X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-121-24435

Well Details

Well ID: 34-121-24435
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Beaver Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-000626
Farm/Lease Name: DOLLISON UNIT
License Status: Producing
License Date: 2013-07-08
Spud Date: 2013-08-27
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2013-12-11
Well Total Depth: 14442.00 ft
Configuration: Horizontal
Latitude: 39.910000
Longitude: -81.310000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-07-08 Proposed Formations:POINT PLEASANT, Issued Date:7/8/2013, Expired Date:7/8/2015 12:00:00 PM, Drilling unit acres:698.234, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2013-08-30 CHANGE IN PROPOSED TOTAL DEPTH.
Correction to Well 2013-11-01 CORRECTION TO TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 634.335 ACRES. SPACING VARIANCE GRANTED.
Correction to Well 2013-12-06 CHANGE IN PROPOSED TOTAL DEPTH.
Reached Total Depth 2013-12-11
Correction to Well 2014-01-17 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 634.335 ACRES. QUAD CHANGED TO QUAKER CITY.
Completion Report Received 2014-08-06
Construction Permit Expires 2015-07-08
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-08-07 8720 14332 0
8720 14332 0
8720 14332 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 02/01/2014 02/13/2014 7732 8,206,720.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Plexaid 673 Chemplex Scale Inhibitor Water 7732-18-5 85 0.01335 0
Methyl Alcohol 67-56-1 25 0.00393 0
Sodium Salt of Phosphonodimethylated Diamine Proprietary 5 0.00079 0
Freshwater Antero Resources Water Water 7732-18-5 100 90.709 0
Ferriplex 66 Chemplex Iron Control Acetic Acid 64-19-7 50 0.00022 0
Citric Acid 77-92-9 30 0.00013 0
Water 7732-18-5 35 0.00016 0
Beta M-4.0 PfP Guar Gel Clay 1302-78-9 5 0.00425 0
Guar Gum 9000-30-0 50 0.04252 0
Surfactant 154518-36-2 1 0.00085 0
Petroleum Distillate 64742-47-8 55 0.04677 0
40/70 White US Silica Propppant Sand 14808-60-7 100 4.9144 0
Hydrochloric Acid 10-15% Reagent Acid Hydrchloric Acid 7647-01-0 15 0.03424 0
20/40 White US Silica Propppant Sand 14808-60-7 100 2.9237 0
100 Mesh US Silica Propppant Sand 14808-60-7 100 1.2677 0
Plexhib 256 Chemplex Corrosion Methyl Alcohol 67-56-1 70 0.00049 0
thiourea-formaldehyde copolymer 68527-49-1 30 0.00021 0
Propargyl Alcohol 107-19-7 8 0.00006000 0
Alcohol Ethoxylate Surfactants Proprietary 30 0.00021 0
n-olefins Proprietary 10 0.00007000 0
Plexcide 15G Chemplex Biocide Alkyl Dimethyl Benzyl Ammonium Chloride 68424-85-1 3 0.00076 0
Ethanol 64-17-5 3 0.00076 0
Water 7732-18-5 90 0.02285 0
Glutaraldehyde 111-30-8 14 0.00355 0
Didecyl Dimethyl Ammonium Chloride 7173-51-5 3 0.00076 0
Sodium Persulfate Chemplex Breaker Sodium Persulfate 7775-27-1 100 0.00123 0
Plexslick 953 Chemplex Friction Reducer Polyacrylamide-co-acrylic acid 9003-06-9 32 0.01967 0
Water 7732-18-5 35 0.02152 0
Hydrotreated Petroleum Distillate 64742-47-8 30 0.01844 0
Alcohol Ethoxylate Surfactants Proprietary 8 0.00492 0
Plexbreak 145 Chemplex Non-emulsifier Methyl Alcohol 67-56-1 15 0.00012 0
Ethylene Glycol Monobutyl Ether 111-76-2 15 0.00012 0
Cocamide Diethanolamine Salt 68603-42-9 10 0.00008000 0
Diethanolamine 111-42-2 5 0.00004000 0
Water 732-18-5 66 0.00052 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-01-31 H2O 15 4047 Bbl 235250 Go Frac LLC STAGE 1/32

