If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-151-25673 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.78,"lon":-81.51,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR | |
Well Pad ID: | |
Farm/Lease Name: FRIENDSHIP BAPTIST | |
License Status: Producing | |
License Date: 2009-07-01 | |
Spud Date: 2010-05-22 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 2010-05-28 | |
Well Total Depth: 6869.00 ft | |
Configuration: Vertical | |
Latitude: 40.780000 | |
Longitude: -81.510000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-07-01 | Proposed Formations:OHIO SHALE THRU TREMPEALEAU, Issued Date:7/1/2009, Expired Date:7/1/2010 6:00:00 AM, Drilling unit acres:45.32, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2010-05-28 | |
Plugged Back | 2010-05-29 | |
Construction Permit Expires | 2010-07-01 | |
Correction to Well | 2010-07-16 | DECREASE IN UNIT SIZE TO 40 ACRES. |
Completion Report Received | 2010-08-24 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-10-27 | 4210 | 4278 | 60 |
4210 | 4278 | 60 | |
4210 | 4278 | 60 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2010-06-22 | H2O | 15 | 2670 Bbl | 80000 | Producers Service Corporation | 1000 GALLONS IC ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | OHIO VALLEY ENERGY SYSTEMS COR | 43522.00 | 0.00 | 365 |
2012 | OHIO VALLEY ENERGY SYSTEMS COR | 34891.00 | 0.00 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | 30565.00 | 0.00 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | 36174.00 | 0.00 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | 33973.00 | 0.00 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | 22393.00 | 179.00 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | 16232.00 | 0.00 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | 12824.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
2012 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 77 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 60 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 72 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 51 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1091674764 | 2010-5-4 0:00:0 | DD | No Violations | |
-1526207800 | 2010-3-23 0:00: | DD | No Violations | |
0177230565 | 2010-06-08 | Preliminary Restoration | No Violations | The drilling pits are being solidified today. |
0298917174 | 2010-06-01 | Drill / Deepen / Reopen | No Violations | Wildcat Drilling is rigging down and moving off of the location. |
1091674764 | 2010-05-04 | Drill / Deepen / Reopen | No Violations | Jay Cheslock received a complaint call from Lucille Parker (330-832-1937) on 5-4-2010 regarding activity at the new drilling location near her home at 929 3rd St. SE in Massillon, OH. I inspected the site and met with John Rose, who was building the access road and pushing topsoil. I also met with Lucille Parker and discussed the future drilling activities at the site. |
1274728736 | 2010-05-22 | Drill / Deepen / Reopen | No Violations | Wildcat Drilling is moving onto the location and will spud the well tonight. I met with John Howell and discussed the urban drilling requirements. |
1275072788 | 2010-05-26 | Drill / Deepen / Reopen | No Violations | Dusting at 4470. Drilling pits and liners are intact. |
1275412521 | 2010-05-29 | Drill / Deepen / Reopen | No Violations | The Rose Run was dry. Petroset pumped the Rose Run, Trenton, and thief plugs thru drill pipe. The well was plugged back to the Clinton Sandstone. 4-1/2 dia casing was run thru the Clinton Sandstone and cemented. |
1275938009 | 2010-06-03 | Drill / Deepen / Reopen | No Violations | The location and the drilling pits are fenced. The drilling pits are 1/2 full. There are 2 - 500 bbl frac tanks on the location. |
1277923044 | 2010-06-29 | Preliminary Restoration | No Violations | The well has been completed. The drilling pits are closed. There is 1 - 300 bbl frac tank on the location. |
1281030277 | 2010-05-28 | Drill / Deepen / Reopen | No Violations | Switched over to fluid drilling at 6593. Reached T.D. of 6869 Will trip out of the hole to log. |
1285462867 | 2010-09-23 | Preliminary Restoration | No Violations | The well is ready to go into production and the reclamation is nearly completed at the site. I called Dale Nething (Ohio Valley) and requested additional seeding at the site. I did not pass the Preliminary Restoration at this time. |
1326809656 | 2012-01-06 | UrbanPreliminary Restoration | No Violations | On 1/6/2012, I performed a status check on the above well site. The well is in production, the site is reclaimed and identification signs are posted. The Preliminary Restorstion is PASSED. |
1526207800 | 2010-03-23 | Drill / Deepen / Reopen | No Violations | I met with Dale Nething (Ohio Valley Energy) and John Howell (Wildcat Drilling) to discuss the future location of the drilling pits. This well will be drilled before July 2010. |
1526301345 | 2010-05-23 | Drill / Deepen / Reopen | No Violations | Petroset cemented 11-3/4 dia conductor casing. The drilling pits are fenced off and the pit liners are intact. |
1594307993 | 2010-07-13 | Preliminary Restoration | No Violations | The tank battery is set and the location is graded but not seeded. |
177230565 | 2010-6-8 0:00:0 | PL | No Violations | |
1819843662 | 2010-05-24 | Drill / Deepen / Reopen | No Violations | Universal cemented 8-5/8 dia surface casing. The drilling pits are fenced off and the pit liners are intact. |
2076440435 | 2014-03-24 | Production Wells | No Violations | During my inspection I found this well to be plugged back from the Rose Run formation to the Clinton Sandstone and is currently a production well, not plugged and abandoned as listed on RBDMS. I found a fenced tank battery with a 100 bbl production tank, 50 bbl poly brine tank and a horizontal separator. The tank battery and well have proper I.D. signs. The well is a plunger lift well that is fenced. The location has vegetation established and landscaping in place. There are no violations at this time. |
298917174 | 2010-6-1 0:00:0 | DD | No Violations |
For data sources see[9]