If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21218 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.41,"lon":-81.05,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Rumley Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000363 | |
Farm/Lease Name: LONG 21-12-5 | |
License Status: Producing | |
License Date: 2013-08-09 | |
Spud Date: 2013-07-16 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2013-08-28 | |
Well Total Depth: 15410.00 ft | |
Configuration: Horizontal | |
Latitude: 40.410000 | |
Longitude: -81.050000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-07-08 | Proposed Formations:POINT PLEASANT, Issued Date:7/8/2013, Expired Date:7/8/2015 12:00:00 PM, Drilling unit acres:416.56, Proposed Well Type:OG, Proposed Well Class:EDPW |
APP | 2013-08-09 | Proposed Formations:POINT PLEASANT, Issued Date:8/9/2013, Expired Date:8/9/2015 12:00:00 PM, Drilling unit acres:416.56, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-08-28 | |
Correction to Well | 2014-04-04 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2014-07-22 | |
Construction Permit Expires | 2015-08-09 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-07-22 | 8534 | 15200 | 720 |
8534 | 15200 | 720 | |
8534 | 15200 | 720 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 04/06/2014 | 04/12/2014 | 8175 | 8,322,720.0 | 533017 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | CRC-C | FTS INTERNATIONAL | Proppant - Resin Coated | Hexamethylenetetramine (Hexamine) | 000100-97-0 | 1 | 0.02306 | 0 |
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 98 | 2.25996 | 0 | ||||
Phenol/Formaldehyde Resin | 009003-35-4 | 5 | 0.1153 | 0 | ||||
CI-150 | FTS INTERNATIONAL | Corrosion Inhibitor | Dimethyl Formamide | 000068-12-2 | 10 | 0.00014 | 0 | |
Proprietary Quaternary Ammonium Compound | TRADE SECRET | 10 | 0.00014 | 0 | ||||
Proprietary Organic Amine Resin Salt | TRADE SECRET | 30 | 0.00041 | 0 | ||||
Proprietary Aromatic Aldehyde | TRADE SECRET | 10 | 0.00014 | 0 | ||||
Isopropanol (Isopropyl Alcohol, Propan-2-ol) | 000067-63-0 | 60 | 0.00082 | 0 | ||||
BXL02E (BORATE XL- INSTANT XL) | FTS INTERNATIONAL | Cross Linker | Sodium Metaborate Tetrahydrate | 010555-76-7 | 30 | 0.01016 | 0 | |
FRW-200 | FTS INTERNATIONAL | Friction Reducer | Petroleum Distillate Hydrotreated Light | 064742-47-8 | 26 | 0.01598 | 0 | |
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 7.67473 | 0 | |
Northern White Sand | FTS INTERNATIONAL | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 5.86735 | 0 | |
LTB-01 | FTS INTERNATIONAL | Breaker | Proprietary Cured Acrylic Resin | TRADE SECRET | 25 | 0.01427 | 0 | |
Ammonium Persulfate | 007727-54-0 | 100 | 0.05708 | 0 | ||||
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 25 | 0.01427 | 0 | ||||
FE 200 | FTS INTERNATIONAL | Iron Control Agent | Trisodium Nitrilotriacetate | 005064-31-3 | 2 | 0.00011 | 0 | |
Sodium Hydroxide | 001310-73-2 | 2 | 0.0001 | 0 | ||||
Tetrasodium Ethylenediaminetetraacetate | 000064-02-8 | 41 | 0.00217 | 0 | ||||
HVG01 (TURQUOISE-1 BULK) | FTS INTERNATIONAL | Gelling Agent | Petroleum Distillate Hydrotreated Light | 064742-47-8 | 55 | 0.05739 | 0 | |
Surfactant | 068439-51-0 | 2 | 0.00209 | 0 | ||||
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 2 | 0.00209 | 0 | ||||
Guar Gum | 009000-30-0 | 50 | 0.05217 | 0 | ||||
10.1 - 15 HCL | FTS INTERNATIONAL | Acid | Water | 007732-18-5 | 85 | 0.66589 | 0 | |
Hydrochloric Acid | 007647-01-0 | 15 | 0.11751 | 0 | ||||
CS-250 SI | FTS INTERNATIONAL | Scale Inhibitor | Ethylene Glycol | 000107-21-1 | 10 | 0.00135 | 0 | |
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 79.251 | 0 | |
BXL02E (BORATE XL- INSTANT XL),
CI-150, CS-250 SI, FE 200, FRW-200, ICI-3240 (1 GAL), LTB-01 |
FTS INTERNATIONAL | Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Iron Control Agent, Scale Inhibitor | Proprietary Corrosion Inhibitor Additive (CI-150) | TRADE SECRET | 0 | 0.0007 | 0 | |
Proprietary Anti-Bacterial Additive (ICI-3240) | TRADE SECRET | 0 | 0.01224 | 0 | ||||
Water | 007732-18-5 | 0 | 0.03848 | 0 | ||||
Proprietary Friction Reducer Additive
(FRW-200 and FRW-200W) |
TRADE SECRET | 0 | 0.05756 | 0 | ||||
Non-MSDS Components Not Provided by Supplier | NOT PROVIDED | 0 | 0 | 0 | ||||
Proprietary Breaker Additive (LTB-1) | TRADE SECRET | 0 | 0.01621 | 0 | ||||
Proprietary Iron Control Additive (FE-200L) | TRADE SECRET | 0 | 0.0037 | 0 | ||||
ICI-3240 (1 GAL) | FTS INTERNATIONAL | Anti-Bacterial Agent | Sodium Hydroxide | 001310-73-2 | 4 | 0.00057 | 0 | |
Dazomet | 000533-74-4 | 24 | 0.0034 | 0 | ||||