STAGES 2-31 SEE IMAGES

2014-02-13 H2O 15 4280 Bbl 233715 Go Frac LLC STAGE 32/32

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 ANTERO RESOURCES CORPORATION 1386097 39456 272
2015 ANTERO RESOURCES CORPORATION 642917 2421 357
2016 ANTERO RESOURCES CORPORATION 392300 52 361
2017 ANTERO RESOURCES CORPORATION 275295 373 365
2018 ANTERO RESOURCES CORPORATION 162016 1107 326
2019 ANTERO RESOURCES CORPORATION 38518 157 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 ANTERO RESOURCES CORPORATION Brine 5924 272
2015 ANTERO RESOURCES CORPORATION Brine 11481 357
2016 ANTERO RESOURCES CORPORATION Brine 3877 361
2017 ANTERO RESOURCES CORPORATION Brine 2702 365
2018 ANTERO RESOURCES CORPORATION Brine 2786 326
2019 ANTERO RESOURCES CORPORATION Brine 525 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-135109885 2018-3-21 0:00: PW No Violations 0.50
-1398757265 2015-2-11 0:00: PL No Violations 0.50
-1678488683 2017-8-15 0:00: PW No Violations 0.50
-1702383645 2018-3-8 0:00:0 PW No Violations 0.20
-182231594 2017-1-20 0:00: PW No Violations 0.50
-491562026 2019-10-10 0:00 PW No Violations 0.50
-756722788 2017-5-9 0:00:0 PW No Violations 1.00
-838327501 2018-6-12 0:00: PW No Violations 0.20
0135109885 2018-03-21 Production Wells No Violations The purpose of my inspection was a status check. The pad is named Roe and there are a total of 7 wells. During my inspection construction equipment was on location to make repairs to the slips located on the cut slope and fill slopes of the pad. Antero is actively working with ODNR Division of Oil and Gas Engineering section to make necessary slip repairs. The slips do not oppose any threat to the wells and the wells are under continuous pressure monitoring.
0182231594 2017-01-20 Production Wells No Violations The purpose of my inspection is a status check on a producing well. The pad name is Roe and there are a total of 7 wells on this pad. During my inspection the well was equipped with a production tree style wellhead. The production equipment for this well consists of eight 400 barrel tanks within containment, and seven gas processing units. The vapor recovery system consists of two compressors and three Cimarron combustors. The production records are current, the identification is located at the wellhead, and there are no violations present.
0421650131 2015-06-16 Production Wells No Violations The well is equipped in a manner consistent with being capable of production. All drainage sumps on the location are closed. No violations were noted during the inspection.
0431266025 2014-04-30 Production Wells No Violations My inspection finds the diesel spill that took place during the completion phase is still causing some sheen on top of the water in the sump. The company is hauling all water off site to be disposed of or recycled. I have asked the company to remove all contaminated stone and soil. The tank battery is comprised of eight 400 bbl tanks set in a containment system.
0441013848 2013-12-10 Drill / Deepen / Reopen No Violations My inspection today finds Patterson rig 342 is drilling 8.5 hole at a depth of 13430.
0547267121 2014-05-16 Production Wells No Violations The well is equipped to be capable of production. The well is produced into eight 400 bbl tanks set in liquid tight containment. The GPS data was updated to enhance accuracy.
0592399634 2018-07-16 Production Wells No Violations The purpose of my inspection today was to witness Antero re-assembling the Grissom 1H plunger lift system. The well was equipped with a plunger lift system with valves in the open position. A pressure gauge was present on all casing strings. Accompanied by Antero Production Superintendent during my inspection.
0756722788 2017-05-09 Production Wells No Violations The purpose of my inspection was a status check on a producing well. The pad is named Roe and there are a total of 7 wells on this pad. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Gauges present read 270 pounds per square inch on the casing and 120 pounds per square inch on the tubing. Annular pressure monitoring was present. The production equipment for this well consists of eight 400 barrel tanks, seven gas processing units, two compressors, and two Cimarron combustors. The pipeline tie in is located on the west side of the pad. The production records are current, the identification is located at the wellhead, and there are no violations present.
