If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24435 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.91,"lon":-81.31,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Beaver Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-000626 | |
Farm/Lease Name: DOLLISON UNIT | |
License Status: Producing | |
License Date: 2013-07-08 | |
Spud Date: 2013-08-27 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2013-12-11 | |
Well Total Depth: 14442.00 ft | |
Configuration: Horizontal | |
Latitude: 39.910000 | |
Longitude: -81.310000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-07-08 | Proposed Formations:POINT PLEASANT, Issued Date:7/8/2013, Expired Date:7/8/2015 12:00:00 PM, Drilling unit acres:698.234, Proposed Well Type:OG, Proposed Well Class:EDPW |
Correction to Well | 2013-08-30 | CHANGE IN PROPOSED TOTAL DEPTH. |
Correction to Well | 2013-11-01 | CORRECTION TO TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 634.335 ACRES. SPACING VARIANCE GRANTED. |
Correction to Well | 2013-12-06 | CHANGE IN PROPOSED TOTAL DEPTH. |
Reached Total Depth | 2013-12-11 | |
Correction to Well | 2014-01-17 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 634.335 ACRES. QUAD CHANGED TO QUAKER CITY. |
Completion Report Received | 2014-08-06 | |
Construction Permit Expires | 2015-07-08 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-08-07 | 8720 | 14332 | 0 |
8720 | 14332 | 0 | |
8720 | 14332 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 02/01/2014 | 02/13/2014 | 7732 | 8,206,720.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Plexaid 673 | Chemplex | Scale Inhibitor | Water | 7732-18-5 | 85 | 0.01335 | 0 |
Methyl Alcohol | 67-56-1 | 25 | 0.00393 | 0 | ||||
Sodium Salt of Phosphonodimethylated Diamine | Proprietary | 5 | 0.00079 | 0 | ||||
Freshwater | Antero Resources | Water | Water | 7732-18-5 | 100 | 90.709 | 0 | |
Ferriplex 66 | Chemplex | Iron Control | Acetic Acid | 64-19-7 | 50 | 0.00022 | 0 | |
Citric Acid | 77-92-9 | 30 | 0.00013 | 0 | ||||
Water | 7732-18-5 | 35 | 0.00016 | 0 | ||||
Beta M-4.0 | PfP | Guar Gel | Clay | 1302-78-9 | 5 | 0.00425 | 0 | |
Guar Gum | 9000-30-0 | 50 | 0.04252 | 0 | ||||
Surfactant | 154518-36-2 | 1 | 0.00085 | 0 | ||||
Petroleum Distillate | 64742-47-8 | 55 | 0.04677 | 0 | ||||
40/70 White | US Silica | Propppant | Sand | 14808-60-7 | 100 | 4.9144 | 0 | |
Hydrochloric Acid 10-15% | Reagent | Acid | Hydrchloric Acid | 7647-01-0 | 15 | 0.03424 | 0 | |
20/40 White | US Silica | Propppant | Sand | 14808-60-7 | 100 | 2.9237 | 0 | |
100 Mesh | US Silica | Propppant | Sand | 14808-60-7 | 100 | 1.2677 | 0 | |
Plexhib 256 | Chemplex | Corrosion | Methyl Alcohol | 67-56-1 | 70 | 0.00049 | 0 | |
thiourea-formaldehyde copolymer | 68527-49-1 | 30 | 0.00021 | 0 | ||||
Propargyl Alcohol | 107-19-7 | 8 | 0.00006000 | 0 | ||||
Alcohol Ethoxylate Surfactants | Proprietary | 30 | 0.00021 | 0 | ||||
n-olefins | Proprietary | 10 | 0.00007000 | 0 | ||||
Plexcide 15G | Chemplex | Biocide | Alkyl Dimethyl Benzyl Ammonium Chloride | 68424-85-1 | 3 | 0.00076 | 0 | |
Ethanol | 64-17-5 | 3 | 0.00076 | 0 | ||||
Water | 7732-18-5 | 90 | 0.02285 | 0 | ||||
Glutaraldehyde | 111-30-8 | 14 | 0.00355 | 0 | ||||
Didecyl Dimethyl Ammonium Chloride | 7173-51-5 | 3 | 0.00076 | 0 | ||||
Sodium Persulfate | Chemplex | Breaker | Sodium Persulfate | 7775-27-1 | 100 | 0.00123 | 0 | |
Plexslick 953 | Chemplex | Friction Reducer | Polyacrylamide-co-acrylic acid | 9003-06-9 | 32 | 0.01967 | 0 | |
Water | 7732-18-5 | 35 | 0.02152 | 0 | ||||
Hydrotreated Petroleum Distillate | 64742-47-8 | 30 | 0.01844 | 0 | ||||
Alcohol Ethoxylate Surfactants | Proprietary | 8 | 0.00492 | 0 | ||||
Plexbreak 145 | Chemplex | Non-emulsifier | Methyl Alcohol | 67-56-1 | 15 | 0.00012 | 0 | |
Ethylene Glycol Monobutyl Ether | 111-76-2 | 15 | 0.00012 | 0 | ||||
Cocamide Diethanolamine Salt | 68603-42-9 | 10 | 0.00008000 | 0 | ||||
Diethanolamine | 111-42-2 | 5 | 0.00004000 | 0 | ||||
Water | 732-18-5 | 66 | 0.00052 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-01-31 | H2O | 15 | 4047 Bbl | 235250 | Go Frac LLC | STAGE 1/32
STAGES 2-31 SEE IMAGES |
2014-02-13 | H2O | 15 | 4280 Bbl | 233715 | Go Frac LLC | STAGE 32/32 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | ANTERO RESOURCES CORPORATION | 1386097 | 39456 | 272 |
2015 | ANTERO RESOURCES CORPORATION | 642917 | 2421 | 357 |
