400000 | |
Longitude: -81.030000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-07-20 | Proposed Formations:POINT PLEASANT, Issued Date:7/20/2012, Expired Date:7/20/2014 12:00:00 PM, Drilling unit acres:149.5, Proposed Well Type:OG, Proposed Well Class:EDPW |
Correction to Well | 2012-07-27 | CORRECTION TO TARGET FOOTAGE. |
Reached Total Depth | 2012-09-12 | WCR IN PRELIM FILE |
Correction to Well | 2012-12-14 | UNIT SIZE DECREASED TO 129.10 ACRES. CORRECTION TO TARGET INFORMATION: FOOTAGE & X,Y COORDINATES FROM AS DRILLED SURVEY. |
Completion Report Received | 2014-02-06 | WCR IN PRELIM FILE |
Construction Permit Expires | 2014-07-20 | WCR IN PRELIM FILE |
Record Last Modified | 2017-10-24 | WCR IN PRELIM FILE |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-02-06 | 8677 | 13408 | 360 |
8677 | 13408 | 360 | |
8677 | 13408 | 360 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 11/18/2012 | 11/18/2012 | 8137.00 | 3,345,972.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Recycled Produced Water | Carrier/Base Fluid | 7.05 | |||||
100 Mesh Sand | FTS International | Proppant - Natural | Quartz | 14808-60-7 | 100.00 | 1.33 | ||
FTS | ||||||||
26.00 | ||||||||
FE 200 | FTS International | Iron Control Agent | Ethylenediaminetetraacetic acid tetrasodium salt hydrate | 64-02-8 | 41.00 | 0.00208000 | ||
Glycine, N,N-bis(carboxymethyl)-, trisodium salt | 5064-31-3 | 2.00 | 0.00010000 | |||||
Sodium hydroxide | 1310-73-2 | 1.90 | 0.00010000 | |||||
0.02536 | ||||||||
Isopropanol | ||||||||
068424-85-1 | ||||||||
Crystalline Silica (Quartz) | ||||||||
010043-35-3 | ||||||||
20.00 | ||||||||
BXL02 Borate XL FRW-200 | ||||||||
Non-Emulsifier | ||||||||
0.01248 | ||||||||
10.1 - 15 HCL | FTS International | Acid | Hydrochloric acid | 7647-01-0 | 15.00 | 0.10 | ||
Water | 7732-18-5 | 85.00 | 0.60 | |||||
2.00 | ||||||||
Monobutyl Ether) | ||||||||
Distillates, petroleum, hydrotreated light | ||||||||
010555-76-7 | ||||||||
Glutaraldehyde (Pentanediol) Quaternary
Ammonium Compound Ethanol |
||||||||
TURQUOISE-1 | ||||||||
0.00756 | ||||||||
000111-76-2 | ||||||||
000064-17-5 | ||||||||
Surfactant | ||||||||
NE-100 (NON-EMULSIFIER) | ||||||||
Additional Ingredients Not Listed on MSDS | ||||||||
12.00 | ||||||||
064742-47-8 | ||||||||
0.00103 | ||||||||
1.00 | ||||||||
60.00 | ||||||||
Potassium Hydroxide | ||||||||
Proprietary Cured Acrylic Resin
Petroleum Distillate Hydrotreated Light Guar Gum |
||||||||
Friction Reducer | ||||||||
000584-08-7 | ||||||||
009000-30-0 | ||||||||
HVG-01 | ||||||||
068439-51-0 | ||||||||
48.00 | ||||||||
Fresh Water | Carrier/Base Fluid | 75.44 | ||||||
0.00386 | ||||||||
Dioxide) | ||||||||
10.00 | ||||||||
B10 (HIGH PH BUFFER) | ||||||||
Dodecylbenzenesulfonic Acid Potassium
Carbonate Potassium Hydroxide |
||||||||
0.00586 | ||||||||
0.00208 | ||||||||
000111-30-8 | ||||||||
0.00161 | ||||||||
NaturaLine MX | ||||||||
Sodium Metaborate Tetrahydrate | ||||||||
LT Encapsulated AP Breaker (LTB01) | FTS International | Breaker | Quartz | 14808-60-7 | 25.00 | 0.02 | ||
Peroxydisulfuric acid, diammonium salt | 7727-54-0 | 100.00 | 0.10 | |||||
0.07708 | ||||||||
5.00 | ||||||||
Northern White Sand | FTS International | Proppant - Natural | Quartz | 14808-60-7 | 100.00 | 14.90 | ||