0838327501 2018-06-12 Production Wells No Violations Prior inspection found contractors for Antero relocating and reassembling production equipment due to a slip in the cut slope of the North side if the pad. During my inspection today, the tank battery had been moved and reset within steel containment and the vapor recovery system had been connected. The well was equipped with a production tree style wellhead with a plunger lift system. Production valves were in the open position. A gauge was present on the production tubing reading 630 pounds per square inch, 650 pounds per square inch on the production casing, 0 pounds per square inch on the 9.625 inch diameter intermediate casing, and 0 pounds per square inch on the 13.375 inch diameter surface casing. The production equipment consisted of four 400 barrel tanks, seven gas production units, and two combustors. The identification was located at the wellhead.
1377711771 2013-08-27 Casing String Witnessed No Violations My inspection today finds that Express drilling ran 100 of 26 conductor. Allied circulated 336 sks of class A cement into place. The cement stayed in place.
1398757265 2015-02-11 Preliminary Restoration No Violations My inspection today finds the well site meets the preliminary restoration requirements. The tank battery is comprised of eight 500 barrel tanks set inside a liquid tight plastic liner.
1502816868 2017-08-15 Production Wells No Violations The purpose of my inspection was a status check on a production well. The pad is named Roe and there are a total of 7 wells. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Gauges present read 291 pounds per square inch on the casing, 120 pounds per square inch on the tubing, and 400 pounds per square inch on the annulus. The production equipment for the well consists of eight 400 barrel tanks, seven gas processing units, two compressors, and two Cimarron combustors. The pipeline tie in is located on the west side of the pad. The production records are current, and the identification is located at the wellhead.
1520275776 2018-03-05 Production Wells No Violations
1524578046 2018-04-20 Production Wells No Violations During my inspection contractors for Antero Resources were on location running lines to the combustors. The production equipment had been relocated due to a slip near the old orientation of the production equipment on the north side of the pad.
1678488683 2017-08-15 Production Wells No Violations The purpose of my inspection was a status check on a production well. The pad is named Roe and there are a total of 7 wells. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Gauges present read 260 pounds per square inch on the casing, 115 pounds per square inch on the tubing, and 450 pounds per square inch on the annulus. The production equipment for the well consists of eight 400 barrel tanks, seven gas processing units, two compressors, and two Cimarron combustors. The pipeline tie in is located on the west side of the pad. The production records are current, and the identification is located at the wellhead.
1702383645 2018-03-08 Production Wells No Violations The purpose of my inspection was a status check on a cut slope slip failure. The pad name is Roe and there are a total of 7 wells. The slip occurred in the cut slope of the pad in the Northwest corner where the eight 400 barrel tanks and two vapor recovery towers were located. That equipment had been removed in order for Antero to take remedial action on the slope failure. The remaining production equipment and wellheads were outside the area of concern. ODNR Division of Oil and Gas Engineering Section is currently working with Antero Resources with planning the material modification to repair the slope.
421650131 2015-6-16 0:00: PW No Violations 0.20
431266025 2014-4-30 0:00: PW No Violations 0.10
441013848 2013-12-10 0:00 DD No Violations 2.00
547267121 2014-5-16 0:00: PW No Violations 0.00
592399634 2018-7-16 0:00: PW No Violations 0.10
931259187 2020-4-28 0:00: PW No Violations 0.20

For data sources see[10]

References