X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-121-24240

Well Details

Well ID: 34-121-24240
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Beaver Township
Operator Name: DIVERSIFIED PRODUCTION LLC
Well Pad ID:
Farm/Lease Name: MORRIS PATRICIA
License Status: Producing
License Date: 2007-08-23
Spud Date: 2008-01-10
Spud Drilling Contractor: G & L DRILLING
Final Drill Date: 2008-01-18
Well Total Depth: 4530.00 ft
Configuration: Vertical
Latitude: 39.900000
Longitude: -81.290000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2007-08-23 Proposed Formations:BEREA THRU ORISKANY, Issued Date:8/23/2007, Expired Date:8/22/2008 6:00:00 AM, Drilling unit acres:85.36, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2008-01-18
Completion Report Received 2008-07-31
Construction Permit Expires 2008-08-22
Change of Owner 2014-02-06 Operator changed from 79, OXFORD OIL to 9216, ECLIPSE RESOURCES-OHIO LLC
Change of Owner 2016-08-02 Operator changed from 9216, ECLIPSE RESOURCES-OHIO LLC to 8685, M & R INVESTMENTS OHIO LLC
Record Last Modified 2016-08-04

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2008-10-16 1712 1800 18
2008-10-16 1626 1634 9
1626 1634 9
1712 1800 18
1878 1924 12
1966 2090 22
2120 2148 10
1626 1634 9
2008-10-16 1878 1924 12
2008-10-16 2120 2148 10
2008-10-16 1966 2090 22

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 6300 Bbl 50000 FRACED THROUGH 4.5" SLOTTED LINER
H2O 0 6190 Bbl 50000 FRACED UNITS IN OHIO SHALE INCLUDE THE GANTZ, THIRTY FOOT, GORDON, AND FIFTH SANDS

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 OXFORD OIL 4786.00 53.00 0
2009 OXFORD OIL 11928.00 218.00 0
2010 OXFORD OIL 9918.00 90.00 365
2011 OXFORD OIL 7230.00 118.00 0
2012 OXFORD OIL 5372.00 84.00 0
2013 ECLIPSE RESOURCES-OHIO LLC 4307.00 53.00 365
2014 ECLIPSE RESOURCES-OHIO LLC 3552.00 83.00 365
2015 ECLIPSE RESOURCES-OHIO LLC 2584.00 37.00 365
2016 ECLIPSE RESOURCES-OHIO LLC 0.00 0.00 365
2017 M & R INVESTMENTS OHIO LLC 3739.00 41.00 365
2018 M & R INVESTMENTS OHIO LLC 2951.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 OXFORD OIL Brine 3066
2009 OXFORD OIL Brine 270
2010 OXFORD OIL Brine 132 365
2011 OXFORD OIL Brine 145
2012 OXFORD OIL Brine 90
2013 ECLIPSE RESOURCES-OHIO LLC Brine 30 365
2014 ECLIPSE RESOURCES-OHIO LLC Brine 40 365
2015 ECLIPSE RESOURCES-OHIO LLC Brine 35 365
2016 M & R INVESTMENTS OHIO LLC Brine 57 365
2017 M & R INVESTMENTS OHIO LLC Brine 40 365
2018 M & R INVESTMENTS OHIO LLC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0286278085 2017-08-31 Production Wells No Violations The purpose of my inspection was a status check. During my inspection the well was equipped with 4.5 inch diameter production casing with a tubing head, 1. 5 inch diameter tubing, rods, and a pumping unit. Production valves were in the open position. The production equipment consisted of one 100 barrel tank, one 1550 gallon tank, one drip, one vertical separator, and one chart meter. All equipment was within an earthen dike. The identification was located on the meter and the production records were current.
1200480037 2008-01-15 Drill / Deepen / Reopen No Violations On site to witness BOP test,drill crew hooked up BOP and ran 10 jt. Pipe in hole closed unit and applied pressure@250 psi and monitored pressure for 15 min. declined 10psi during test instructed driller to have 4 valve replaced or repaired noticed small amount of air bleeding out of valve he stated that he would bring it to supervisors attention.
1444533221 2008-01-09 Drill / Deepen / Reopen No Violations Stopped by drilling rig for update on potential surface job,G&L Drilling was moving in on site and setting up new drilling machine its a Ingresol Rand RD 20 long tower it appears that operator is trying to upgrade equiptment and personnel should be ready for surface job 1/11/08?.
1633985380 2010-04-09 Preliminary Restoration No Violations Restoration work at site satisfactory pit has been filled in and site reclaimed and vegetation has been established.

Note: Well is equipped with pumping unit and tubing and rods and 2-100 bbl tanks and separator within dike area.

286278085 2017-8-31 0:00: PW No Violations 1.00

For data sources see[9]

References