100 Mesh Sand | FTS INTERNATIONAL | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 3.82637 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-04-10 | H2O | 15 | 5075 Bbl | 327000 | Frac Tech Services | STAGE 15
30 SHOTS |
2014-04-08 | H2O | 15 | 5159 Bbl | 324500 | Frac Tech Services | STAGE 6
30 SHOTS |
2014-04-10 | H2O | 15 | 5044 Bbl | 325000 | Frac Tech Services | STAGE 16
30 SHOTS |
2014-04-09 | H2O | 15 | 5113 Bbl | 325000 | Frac Tech Services | STAGE 11
30 SHOTS |
2014-04-12 | H2O | 15 | 4983 Bbl | 322080 | Frac Tech Services | STAGE 22
30 SHOTS |
2014-04-07 | H2O | 15 | 5206 Bbl | 326900 | Frac Tech Services | STAGE 2
30 SHOTS |
2014-04-11 | H2O | 15 | 5107 Bbl | 327000 | Frac Tech Services | STAGE 20
30 SHOTS |
2014-04-11 | H2O | 15 | 5364 Bbl | 327000 | Frac Tech Services | STAGE 21
30 SHOTS |
2014-04-09 | H2O | 15 | 5163 Bbl | 327000 | Frac Tech Services | STAGE 12
30 SHOTS |
2014-04-11 | H2O | 15 | 5128 Bbl | 327500 | Frac Tech Services | STAGE 17
30 SHOTS |
2014-04-07 | H2O | 15 | 5181 Bbl | 324700 | Frac Tech Services | STAGE 5
30 SHOTS |
2014-04-12 | H2O | 15 | 4803 Bbl | 325500 | Frac Tech Services | STAGE 23
30 SHOTS |
2014-04-09 | H2O | 15 | 4969 Bbl | 326000 | Frac Tech Services | STAGE 13
30 SHOTS |
2014-04-20 | H2O | 15 | 4748 Bbl | 325000 | Frac Tech Services | STAGE 1
30 SHOTS |
2014-04-08 | H2O | 15 | 5195 Bbl | 323500 | Frac Tech Services | STAGE 8
30 SHOTS |
2014-04-11 | H2O | 15 | 5174 Bbl | 324800 | Frac Tech Services | STAGE 18
30 SHOTS |
0 | 0 | 0 | ||||
2014-04-07 | H2O | 15 | 5171 Bbl | 326100 | Frac Tech Services | STAGE 3
30 SHOTS |
2014-04-08 | H2O | 15 | 5230 Bbl | 323500 | Frac Tech Services | STAGE 7
30 SHOTS |
2014-04-10 | H2O | 15 | 5321 Bbl | 326002 | Frac Tech Services | STAGE 14
30 SHOTS |
0 | 0 | 0 | ||||
2014-04-12 | H2O | 15 | 3488 Bbl | 326000 | Frac Tech Services | STAGE 24
30 SHOTS |
2014-04-08 | H2O | 15 | 5173 Bbl | 325000 | Frac Tech Services | STAGE 9
30 SHOTS |
2014-04-09 | H2O | 15 | 5143 Bbl | 323500 | Frac Tech Services | STAGE 10
30 SHOTS |
2014-04-07 | H2O | 15 | 5090 Bbl | 325800 | Frac Tech Services | STAGE 4
30 SHOTS |
2014-04-11 | H2O | 15 | 5052 Bbl | 326800 | Frac Tech Services | STAGE 19
30 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | 550455 | 27705 | 228 |
2015 | CHESAPEAKE EXPLORATION LLC | 747724 | 17666 | 361 |
2016 | CHESAPEAKE EXPLORATION LLC | 467581 | 7533 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 353794 | 4502 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 282064 | 2971 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 63579 | 886 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 16793 | 228 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 13719 | 361 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 7017 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 3378 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 2044 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 985 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1751373319 | 2013-10-3 0:00: | PL | No Violations | 0.20 |
0448697236 | 2016-02-16 | Preliminary Restoration | No Violations | I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. Wells with permit numbers 34067212200000 and 34067211080000 are operated by a plunger lift system. Permitted well number 3406721218000 is a reservoir pressure driven well. RBDMS production records indicate that the wells are in production.
The production equipment on the pad consists of the following: 7 400 bbl. Production tanks 3 Producing wells 3 Sand separators 1 Low pressure separator tower/Vapor recovery system unit. 1 Combustor 1 Gas compressor unit. 1 Horizontal heater-treater. There was approximately 4 to 5 inches of snow on location at the time of my inspection. The site passed preliminary restoration in accordance with ORC 1509.072 A. |
1376675603 | 2013-08-16 | Casing String Witnessed | No Violations | I am on site today to witness the running and the cementing of the 13-3/8 inch diameter casing string. Nomac Drilling Rig # 71 drilled a 17-1/2 inch diameter hole to 638 ft and set 628ft of casing. Schlumberger Cementing Service c/w 554 sks of class A cement. Was advised at 6 am that they would be done cementing at 11 am. I found them on schedule and the casing would not make up and job ran over. |
1751373319 | 2013-10-03 | Preliminary Restoration | No Violations | On the day of my inspection the site passed preliminary restoration according to 1509.072A. |
221589023 | 2020-4-8 0:00:0 | PW | No Violations | 1.00 |
448697236 | 2016-2-16 0:00: | PL | No Violations | 0.50 |
623339855 | 2019-8-22 0:00: | PW | No Violations | 0.70 |
For data sources see[10]