Well Details

Well ID: 34-005-24204
Loading map...
Country: United States
State: Ohio
County: Ashland
Municipality: Mifflin Township
Operator Name: COLUMBIA GAS TRANSMISSION LLC
Well Pad ID:
Farm/Lease Name: HAROLD EMMONS #1
License Status: Storage Well
License Date: 2018-07-11
Spud Date: 2018-07-12
Spud Drilling Contractor: H A D INC
Final Drill Date: 2018-08-25
Well Total Depth: 4864.00 ft
Configuration: Horizontal
Latitude: 40.800000
Longitude: -82.340000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Correction to Well 2018-02-08 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
APP 2018-07-11 Proposed Formations:CLINTON SANDSTONE, Issued Date:7/11/2018, Expired Date:7/10/2020 12:00:00 PM, Drilling unit acres:86, Proposed Well Type:GS, Proposed Well Class:POOL
Reached Total Depth 2018-08-25
Completion Report Received 2019-01-22
Record Last Modified 2019-06-05
Construction Permit Expires 2020-07-10

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
Other Treatment Type 0 0 0 COIL TUBING/ACIDIZING

SEE IMAGES

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1145991156 2018-7-11 0:00: DD No Violations
-115051641 2018-8-22 0:00: DD No Violations
-14035933 2018-8-10 0:00: DD No Violations
-433591031 2020-4-13 0:00: SO No Violations
0014035933 2018-08-10 Drill / Deepen / Reopen No Violations HAD rig 249 is rigged up on the well and is preparing to resume drilling.
0102461120 2019-03-07 Storage Well No Violations Performed annual inspection for Columbia Gas Storage Well #12606 on 03/07/2019. The well is equipped with a flanged wellhead with 1-master valve and 1-wing valve, and a drip. Well identification is clearly displayed. No problems were noted at the time of the inspection.
0115051641 2018-08-22 Drill / Deepen / Reopen No Violations HAD Drilling reached total depth. The rig is pulling the drill string from the well and preparing to run 7 inch production casing. The cement job is planned for 10 PM.
0428996199 2018-07-23 Drill / Deepen / Reopen No Violations HAD is drilling surface hole at 340 feet on fresh water.
0504021261 2018-08-23 Casing String Witnessed No Violations Halliburton is on location cementing 7 inch production casing in the well. The casing is set on an inflatable packer at 3082 feet. The well circulated during the cement job and no problems were observed.
0627804744 2018-07-24 Drill / Deepen / Reopen No Violations The operator requested inspection to witness surface casing cement. HAD Drilling installed 13.375 inch casing in the well and the casing was cemented by Petroset. The well circulated and cement returned to surface.
0700545296 2018-07-19 Drill / Deepen / Reopen No Violations HAD is on location working on rigging up. They plan to start drilling Monday, 7/23/18.
0799887734 2018-07-12 Drill / Deepen / Reopen No Violations HAD Drilling moved the concentric drill rig in to set 20 inch conductor casing. Drilling has started.
102461120 2019-3-7 0:00:0 SO No Violations
1145991156 2018-07-11 Drill / Deepen / Reopen No Violations HAD Drilling has moved 20 inch casing to the location. The air compressor for the concentric drill rig is on location and a dog house is on location. The permit was issued today.
1264437714 2018-07-17 Drill / Deepen / Reopen No Violations Conductor casing was installed in the well by concentric drilling. The conductor rig is off location. Liner and rig mats are being installed in preparation for the downhole rig.
1534346944 2018-08-15 Casing String Witnessed No Violations The operator requested inspection to witness intermediate casing cement. Petroset Cementing Service cemented the casing in the well. No problems observed.
1535725791 2018-08-29 Drill / Deepen / Reopen No Violations The drilling rig has moved out. Rick Conley of Columbia gas is on location. HAD is moving out support equipment for the rig.
1536764060 2018-09-12 Drill / Deepen / Reopen No Violations Columbia Gas is conducting flow testing on the well. Gas is being flared off. Fesco Petroleum Engineers and Mac Oil personnel are on location. Flaring will be conducted until 6 pm.
1716426528 2018-08-14 Drill / Deepen / Reopen No Violations Rick Conley of Columbia Gas stated they would be cementing intermediate casing at 2 PM today. The rig just started running casing in the well. The job is being delayed until the rig gets the casing landed. At that time they will circulate 2 hours to condition the wellbore prior to cementing.
428996199 2018-7-23 0:00: DD No Violations
504021261 2018-8-23 0:00: CS No Violations
627804744 2018-7-24 0:00: DD No Violations
700545296 2018-7-19 0:00: DD No Violations
799887734 2018-7-12 0:00: DD No Violations