34-005-23842

Well Details

Well ID: 34-005-23842
Loading map...
Country: United States
State: Ohio
County: Ashland
Municipality: Perry Township
Operator Name: DEEP RESOURCES LLC
Well Pad ID:
Farm/Lease Name: HASTINGS
License Status: Active Injection
License Date: 1986-07-10
Spud Date: 1986-07-16
Spud Drilling Contractor: WALTZ BROS DRLG
Final Drill Date: 1986-07-24
Well Total Depth: 778.00 ft
Configuration: Vertical
Latitude: 40.890000
Longitude: -82.140000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Enhanced Recovery 1986-07-10 Issued Date 7/10/86 Expired Date 7/10/87 Acres 0081750 Tool Type RTA Proposed Formation BEREA Proposed Depth 00778 Proposed Drill Depth 00778
Original Spud 1986-07-16 LOG TYPE=LASERLOG, SIX ARM
Completed 1986-07-24 LOG TYPE=LASERLOG, SIX ARM
Reached Total Depth 1986-07-24 LOG TYPE=LASERLOG, SIX ARM
CO 1986-10-31 133 QUAKER STATE OIL REF CORP GeoDate 7/10/86
First Injection 1986-10-31 LOG TYPE=LASERLOG, SIX ARM
Completion Report Received 1987-01-14 LOG TYPE=LASERLOG, SIX ARM
Construction Permit Expires 1987-07-10 LOG TYPE=LASERLOG, SIX ARM
CO 1995-10-18 182 BELDEN & BLAKE CO GeoDate 7/10/86
Annulus Pressure Monitoring Approved 1998-12-08 LOG TYPE=LASERLOG, SIX ARM
Change of Owner 2002-02-07 Operator changed from 182, BELDEN & BLAKE CORPORATION to 2491, MILLER ROY/RA MILLER ENER
Change of Owner 2008-04-24 Operator changed from 2491, MILLER ROY/RA MILLER ENER to 8227, DEEP RESOURCES LLC
Last Compliance Report 2018-05-29 LOG TYPE=LASERLOG, SIX ARM
Record Last Modified 2018-05-29 LOG TYPE=LASERLOG, SIX ARM

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2000-05-22 546 605 0
2000-05-22 638 702 0
638 702 0
546 605 0
546 605 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
NITR 0 246 Qts 0 SHOT: NITRO 246 QT

