If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24579 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.91,"lon":-81.35,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Wayne Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-001237 | |
Farm/Lease Name: TURKEY UNIT | |
License Status: Producing | |
License Date: 2015-08-21 | |
Spud Date: 2015-10-14 | |
Spud Drilling Contractor: FRONTIER DRILLING | |
Final Drill Date: 2016-08-28 | |
Well Total Depth: 20993.00 ft | |
Configuration: Horizontal | |
Latitude: 39.910000 | |
Longitude: -81.350000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-03-12 | Proposed Formations:POINT PLEASANT, Issued Date:3/12/2015, Expired Date:3/11/2017 12:00:00 PM, Drilling unit acres:693.682, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2015-08-21 | Proposed Formations:POINT PLEASANT, Issued Date:8/21/2015, Expired Date:8/20/2017 12:00:00 PM, Drilling unit acres:655.515, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2016-05-27 | CORRECTION TO CASING PROGRAM |
Correction to Well | 2016-06-17 | CORRECTION TO CASING PROGRAM |
Reached Total Depth | 2016-08-28 | |
Correction to Well | 2016-11-11 | CHANGE IN TARGET/TAKEPOINT PER AS-DRILLED PLAT RCVD 10/13/2016-ALE |
Completion Report Received | 2017-05-15 | |
Construction Permit Expires | 2017-08-20 | |
Record Last Modified | 2019-06-11 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-05-17 | 7913 | 8061 | 60 |
2017-05-17 | 20706 | 20854 | 60 |
20706 | 20854 | 60 | |
7913 | 8061 | 60 | |
7913 | 8061 | 60 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 02/19/2017 | 03/22/2017 | 7988 | 24,923,500.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | LGC-15 | U.S. Well Services, LLC | Gelling Agents | Suspending agent (solid) | 14808-60-7 | 3 | 0.001163 | 2804.39 |
Petroleum Distillates | 64742-47-8 | 60 | 0.007201 | 17365.7 | ||||
Guar Gum | 9000-30-0 | 50 | 0.007604 | 18336.4 | ||||
Surfactant | 68439-51-0 | 3 | 0.000456 | 1100.18 | ||||
AP One | U.S. Well Services, LLC | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.000313 | 755 | |
WFRA-500 | U.S. Well Services, LLC | Friction Reducer | Hydrated light distillate (petroleum) | 64742-47-8 | 30 | 0.019211 | 46328.6 | |
2-Propenoic acid, polymer with 2 propenamide | 9003-06-9 | 30 | 0.023865 | 57551 | ||||
AI-303 | U.S. Well Services, LLC | Acid Corrosion Inhibitors | Acetophenone,thiourea,formaldehyde polymer | 68527-49-1 | 5 | 0.00000400 | 10.008 | |
Cinnamaldehyde | 104-55-2 | 20 | 0.00001700 | 41.3931 | ||||
Formic acid | 64-18-6 | 20 | 0.00001700 | 40.032 | ||||
Ethylene glycol | 107-21-1 | 40 | 0.00004700 | 114.492 | ||||
Polyether | 60828-78-6 | 10 | 0.00000800 | 20.016 | ||||
Butyl cellosolve | 111-76-2 | 20 | 0.00001500 | 36.0688 | ||||
SI-1100 | U.S. Well Services, LLC | Scale Inhibitor | Potassium salt of diethylene triamine
penta (methylene phosphonic acid) |
15827-60-8 | 3 | 0.000483 | 1165.64 | |
Copolymer of Maleic and Acrylic acid | 52255-49-9 | 10 | 0.001408 | 3396.2 | ||||
Phosphino carboxylic acid polymer | 71050-62-9 | 3 | 0.000465 | 1122.47 | ||||
Hexamethylene tramine penta (methylene phosphonic acid) | 34690-00-1 | 3 | 0.000465 | 1122.47 | ||||
Ethylene Glycol | 107-21-1 | 40 | 0.006827 | 16462.9 | ||||
HCL Acid (12.6%-17.5%) | U.S. Well Services, LLC | Bulk Acid | Water | 7732-18-5 | 87.4 | 0.126067 | 304018 | |
Hydrogen Chloride | 7647-01-0 | 17.5 | 0.02931 | 70683.6 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 13.5746 | 32,736,000.0 | |
K-BAC 1020 | U.S. Well Services, LLC | Anti-Bacterial Agent | Deionized Water | 7732-18-5 | 28 | 0.002248 | 5420 | |
2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.003935 | 9488.87 | ||||
Water | Antero Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 86.1942 | 207,862,000.0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-02-19 | H2O | 15 | 8302 Bbl | 442420 | US Well Services Inc | STAGE 1/74
STAGES 2-73 SEE IMAGES |
2017-03-22 | H2O | 15 | 7677 Bbl | 443440 | US Well Services Inc | STAGE 74/74
STAGES 2-73 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ANTERO RESOURCES CORPORATION | 1681613 | 47794 | 280 |
2018 | ANTERO RESOURCES CORPORATION | 1557590 | 13240 | 363 |
2019 | ANTERO RESOURCES CORPORATION | 244542 | 1499 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ANTERO RESOURCES CORPORATION | Brine | 27180 | 280 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 13910 | 363 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 3208 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1041153325 | 2017-7-11 0:00: | PW | No Violations | 0.50 |
-1275631520 | 2016-7-11 0:00: | PW | No Violations | 1.00 |
-133048585 | 2018-11-19 0:00 | PW | No Violations | 0.50 |
-1673804965 | 2019-11-29 0:00 | PW | No Violations | 0.50 |
-1748549818 | 2020-2-18 0:00: | PW | No Violations | 0.50 |
-2023301524 | 2016-7-13 0:00: | PW | No Violations | 6.00 |
-325833206 | 2017-4-14 0:00: | CT | No Violations | 3.00 |