BULK) | ||||||||
2-Butoxyethanol (Ethylene Glycol | ||||||||
55.00 | ||||||||
0.01127 | ||||||||
0.00000 | ||||||||
50.00 | ||||||||
0.00733 | ||||||||
Multi-Chem | ||||||||
588-2 | ||||||||
APB01 (AMMONIUM PERSUFATE BREAKER),
B10 (HIGH PH BUFFER), BXL02 Borate XL, CI-150, FE 200, FRW-200, KCLS-4, LTB-01, NE 100 |
FTS International | Breaker, Clay Stablizer, Corrosion Inhibitor, Cross Linker, Friction Reducer, Iron Control Agent, Non-Emulsifier, pH Adjusting Agent | Proprietary Iron Control Additive (FE-200L) | |||||
Proprietary Breaker Additive (LTB-1) | ||||||||
Proprietary Friction Reducer Additive
(FRW-200 and FRW-200W) |
||||||||
Proprietary Clay Stabilizer Additive (KCLS-4) | ||||||||
Proprietary Corrosion Inhibitor Additive (CI-150) | ||||||||
Water | 7732-18-5 | |||||||
Proprietary Breaker (APB01) Additive | ||||||||
NONE | ||||||||
Breaker | ||||||||
TRADE SECRET | ||||||||
25.00 | ||||||||
KCLS4 | ||||||||
No Hazardous Components | ||||||||
Clay Stablizer | ||||||||
pH Adjusting Agent | ||||||||
007727-54-0 | ||||||||
0.01221 | ||||||||
MC B-8642 (WS) | ||||||||
027176-87-0 | ||||||||
Anti-Bacterial Agent | ||||||||
Scale Inhibitor | ||||||||
Ammonium Persulfate | ||||||||
001310-58-3 | ||||||||
Cross Linker | ||||||||
MC B 8642 WS, NaturaLine MX 588-2 | Multi-Chem Group | Anti-Bacterial Agent, Scale Inhibitor | Water | 7732-18-5 | ||||
Methanol | 67-56-1 | |||||||
Non-MSDS Components Not Provided by Supplier | ||||||||
014808-60-7 | ||||||||
0.08479 | ||||||||
Gelling Agent | ||||||||
INTERNATI ONAL | ||||||||
0.00021 | ||||||||
100.00 | ||||||||
FTS INTERNATIONAL | ||||||||
000067-63-0 | ||||||||
15.00 | ||||||||
Boric Acid | ||||||||
CI-150 (Corrosion Inhibitor) | FTS International | Corrosion Inhibitor | N,N-Dimethylformamide | 68-12-2 | 10.00 | 0.00012000 | ||
Proprietary Organic Amine Resin Salt | 30.00 | 0.00036000 | ||||||
Proprietary Quaternary Ammonium Compound | 10.00 | 0.00012000 | ||||||
Proprietary Aromatic Aldehyde | 10.00 | 0.00012000 | ||||||
Isopropanol | 67-63-0 | 60.00 | 0.00072000 | |||||
0.00308 | ||||||||
APB-01 Ammonium Persulfate Breaker | ||||||||
0.00378 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-11-19 | H2O | 15 | 7366 Bbl | 630475 | Frac Tech Services | STAGE 8
40 SHOTS |
2012-11-18 | H2O | 15 | 7244 Bbl | 575022 | Frac Tech Services | STAGE 2
40 SHOTS |
2012-11-18 | H2O | 15 | 9278 Bbl | 625345 | Frac Tech Services | STAGE 4
40 SHOTS |
2012-11-18 | H2O | 15 | 7884 Bbl | 577232 | Frac Tech Services | STAGE 1
40 SHOTS |
2012-11-19 | H2O | 15 | 8454 Bbl | 632264 | Frac Tech Services | STAGE 7
40 SHOTS |
2012-11-19 | H2O | 15 | 9343 Bbl | 628845 | Frac Tech Services | STAGE 6
40 SHOTS |
2012-11-19 | H2O | 15 | 0 Bbl | 0 | Frac Tech Services | STAGE 10
40 SHOTS |
2012-11-19 | H2O | 15 | 7542 Bbl | 619149 | Frac Tech Services | STAGE 9
40 SHOTS |
2012-11-19 | H2O | 15 | 8021 Bbl | 633927 | Frac Tech Services | STAGE 5
40 SHOTS |
2012-11-18 | H2O | 15 | 6899 Bbl | 622189 | Frac Tech Services | STAGE 3
40 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | 98194 | 4573 | 46 |
2014 | CHESAPEAKE EXPLORATION LLC | 475986 | 12100 | 340 |
2015 | CHESAPEAKE EXPLORATION LLC | 319216 | 4623 | 358 |
