If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24513 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.9,"lon":-81.33,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Beaver Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-001040 | |
Farm/Lease Name: HALLETT UNIT | |
License Status: Producing | |
License Date: 2014-06-26 | |
Spud Date: 2014-07-13 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2014-11-12 | |
Well Total Depth: 14345.00 ft | |
Configuration: Horizontal | |
Latitude: 39.900000 | |
Longitude: -81.330000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-06-26 | Proposed Formations:POINT PLEASANT, Issued Date:6/26/2014, Expired Date:6/25/2016 12:00:00 PM, Drilling unit acres:455.899, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-11-12 | |
Correction to Well | 2015-03-06 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED. |
Completion Report Received | 2016-02-22 | |
Construction Permit Expires | 2016-06-25 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-03-15 | 8212 | 14168 | 0 |
8212 | 14168 | 0 | |
8212 | 14168 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 02/27/2015 | 03/09/2015 | 7941 | 8,813,340.0 | 412293 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | K-BAC 1020 | U.S. Well Services | Anti-Bacterial Agent | Deionized Water | 7732-18-5 | 28 | 0.0025 | 2047.97 |
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00438 | 3585.41 | ||||
HCL Acid (12.6%-18.0%) | U.S. Well Services, LLC | Bulk Acid | Water | 7732-18-5 | 87.5 | 0.19806 | 162207 | |
Hydrogen Chloride | 7647-01-0 | 18 | 0.04731 | 38746 | ||||
LGC-15 | U.S. Well Services | Gelling Agents | Suspending agent (solid) | 14808-60-7 | 3 | 0.00539 | 4417.68 | |
Guar Gum | 9000-30-0 | 50 | 0.03527 | 28884.8 | ||||
Petroleum Distillates | 64742-47-8 | 60 | 0.0334 | 27355.6 | ||||
Surfactant | 68439-51-0 | 3 | 0.00212 | 1733.09 | ||||
AI-301 | U.S. Well Services | Acid Corrosion Inhibitors | Diethylene Glycol | 111-46-6 | 30 | 0.00015 | 125.988 | |
Hydrogen Chloride | 7647-01-0 | 10 | 0.00005000 | 43.5348 | ||||
Coco amine | 61791-14-8 | 5 | 0.00002000 | 17.2638 | ||||
Polyethylene polyamine | 68603-67-8 | 10 | 0.00005000 | 37.7927 | ||||
Methenamine | 100-97-0 | 20 | 0.00012 | 99.8298 | ||||
Water | Antero Resources | Base Fluid | Water | 7732-18-5 | 100 | 89.749 | 73,503,200.0 | |
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 9.82608 | 8,047,420.0 | |
WFRA-405 | U.S. Well Services | Friction Reducer | Ethoxylated alcohol blend | Proprietary | 5 | 0.0029 | 2378.15 | |
Anionic Polyacrylamide | Proprietary | 40 | 0.02323 | 19025.2 | ||||
Petroleum Distillates | 64742-47-8 | 20 | 0.00935 | 7657.65 | ||||
Water | 7732-18-5 | 40 | 0.02323 | 19025.2 | ||||
Sodium Chloride | 7647-14-5 | 20 | 0.01162 | 9512.6 | ||||
AP One | U.S. Well Services | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.00154 | 1260 | |
SI-1100 | U.S. Well Services | Scale Inhibitor | bis (hexamethylene) tramine penta
(methylene phosphonic acid) - phosphate acid |
40623-75-4 | 10 | 0.00145 | 1183.53 | |
Ethylene Glycol | 107-21-1 | 40 | 0.00568 | 4651.79 | ||||
hexamethylenediamine tetra (methylene phosphonic acid) | 38820-59-6 | 10 | 0.00157 | 1286.44 | ||||
Acrylic polymer | 52255-49-9 | 5 | 0.00063 | 514.578 | ||||
2-Phosphonobutane 1,2,4 tricarboxylic salt | 37971-36-1 | 10 | 0.00162 | 1327.61 | ||||
Copolymer of Maleic and Acrylic acid | 26677-99-6 | 10 | 0.00148 | 1214.4 | ||||
Potassium salt of diethylene triamine
penta (methylene phosphonic acid) |
15827-60-8 | 10 | 0.0017 | 1389.36 | ||||
Di Water | 7732-18-5 | 80 | 0.01005 | 8233.25 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-02-27 | H2O | 15 | 6338 Bbl | 237175 | US Well Services Inc | STAGE 1/34
60 SHOTS STAGES 2-33 SEE IMAGES |
2015-03-09 | H2O | 15 | 6100 Bbl | 241350 | US Well Services Inc | STAGE 34/34
60 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ANTERO RESOURCES CORPORATION | 966870 | 15040 | 184 |
2016 | ANTERO RESOURCES CORPORATION | 958794 | 3045 | 358 |
2017 | ANTERO RESOURCES CORPORATION | 496664 | 924 | 364 |
2018 | ANTERO RESOURCES CORPORATION | 284375 | 1211 | 361 |
2019 | ANTERO RESOURCES CORPORATION | 63774 | 355 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | ANTERO RESOURCES CORPORATION | Brine | 10895 | 184 |
2016 | ANTERO RESOURCES CORPORATION | Brine | 6707 | 358 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 11152 | 364 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 2734 | 361 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 610 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1463422607 | 2014-10-20 0:00 | DD | No Violations | 1.50 |
-1687090550 | 2015-7-29 0:00: | PL | No Violations | |
-1855853465 | 2015-10-20 0:00 | PW | No Violations | 0.30 |
-1899710186 | 2015-3-4 0:00:0 | DD | No Violations | 1.00 |
-216847388 | 2017-10-17 0:00 | PW | No Violations | 1.00 |
-247629276 | 2014-10-29 0:00 | DD | No Violations | 1.00 |
-635522675 | 2014-10-21 0:00 | CS | No Violations | 6.00 |
-91687564 | 2018-11-27 0:00 | PW | No Violations | 0.80 |