0133048585 | 2018-11-19 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped 5.5-inch diameter production casing and 2.875-inch diameter tubing that appeared to be open flowing. At the time of my inspection annular pressure monitoring was in place, and the 13.375-inch diameter casing had 200 pounds per square inch, the 9.625-inch diameter casing had 0 pounds per square inch. Production equipment included a Gas Processing Unit, as well as 12- 400-barrel steel production fluid tanks, and 2 combustors that were shared with the other producing wells on the pad. There was secondary containment around the production fluid tanks, and the Gas Processing Units. The well pad was contained within an earthen dike, there were multiple Emergency Shutoff Devices on location. There was a midstream valve site near located on the northwest corner of the pad. Identification tags were present, and production was up to date. |
0184748650 | 2016-07-18 | Casing String Witnessed | No Violations | I am onsite to witness the second intermediate casing installation and cementing operations. Frontier Rig 32 drilled 7109 of 12.25 borehole. Then, the rig installed 7094.4 of HCP-110 casing weighing 47 pounds per foot. The casing was centralized on every third joint. Cement baskets were placed at 2414 and 2570. Halliburton cemented the casing inplace with 430 sacks of HalCem and 830 sacks of ExpandaCem. Twenty eight barrels of cement circulated to surface. |
0325833206 | 2017-04-14 | Completion Testing | No Violations | The purpose of my inspection was a status check on drilling out frac plugs from prior well stimulation operations. Fortis Service rig equipped with a snubbing unit, Power Swivel trailer, and Hydraulic Pipe Wrangler Trailer are on location. The rig is a using 2.875 inch diameter workstring with PH 6 connection weighing 8.7 pound per foot to drill out plugs and they well run a 2.875 inch diameter grade N 80 production tubing. Containment was placed under the rig and frac tanks. A pad walk around inspection found no violations present. |
0610333744 | 2016-10-27 | Completion Testing | No Violations | |
1041153325 | 2017-07-11 | Production Wells | No Violations | The pad is named Fuller and it consists of five production wells. The purpose of my inspection was a status check on a production well. During my inspection the well was equipped with a production tree style wellhead with production valves in the open position. The production equipment consisted of twelve 400 barrel tanks, five sand traps, five gas production units, three compressors, and three combustors. Myers water truck was on location loading produced fluids. |
1275631520 | 2016-07-11 | Production Wells | No Violations | My inspection today finds the 24 wellbore has been drilled to a total depth of 541. The company man anticipates cementing the surface casing around 3:00 pm. I will request assistance from Inspector Stolarik for coverage. |
1444910603 | 2015-10-15 | Casing String Witnessed | No Violations | The said well was spudded on 10/15/2015 by Express Energys top hole rig with a 100 x 32 conductor borehole being drilled and 100 of 26 conductor being set. Express Energys Cement Service cemented the casing using 330 sacks of class A cement with the cement displaced to 90 with 55.74 barrels of fresh water and good cement returns witnessed to surface. |
1468279440 | 2016-07-11 | Casing String Witnessed | No Violations | 07/11/2016 -On site inspection to witness the 18.625 surface casing cement job found Frontier Drilling rig # 32 on the hole with a 24 surface borehole drilled to 541 and 531 of J-55 87.5 lb/ft Buttress thread casing ran with a guide shoe - float collar and 4 casing centralizers ran for casing equipment. Halliburton Cement Service cemented the casing using 850 sacks of Class G cement with circulation established with 250 barrels of fresh water followed by 30 barrels of 6% gel spacer. Circulation was maintained throughout the cement job and cement returns were witnessed to surface with the casing pressure tested to 792 psi or 500 psi over cement displacement pressure. |
1619121771 | 2017-07-11 | Preliminary Restoration | No Violations | The purpose of my inspection is a status check on a preliminary restoration. During my inspection the area that has been disturbed by pad construction has been restored. All drilling supplies and equipment had been removed from location. The pad had a gravel surface with thick vegetation growth on the berm surrounding the pad. No erosion existed on the pads perimeter. The location has met 1509.072(A) requirements for preliminary restoration. |
184748650 | 2016-7-18 0:00: | CS | No Violations | 5.50 |
2023301524 | 2016-07-13 | Production Wells | No Violations | I am onsite to witness the cementing operations of the first intermediate casing string. Frontier Drilling rig 32 installed 1829.5 of J-55 54.5 pound casing with the assistance of Wyoming Casing power tongs. Halliburton cemented the casing in place by utilizing 272 barrels of HalCem at a weight of 15.6 pounds per gallon. I witnessed 30 barrels of cement circulate to surface. I witnessed the casing integrity test and verified the casing held pressure. |
610333744 | 2016-10-27 0:00 | CT | No Violations | 1.50 |
For data sources see[10]