2016 | ANTERO RESOURCES CORPORATION | 392300 | 52 | 361 |
2017 | ANTERO RESOURCES CORPORATION | 275295 | 373 | 365 |
2018 | ANTERO RESOURCES CORPORATION | 162016 | 1107 | 326 |
2019 | ANTERO RESOURCES CORPORATION | 38518 | 157 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | ANTERO RESOURCES CORPORATION | Brine | 5924 | 272 |
2015 | ANTERO RESOURCES CORPORATION | Brine | 11481 | 357 |
2016 | ANTERO RESOURCES CORPORATION | Brine | 3877 | 361 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 2702 | 365 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 2786 | 326 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 525 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-135109885 | 2018-3-21 0:00: | PW | No Violations | 0.50 |
-1398757265 | 2015-2-11 0:00: | PL | No Violations | 0.50 |
-1678488683 | 2017-8-15 0:00: | PW | No Violations | 0.50 |
-1702383645 | 2018-3-8 0:00:0 | PW | No Violations | 0.20 |
-182231594 | 2017-1-20 0:00: | PW | No Violations | 0.50 |
-491562026 | 2019-10-10 0:00 | PW | No Violations | 0.50 |
-756722788 | 2017-5-9 0:00:0 | PW | No Violations | 1.00 |
-838327501 | 2018-6-12 0:00: | PW | No Violations | 0.20 |
0135109885 | 2018-03-21 | Production Wells | No Violations | The purpose of my inspection was a status check. The pad is named Roe and there are a total of 7 wells. During my inspection construction equipment was on location to make repairs to the slips located on the cut slope and fill slopes of the pad. Antero is actively working with ODNR Division of Oil and Gas Engineering section to make necessary slip repairs. The slips do not oppose any threat to the wells and the wells are under continuous pressure monitoring. |
0182231594 | 2017-01-20 | Production Wells | No Violations | The purpose of my inspection is a status check on a producing well. The pad name is Roe and there are a total of 7 wells on this pad. During my inspection the well was equipped with a production tree style wellhead. The production equipment for this well consists of eight 400 barrel tanks within containment, and seven gas processing units. The vapor recovery system consists of two compressors and three Cimarron combustors. The production records are current, the identification is located at the wellhead, and there are no violations present. |
0421650131 | 2015-06-16 | Production Wells | No Violations | The well is equipped in a manner consistent with being capable of production. All drainage sumps on the location are closed. No violations were noted during the inspection. |
0431266025 | 2014-04-30 | Production Wells | No Violations | My inspection finds the diesel spill that took place during the completion phase is still causing some sheen on top of the water in the sump. The company is hauling all water off site to be disposed of or recycled. I have asked the company to remove all contaminated stone and soil. The tank battery is comprised of eight 400 bbl tanks set in a containment system. |
0441013848 | 2013-12-10 | Drill / Deepen / Reopen | No Violations | My inspection today finds Patterson rig 342 is drilling 8.5 hole at a depth of 13430. |
0547267121 | 2014-05-16 | Production Wells | No Violations | The well is equipped to be capable of production. The well is produced into eight 400 bbl tanks set in liquid tight containment. The GPS data was updated to enhance accuracy. |
0592399634 | 2018-07-16 | Production Wells | No Violations | The purpose of my inspection today was to witness Antero re-assembling the Grissom 1H plunger lift system. The well was equipped with a plunger lift system with valves in the open position. A pressure gauge was present on all casing strings. Accompanied by Antero Production Superintendent during my inspection. |
0756722788 | 2017-05-09 | Production Wells | No Violations | The purpose of my inspection was a status check on a producing well. The pad is named Roe and there are a total of 7 wells on this pad. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Gauges present read 270 pounds per square inch on the casing and 120 pounds per square inch on the tubing. Annular pressure monitoring was present. The production equipment for this well consists of eight 400 barrel tanks, seven gas processing units, two compressors, and two Cimarron combustors. The pipeline tie in is located on the west side of the pad. The production records are current, the identification is located at the wellhead, and there are no violations present. |