0091687564 | 2018-11-27 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with 5.5-inch diameter production casing and 2.875-inch diameter tubing equipped with a plunger lift system. At the time of my inspection annular pressure monitoring was in place, and the 13.375-inch diameter casing had 0 pounds per square inch, the 9.625-inch diameter casing had 0 pounds per square inch. Production equipment included a Gas Processing Unit, as well as 12- 400-barrel steel production fluid tanks, and 2 combustors that were shared with the other producing wells on the pad. There was secondary containment around the production fluid tanks, and the Gas Processing Units. There was a midstream valve site on the northwest side of the pad. The well pad was contained within an earthen dike, there were multiple Emergency Shutoff Devices on location. Identification tags were present, and production was up to date. |
0216847388 | 2017-10-17 | Production Wells | No Violations | The purpose of my inspection was a status check on a production well. The pad name is JR Byler and it consists of 7 wells. The well was equipped with a production tree style wellhead. Production valves were in the open position. Gauges present on the annulus read 0 pounds per square inch. The gauge on the production casing read 340 pounds per square inch and the gauge on the production tubing read 160 pounds per square foot. The production equipment consisted of twelve 400 barrel tanks within steel line containment and seven gas production units. A vapor recovery system to capture tank vapors consisted of one compressor and two combustors. The pipeline tie in was located on the North side of the pad. Pipeline contractors were in the process of launching a pig during inspection. A dust suppressant had been recently applied to the lease road. The identification was located at the wellhead and the production records were current. |
0247629276 | 2014-10-29 | Drill / Deepen / Reopen | No Violations | My inspection today finds the drilling rig, Patterson 316, is preparing to trip back in the hole after replacing a motor. The well is currently drilled to a depth of 5118 at a diameter of 12.25. Once tripping back in the hole they will drill to an anticipated depth of 6800. |
0571595148 | 2014-07-14 | Casing String Witnessed | No Violations | I am onsite to witness the cementing operations of the conductor casing string. Express energy ran 100 of twenty-six inch weld casing. Express also cemented the casing in place with 330 sacks of class A cement. The mix water was tested at 82 ppm with a Quantab. I witnessed 15 barrels of cement return to surface. |
0577236162 | 2017-03-15 | Production Wells | No Violations | The pad name is JR Byler and it consists of 7 wells. The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. Gauges present read 340 pounds per square inch on the casing and 160 pounds per square inch on the tubing. Annular pressure monitoring was present. The production equipment consisted of seven gas production units, twelve 400 barrel tanks, three compressors, and two combustors. Identification was present and production records were current. |
0635522675 | 2014-10-21 | Casing String Witnessed | No Violations | I am site to witness the surface casing cementing operations. Patterson Drilling rig 316 ran 362 of 18.625 casing. Allied Oil and Gas Services cemented the casing in place with 738 sacks of class A cement. I witnessed over 75 barrels of cement circulate to surface. |
1463422607 | 2014-10-20 | Drill / Deepen / Reopen | No Violations | My inspection today finds the drilling contractor, Patterson Drilling rig 316, is drilling a 24 hole at a depth of 293. The company man anticipates cementing the surface casing later tonight. |
1530150547 | 2019-11-29 0:00 | PW | No Violations | 0.50 |
1687090550 | 2015-07-29 | Preliminary Restoration | No Violations | My inspection today finds the well pad meets the preliminary restoration requirements of 1509.072(A). The proper identification is posted at the wellhead. Solid Oak is providing initial turn on production services. The tank battery is comprised of twelve 400 barrel tanks set in a liquid tight steel dike with a spray on liner. |
1855853465 | 2015-10-20 | Production Wells | No Violations | My inspection today finds the well is equipped in a manner consistent with being capable of production. The tank battery is comprised of twelve 400 barrel tanks set in a liquid tight steel dike with a spray on liner. |
1899710186 | 2015-03-04 | Drill / Deepen / Reopen | No Violations | My inspection today finds U.S. Well Service is providing hydraulic stimulation services. Renegade is providing wireline services for the stimulation. All operations are currently stopped waiting for a leaking valve to be replaced on the wellhead stack. No fluids were escaping at the time of inspection as the valve was isolated. |
571595148 | 2014-7-14 0:00: | CS | No Violations | |
577236162 | 2017-3-15 0:00: | PW | No Violations | 0.50 |
For data sources see[10]