2016 | CHESAPEAKE EXPLORATION LLC | 231670 | 3332 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 183820 | 2136 | 355 |
2018 | CHESAPEAKE EXPLORATION LLC | 143302 | 1432 | 357 |
2019 | CHESAPEAKE EXPLORATION LLC | 38116 | 481 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | Brine | 3321 | 46 |
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 5602 | 340 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 3016 | 358 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 2576 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 1737 | 355 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 1146 | 357 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 90 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1189190551 | 2016-2-16 0:00: | PL | No Violations | 1.00 |
-1329762510 | 2013-10-3 0:00: | PL | No Violations | 0.50 |
-278112465 | 2019-8-19 0:00: | PW | No Violations | 0.80 |
-532932716 | 2012-8-27 0:00: | DD | No Violations | |
0532932716 | 2012-08-27 | Drill / Deepen / Reopen | No Violations | Arrived on location for B.O.P.test 10:00pm till 3:30 am test approved. |
1189190551 | 2016-02-16 | Preliminary Restoration | No Violations | I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. All wells on location are using the plunger lift system as the method of production. RBDMS production records indicate that the wells are in production.
The production equipment on the pad consists of the following: 10 400 bbl. Production tanks 3 Producing wells 3 Sand separators 1 Low pressure separator tower/Vapor recovery system unit. 1 Combustor 1 Horizontal heater-treater. Equipment present on the location that is not associated with the production equipment consists of: 3 18 Wheelers with trailers 1 track hoe 1 Short bed semi 1 dump truck 1 skid steer 1 power plant 2 pickup trucks 8 small trailers 1 40 foot box trailer 1 16 foot box trailer 3 fuel tanks 35 joints of 9 5/8 inch diameter casing. There was approximately 4 to 5 inches of snow on location at the time of my inspection. The site passed preliminary restoration in accordance with ORC 1509.072 A. |
1329762510 | 2013-10-03 | Preliminary Restoration | No Violations | On the day of my inspection the site passed preliminary restoration according to 1509.072A. Made phone call to Matt Amos Drilling Foreman of Chesapeake Energy Corp and he referred me to John Snook Drilling Superintendent requesting that the cellars be pumped out on the Gotshall Pad and he confirmed that it would be done today. |
1346849983 | 2012-08-27 | Drill / Deepen / Reopen | No Violations | Arrived on location for cementing of surface pipe , 13 3/8 pipe set at 615 with 530 sks of class a cement, covered job for mark moreland. He advised he wants to fill out all cement tickets when well is completed. |
1353934782 | 2012-08-22 | Drill / Deepen / Reopen | No Violations | Set 100 ft of 20 inch conductor pipe and cemented with 265 sks - O-Tex Cementing Service. 26 inch hole. Set Tin Horn and cemented in place along with the conductor pipe. Had enough return on the cement to make a goog seal between Tin Horn and 20 inch casing. |
1372141333 | 2013-07-29 | Preliminary Restoration | No Violations | Everything passed according to 1509.072A. |
95024933 | 2020-7-21 0:00: | PW | No Violations | 1.00 |
For data sources see[10]