34-121-24610

Well Details

Well ID: 34-121-24610
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Beaver Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-001402
Farm/Lease Name: SLASH UNIT
License Status: Producing
License Date: 2016-09-27
Spud Date: 2016-09-09
Spud Drilling Contractor: FRONTIER DRILLING
Final Drill Date: 2017-01-22
Well Total Depth: 19764.00 ft
Configuration: Horizontal
Latitude: 39.890000
Longitude: -81.270000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-08-26 Proposed Formations:POINT PLEASANT, Issued Date:8/26/2016, Expired Date:8/26/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2016-09-27 Proposed Formations:POINT PLEASANT, Issued Date:9/27/2016, Expired Date:9/27/2018 12:00:00 PM, Drilling unit acres:393.253, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2017-01-22
Correction to Well 2017-03-03 UPDATE TAKEPOINT/TARGET/ACREAGE PER AS-DRILLED PLAT RCVD 2-13-17-ALE
Completion Report Received 2017-07-21
Record Last Modified 2018-06-20
Construction Permit Expires 2018-09-27

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-08-03 8520 8688 36
2017-08-03 19475 19643 36
19475 19643 36
8520 8688 36
8520 8688 36

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/21/2017 05/10/2017 8380 22,147,300.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HCL Acid (12.6%-17.5%) U.S. Well Services, LLC Bulk Acid Water 7732-18-5 87.4 0.15807 336787
Hydrogen Chloride 7647-01-0 17.5 0.03675 78302.2
SI-1200s U.S. Well Services, LLC Scale Inhibitor Alkyl Phosphonic Acid Proprietary 5 0.00062 1320.22
Ammonia 7664-41-7 0.5 0.00009000 201.994
WFRA-500 U.S. Well Services, LLC Friction Reducer Hydrated light distillate (petroleum) 64742-47-8 30 0.0217 46235.9
2-Propenoic acid, polymer with 2 propenamide 9003-06-9 30 0.02696 57435.9
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 12.9925 27,681,600.0
AP One U.S. Well Services, LLC Gel Breakers Ammonium Persulfate 7727-54-0 100 0.00128 2724
Water Antero Resources Carrier/Base Fluid Water 7732-18-5 100 86.6936 184,709,000.0
AI-303 U.S. Well Services, LLC Acid Corrosion Inhibitors Cinnamaldehyde 104-55-2 20 0.00002000 39.8409
Butyl cellosolve 111-76-2 20 0.00002000 34.7163
Polyether 60828-78-6 10 0.00001000 19.2654
Ethylene glycol 107-21-1 40 0.00005000 110.198
Formic acid 64-18-6 20 0.00002000 38.5308
Acetophenone,thiourea,formaldehyde polymer 68527-49-1 5 0.00000500 9.6327
LGC-15 U.S. Well Services, LLC Gelling Agents Suspending agent (solid) 14808-60-7 3 0.00439 9347.32
Surfactant 68439-51-0 3 0.00172 3667.03
Petroleum Distillates 64742-47-8 60 0.02717 57881.5
Guar Gum 9000-30-0 50 0.02869 61117.1
Bioclear 2000 U.S. Well Services, LLC Anti-Bacterial Agent 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.0041 8732.54
Deionized Water 7732-18-5 28 0.00234 4987.99

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-05-10 H2O 8 8471 Bbl 503360 US Well Services Inc STAGE 56/56