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1986 QUAKER STATE OIL REF CORP 0.00 1148.00 365
1988 QUAKER STATE OIL REF CORP 0.00 1152.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1986 QUAKER STATE OIL REF CORP Brine 825 365
1988 QUAKER STATE OIL REF CORP Brine 1197 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-103930328 2013-3-5 0:00:0 ER No Violations
-1452444179 2003-11-13 0:00 ER No Violations
-1741587407 2019-1-9 0:00:0 ER No Violations
-1819205778 2007-11-1 0:00: ER No Violations 0.50
-1965619142 2018-1-18 0:00: ER No Violations
-249733719 2017-11-2 0:00: ER No Violations
-258158262 2020-4-16 0:00: ER No Violations
-330247968 2016-11-1 0:00: ER No Violations
-362146831 2014-3-18 0:00: ER No Violations
-390442285 2016-4-15 0:00: ER No Violations
-467455293 2018-7-5 0:00:0 ER No Violations
-541763687 2017-1-5 0:00:0 ER No Violations
-570032736 2019-4-18 0:00: ER No Violations
-577446593 2014-5-6 0:00:0 ER No Violations
-600858035 2005-12-16 0:00 ER No Violations 0.50
-823321022 2012-9-20 0:00: ER No Violations
-832566977 2018-4-17 0:00: ER No Violations
-856287720 2014-8-18 0:00: ER No Violations
-878944937 2006-11-28 0:00 ER No Violations 0.50
0005670549 2011-07-11 Enhanced Recovery Project No Violations Inspect well.
0103930328 2013-03-05 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0159820577 2015-05-21 Enhanced Recovery Project No Violations Inspect well for integrity and pressure. Well head is heavily rusted with slow seeps. The injection test valve is rusted shut. The injection well head fitting was subsequently repaired and replaced.
0249733719 2017-11-02 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0259162161 2005-04-27 Enhanced Recovery Project No Violations Injection well test.
0311021254 2011-11-17 Enhanced Recovery Project No Violations Inspect well.
0330247968 2016-11-01 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0352987314 2013-10-29 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0362146831 2014-03-18 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0390442285 2016-04-15 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0467455293 2018-07-05 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0541763687 2017-01-05 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0577446593 2014-05-06 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0600858035 2005-12-16 Enhanced Recovery Project No Violations Injection and annulus pressure test.
0622932738 2017-07-17 Enhanced Recovery Project No Violations Inspect well for integrity and pressure. The initial annulus pressure was 300 psi. Witness operator conduct a monthly pressure test. The pressure on the annulus was released to zero then pressured up to 400 psi and monitored for fifteen minutes with no pressure loss. Well is in compliance.
0637867481 2018-10-01 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0661140658 2008-04-03 Enhanced Recovery Project No Violations Annulus and injection pressure test.
0823321022 2012-09-20 Enhanced Recovery Project No Violations Inspect Well. Site ok.
0832566977 2018-04-17 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0856287720 2014-08-18 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0878944937 2006-11-28 Enhanced Recovery Project No Violations Injection and annulus pressure test.
0883603209 2017-04-27 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
0905880715 2004-11-17 Enhanced Recovery Project No Violations Injection pressure test. Well must be re-tested in 30 days and reported to Tom Tomastik.
1046143432 2013-05-22 Enhanced Recovery Project No Violations Inspect well for integrity and pressure. Injector line is seeping.
1053737779 2007-05-22 Enhanced Recovery Project No Violations Injection and annulus pressure test.
1111998242 2004-04-21 Enhanced Recovery Project No Violations Injection pressure test.
1295160304 2016-07-07 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
1312127703 2012-05-24 Enhanced Recovery Project No Violations Inspect Well.
1351781528 2019-7-9 0:00:0 ER No Violations
1364446441 2012-02-27 Enhanced Recovery Project No Violations Inspect Well.
1426725746 2006-05-10 Enhanced Recovery Project No Violations Injection and annulus pressure test.
1447689417 2015-10-26 Enhanced Recovery Project No Violations Inspect well for integrity and pressure. Well head is in poor condition. Steel tubing has rusted away and the PVC liner is showing. The well head is bent over at an angle. No leaks at this time.
1452444179 2003-11-13 Enhanced Recovery Project No Violations
1455635955 2016-02-12 Work Over Reconditioning No Violations The operator installed 19 joints (475 feet) of new sealtite lined tubing (PVC lined) with two 6 inch change overs on a parmaco packer set in compression at a depth of 477 feet on December 8, 1998. During the October 26, 2015 inspection of the well the tubing was observed to be deteriorated above the well head and the PVC liner was visible. In February of 2016 the operator rigged up the service rig on the well and pulled the parmaco packer up-hole, 12 inches, without releasing the packer. The deteriorated tubing was cut off and the remaining tubing was threaded and the well head reconstructed. The packer is set at 476 feet with 474 feet of one inch PVC lined tubing and two 6 inch change overs. The well was loaded with fresh water and corrosion inhibitor and pressure tested by the operator. At the time the MIT was conducted the annulus pressure was at 330 psi. The operator was requested to pressure up the annulus above 350 psi. The annulus was pressured up to 400 psi and the pressure monitored for a period of 15 minutes with zero loss in pressure. The well passed the Mechanical Integrity test. The operator was notified that the well can be put into production.
1458303159 2015-03-19 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
1464144642 2010-04-06 Enhanced Recovery Project No Violations Injection and annulus pressure test.
1526409953 2018-05-15 Enhanced Recovery Project Violations Noted Operator pressured annulus up to 405 psi. The pressure was 370 psi after 15 minute monitoring period. The pressure loss exceeded the allowable limit of five percent. The well was shut in.
1527598165 2018-05-22 Work Over Reconditioning No Violations The operator pulled the tubing and packer. The change over above the packer was rusted away. The exiting one inch PVC lined Sealtite tubing was run in the hole, with a new manufactured Parmaco style packer. One joint of pipe was replaced. There are 18 full joints of pipe and one joint that is 23 feet long, and a one foot change over sub. The well was loaded and circulated with 250 gallons of fresh water with rust inhibitor. The packer was set and well head constructed. The well was initially pressured up to 375 psi. the pressure was monitored for 15 minutes with a loss of 4.5 percent to 353 psi. The pressure was monitored for an additional five minutes and the final test pressure was 353 psi. The pressure loss was within the allowed margin of five Percent. The operator was allowed to connect the flow lines and put the well into production.
1534911296 2014-10-28 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
1581598964 2020-1-27 0:00: ER No Violations
159820577 2015-5-21 0:00: ER No Violations
1662324751 2009-04-24 Enhanced Recovery Project No Violations Injection and annulus pressure test.
1686208053 2008-12-18 Enhanced Recovery Project No Violations Injection and annulus pressure test.
1786185395 2011-04-14 Enhanced Recovery Project No Violations Injection and annulus pressure test.
1819205778 2007-11-01 Enhanced Recovery Project No Violations Injection and annulus pressure test.
1820945149 2012-12-04 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
1965619142 2018-01-18 Enhanced Recovery Project No Violations Inspect well for integrity and pressure.
2016005852 2009-09-30 Enhanced Recovery Project No Violations Injection and annulus pressure test.
2054938638 2019-11-18 0:00 ER No Violations
2127372667 2010-12-02 Enhanced Recovery Project No Violations Injection and annulus pressure test.
259162161 2005-4-27 0:00: ER No Violations 0.50
311021254 2011-11-17 0:00 ER No Violations
352987314 2013-10-29 0:00 ER No Violations
5670549 2011-7-11 0:00: ER No Violations
622932738 2017-7-17 0:00: ER No Violations
637867481 2018-10-1 0:00: ER No Violations
661140658 2008-4-3 0:00:0 ER No Violations 0.50
883603209 2017-4-27 0:00: ER No Violations
905880715 2004-11-17 0:00 ER No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1526409953 US-OH-114589 2018-09-26 9-5-10(H) Mechanical failure/contamination

For data sources see[9]