0838327501 | 2018-06-12 | Production Wells | No Violations | Prior inspection found contractors for Antero relocating and reassembling production equipment due to a slip in the cut slope of the North side if the pad. During my inspection today, the tank battery had been moved and reset within steel containment and the vapor recovery system had been connected. The well was equipped with a production tree style wellhead with a plunger lift system. Production valves were in the open position. A gauge was present on the production tubing reading 630 pounds per square inch, 650 pounds per square inch on the production casing, 0 pounds per square inch on the 9.625 inch diameter intermediate casing, and 0 pounds per square inch on the 13.375 inch diameter surface casing. The production equipment consisted of four 400 barrel tanks, seven gas production units, and two combustors. The identification was located at the wellhead. |
1377711771 | 2013-08-27 | Casing String Witnessed | No Violations | My inspection today finds that Express drilling ran 100 of 26 conductor. Allied circulated 336 sks of class A cement into place. The cement stayed in place. |
1398757265 | 2015-02-11 | Preliminary Restoration | No Violations | My inspection today finds the well site meets the preliminary restoration requirements. The tank battery is comprised of eight 500 barrel tanks set inside a liquid tight plastic liner. |
1502816868 | 2017-08-15 | Production Wells | No Violations | The purpose of my inspection was a status check on a production well. The pad is named Roe and there are a total of 7 wells. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Gauges present read 291 pounds per square inch on the casing, 120 pounds per square inch on the tubing, and 400 pounds per square inch on the annulus. The production equipment for the well consists of eight 400 barrel tanks, seven gas processing units, two compressors, and two Cimarron combustors. The pipeline tie in is located on the west side of the pad. The production records are current, and the identification is located at the wellhead. |
1520275776 | 2018-03-05 | Production Wells | No Violations | |
1524578046 | 2018-04-20 | Production Wells | No Violations | During my inspection contractors for Antero Resources were on location running lines to the combustors. The production equipment had been relocated due to a slip near the old orientation of the production equipment on the north side of the pad. |
1678488683 | 2017-08-15 | Production Wells | No Violations | The purpose of my inspection was a status check on a production well. The pad is named Roe and there are a total of 7 wells. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Gauges present read 260 pounds per square inch on the casing, 115 pounds per square inch on the tubing, and 450 pounds per square inch on the annulus. The production equipment for the well consists of eight 400 barrel tanks, seven gas processing units, two compressors, and two Cimarron combustors. The pipeline tie in is located on the west side of the pad. The production records are current, and the identification is located at the wellhead. |
1702383645 | 2018-03-08 | Production Wells | No Violations | The purpose of my inspection was a status check on a cut slope slip failure. The pad name is Roe and there are a total of 7 wells. The slip occurred in the cut slope of the pad in the Northwest corner where the eight 400 barrel tanks and two vapor recovery towers were located. That equipment had been removed in order for Antero to take remedial action on the slope failure. The remaining production equipment and wellheads were outside the area of concern. ODNR Division of Oil and Gas Engineering Section is currently working with Antero Resources with planning the material modification to repair the slope. |
421650131 | 2015-6-16 0:00: | PW | No Violations | 0.20 |
431266025 | 2014-4-30 0:00: | PW | No Violations | 0.10 |
441013848 | 2013-12-10 0:00 | DD | No Violations | 2.00 |
547267121 | 2014-5-16 0:00: | PW | No Violations | 0.00 |
592399634 | 2018-7-16 0:00: | PW | No Violations | 0.10 |
931259187 | 2020-4-28 0:00: | PW | No Violations | 0.20 |
For data sources see[10]