X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-151-24358

Well Details

Well ID: 34-151-24358
Loading map...
Country: United States
State: Ohio
County: Stark
Municipality: Bethlehem Township
Operator Name: EVERFLOW EASTERN PARTNERS LP
Well Pad ID:
Farm/Lease Name: LORETTO UNIT
License Status: Producing
License Date: 1987-05-20
Spud Date: 1987-12-19
Spud Drilling Contractor: EDCO DRLG
Final Drill Date: 1987-12-28
Well Total Depth: 4425.00 ft
Configuration: Vertical
Latitude: 40.710000
Longitude: -81.530000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1987-05-20 Issued Date 5/20/87 Expired Date 5/19/88 Acres 0050960 Tool Type RTA Proposed Formation CLINTON Proposed Depth 04425 Proposed Drill Depth 04425
Original Spud 1987-12-19
Completed 1987-12-28
Reached Total Depth 1987-12-28
CO 1988-01-04 84 EVERFLOW EASTERN PTNS L P GeoDate 5/20/87
Completion Report Received 1988-01-27
Construction Permit Expires 1988-05-19
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 4202 4304 0
4202 4304 0
2006-09-11 4217 4226 8
4217 4226 8
4202 4304 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 101890 Gal 65000 FRAC: H2O,SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1988 EVERFLOW EASTERN PARTNERS LP 13811.00 181.00 132
1989 EVERFLOW EASTERN PARTNERS LP 13955.00 375.00 365
1990 EVERFLOW EASTERN PARTNERS LP 4510.00 191.00 365
1991 EVERFLOW EASTERN PARTNERS LP 2607.00 0.00 365
1992 EVERFLOW EASTERN PARTNERS LP 1270.00 0.00 365
1993 EVERFLOW EASTERN PARTNERS LP 813.00 0.00 365
1994 EVERFLOW EASTERN PARTNERS LP 849.00 92.00 365
1995 EVERFLOW EASTERN PARTNERS LP 304.00 31.00 365
1996 EVERFLOW EASTERN PARTNERS LP 131.00 0.00 365
1997 EVERFLOW EASTERN PARTNERS LP 453.00 35.00 365
1998 EVERFLOW EASTERN PARTNERS LP 3768.00 145.00 365
1999 EVERFLOW EASTERN PARTNERS LP 3690.00 95.00 365
2000 EVERFLOW EASTERN PARTNERS LP 1933.00 47.00 365
2001 EVERFLOW EASTERN PARTNERS LP 3100.00 0.00 365
2002 EVERFLOW EASTERN PARTNERS LP 2128.00 43.00 365
2003 EVERFLOW EASTERN PARTNERS LP 1654.00 40.00 365
2004 EVERFLOW EASTERN PARTNERS LP 1309.00 0.00 365
2005 EVERFLOW EASTERN PARTNERS LP 1217.00 41.00 365
2006 EVERFLOW EASTERN PARTNERS LP 1401.00 0.00 365
2007 EVERFLOW EASTERN PARTNERS LP 1254.00 40.00 365
2008 EVERFLOW EASTERN PARTNERS LP 935.00 42.00 365
2009 EVERFLOW EASTERN PARTNERS LP 837.00 0.00 365
2010 EVERFLOW EASTERN PARTNERS LP 510.00 40.00 365
2011 EVERFLOW EASTERN PARTNERS LP 657.00 0.00 365
2012 EVERFLOW EASTERN PARTNERS LP 712.00 38.00 216
2013 EVERFLOW EASTERN PARTNERS LP 514.00 0.00 95
2014 EVERFLOW EASTERN PARTNERS LP 1061.00 37.00 170
2015 EVERFLOW EASTERN PARTNERS LP 673.00 0.00 365
2016 EVERFLOW EASTERN PARTNERS LP 264.00 0.00 365
2017 EVERFLOW EASTERN PARTNERS LP 1700.00 36.00 365
2018 EVERFLOW EASTERN PARTNERS LP 1351.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1988 EVERFLOW EASTERN PARTNERS LP Brine 198 132
1989 EVERFLOW EASTERN PARTNERS LP Brine 278 365
1990 EVERFLOW EASTERN PARTNERS LP Brine 74 365
1991 EVERFLOW EASTERN PARTNERS LP Brine 35 365
1992 EVERFLOW EASTERN PARTNERS LP Brine 17 365
1993 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1994 EVERFLOW EASTERN PARTNERS LP Brine 41 365
1995 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1996 EVERFLOW EASTERN PARTNERS LP Brine 45 365
1997 EVERFLOW EASTERN PARTNERS LP Brine 162 365
1998 EVERFLOW EASTERN PARTNERS LP Brine 130 365
1999 EVERFLOW EASTERN PARTNERS LP Brine 210 365
2000 EVERFLOW EASTERN PARTNERS LP Brine 51 365
2001 EVERFLOW EASTERN PARTNERS LP Brine 82 365
2002 EVERFLOW EASTERN PARTNERS LP Brine 62 365
2003 EVERFLOW EASTERN PARTNERS LP Brine 28 365
2004 EVERFLOW EASTERN PARTNERS LP Brine 40 365
2005 EVERFLOW EASTERN PARTNERS LP Brine 24 365
2006 EVERFLOW EASTERN PARTNERS LP Brine 45 365
2007 EVERFLOW EASTERN PARTNERS LP Brine 25 365
2008 EVERFLOW EASTERN PARTNERS LP Brine 30 365
2009 EVERFLOW EASTERN PARTNERS LP Brine 63 365
2010 EVERFLOW EASTERN PARTNERS LP Brine 40 365
2011 EVERFLOW EASTERN PARTNERS LP Brine 25 365
2012 EVERFLOW EASTERN PARTNERS LP Brine 0 216
2013 EVERFLOW EASTERN PARTNERS LP Brine 0 95
2014 EVERFLOW EASTERN PARTNERS LP Brine 38 170
2015 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2016 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2017 EVERFLOW EASTERN PARTNERS LP Brine 76 365
2018 EVERFLOW EASTERN PARTNERS LP Brine 38 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0000PL5064 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
1486668224 2017-01-25 Production Wells No Violations I conducted a status check inspection on this well. The well is equipped with a pumpjack with a gas motor. It has a production report submitted for 2015. The well is legibly identified. The diked tank battery consists of one 100 barrel tank, 2 horizontal separators and one inground concrete brine vault. The tank Battery is shared with well #151-24357 (Lorretto #1). There are no compliance issues noted at this time.
PL5064 PL No Violations

For data sources see[9]

References