STAGES 2-55 SEE IMAGES

2017-04-21 H2O 7 9125 Bbl 504350 US Well Services Inc STAGE 1/56

STAGES 2-55 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 ANTERO RESOURCES CORPORATION 1441915 6269 184
2018 ANTERO RESOURCES CORPORATION 2667956 2477 363
2019 ANTERO RESOURCES CORPORATION 353144 270 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 ANTERO RESOURCES CORPORATION Brine 18473 184
2018 ANTERO RESOURCES CORPORATION Brine 14822 363
2019 ANTERO RESOURCES CORPORATION Brine 2758 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1055182895 2016-11-8 0:00: CS No Violations 7.50
-11211996 2017-8-31 0:00: PW No Violations 0.20
-417142 2017-7-11 0:00: CT No Violations 0.50
-50135235 2017-6-3 0:00:0 CT No Violations 0.20
-667862483 2017-10-11 0:00 PW No Violations 0.50
-872334122 2020-10-19 0:00 PW No Violations 0.20
0000417142 2017-07-11 Completion Testing No Violations The purpose of my inspection was a status check on completion operations. During my inspection the well was shut in and equipped with a production tree style wellhead. Multiple contractors are on location installing production lines, fittings, and valves to the wellhead.
0011211996 2017-08-31 Production Wells No Violations The purpose of my inspection was a status check on a production well. The well was equipped with a production tree style wellhead. Production valves were in the open position. The production equipment consisted of twelve 400 barrel tanks within steel line containment, six sand traps, and six gas production units. The sand traps were flowing back into a 400 barrel gas buster tank. The pipeline tie in was located on the west side of the pad. The identification was located at the wellhead. Two Myers trucks were hauling produced fluids from the tank battery and one Antero Company man was on location.
0050135235 2017-06-03 Completion Testing No Violations All stimulation operations are complete on the said well.
0208552824 2016-09-10 Casing String Witnessed No Violations I arrived on location to witness Express Energy Services set conductor casing on the SLASH UNIT 1H. Prior to my arrival Inspector Conrad had approved them to set the conductor to 80 feet. We set the conductor using 257 sacks of class A cement with 2% NaCl and about a half a pound of flake. The weight of the cement was 15.6 pounds and had a 1.18 yield with a 32.19 mix. We used a total of 43.35 barrels of fluid for displacement. When we finished setting the casing we had a 10 foot shoe. After we had finished setting the conductor we had about 16 barrels of cement come back to surface and 54 barrels of water come to surface giving us a total of 70 barrels total to surface.
0287123896 2017-06-03 Completion Testing No Violations Status check inspection found the well stimulation process complete and the well shut in and awaiting the final completion process to be conducted by a service rig at a later date. All other completion phases have been stopped on the well pad.
0378749636 2018-01-04 Production Wells No Violations The purpose of my inspection was a status check on a production well. The well was equipped with a production tree style wellhead. Production valves were in the open position. The production equipment consisted of twelve 400 barrel tanks within steel line containment, six sand traps, and six gas production units. The pipeline tie in was located on the west side of the pad. The identification was located at the wellhead. Three Antero workers were maintenance production equipment and Myers Trucking were hauling produced fluids from the tank battery.
0392447596 2018-09-18 Production Wells No Violations The Wehr pad has a total of 7 wells, 6 production wells, and 1 well that has not been completed. The purpose of my inspection was a status check. The well was equipped with a production tree style wellhead. Production valves were in the open position. Annular pressure monitoring was present and evaluated. The production equipment consisted of twelve 400-barrel tanks, six sand traps, and six gas production units. The pipeline tie in was located on the west side of the pad. The identification was located at the wellhead. Myers Trucking was hauling produced fluids from the tank battery.
0667862483 2017-10-11 Production Wells No Violations The purpose of my inspection was a status check on a production well. The well was equipped with a production tree style wellhead. Production valves were in the open position. The production equipment consisted of twelve 400 barrel tanks within steel line containment, six sand traps, and six gas production units. The sand traps were flowing back into a 400 barrel gas buster tank. The pipeline tie in was located on the west side of the pad. The identification was located at the wellhead. Two Myers trucks were hauling produced fluids from the tank battery during inspection.
1030645293 2017-03-06 Preliminary Restoration No Violations Preliminary Restoration status check inspection accompanied by ODNR County Inspector Austin Gutridge. The area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. The lease road is stoned and in good repair. Signage is posted at the well pad entrance. Halliburton crews are on site preparing to begin the well stimulation 5.5 diameter production casing toe preparations.
1055182895 2016-11-08 Casing String Witnessed No Violations On the day of my inspection I witnessed that Frontier Drilling Rig #32 had drilled a 17.5 inch diameter hole to the depth of 1043 feet. Wyoming Casing Crew ran 1033 feet of 13.375 inch 54.5 pound per foot J-55 casing. C & J Energy Services was on site and gained circulation with 187 barrels of fresh water, pumped 25 barrels of gel, 10 barrels of fresh water and cemented casing with 1010 sacks of Class A cement weighing 15.6 pounds per gallon and a yield of 1.19 cubic foot per sack cement. Cement additives included 2% calcium chloride and .25 pound per sack of cello-<31 parts per million, pH 7 and 60 degrees.
1200393609 2019-12-24 0:00 PW No Violations 0.50
1479130222 2016-11-15 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Frontier Drilling Rig #32 had drilled a 12.25 inch diameter hole to the depth of 7693 feet. Wyoming Casing Crew ran 7678 feet of 9.625 inch 47 pound per foot HCP-<31 parts per million, pH 6 and 60 degrees.
1484748568 2017-01-17 Drill / Deepen / Reopen No Violations The purpose of my inspection today is to follow up on a two barrel release from the flare stack due to the well taking a kick at 1:46 PM on 1/16/2017. Antero Company man Steve Guffy revealed to me the affected area on the pad behind the flare stack, on the berm, and on the outside of the berm. The contaminated surface material was removed, seed, fertilizer, and straw was put into place. During my inspection Frontier Drilling Rig 32 was running the 5.5 inch diameter production casing. No violations present.
2023552662 2017-03-06 Preliminary Restoration No Violations Preliminary Restoration status check inspection accompanied by ODNR County Inspector Austin Gutridge. The area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. The lease road is stoned and in good repair. Signage is posted at the well pad entrance. U.S Well service crews are on site completing well stimulation operations on the 5 active wells on the pad.
208552824 2016-9-10 0:00: CS No Violations 4.00
287123896 2017-6-3 0:00:0 CT No Violations 0.50
378749636 2018-1-4 0:00:0 PW No Violations 0.10
392447596 2018-9-18 0:00: PW No Violations 0.20

For data sources see[10]

References