X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-121-24612

Well Details

Well ID: 34-121-24612
Loading map...
Country: United States
State: Ohio
County: Noble
Municipality: Beaver Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-001402
Farm/Lease Name: WEHR UNIT
License Status: Producing
License Date: 2016-10-03
Spud Date: 2016-11-08
Spud Drilling Contractor: FRONTIER DRILLING
Final Drill Date: 2016-12-29
Well Total Depth: 16769.00 ft
Configuration: Horizontal
Latitude: 39.890000
Longitude: -81.270000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-08-29 Proposed Formations:POINT PLEASANT, Issued Date:8/29/2016, Expired Date:8/29/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2016-10-03 Proposed Formations:POINT PLEASANT, Issued Date:10/3/2016, Expired Date:10/3/2018 12:00:00 PM, Drilling unit acres:475.503, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2016-12-29
Correction to Well 2017-03-03 UPDATE ACREAGE/TARGET/TAKEPOINT PER AS-DRILLED PLAT RCVD 2-13-17-ALE
Completion Report Received 2017-08-16
Record Last Modified 2018-04-06
Construction Permit Expires 2018-10-03

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-08-22 11542 11710 45
2017-08-22 16511 16678 60
16511 16678 60
11542 11710 45
11542 11710 45

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/01/2017 04/17/2017 8200 3,486,060.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Bioclear 2000 U.S. Well Services, LLC Anti-Bacterial Agent 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.008833 3724.41
Deionized Water 7732-18-5 28 0.005045 2127.37
Water Antero Resources Carrier/Base Fluid Water 7732-18-5 100 68.9489 29,073,700.0
WFRA-500 U.S. Well Services, LLC Friction Reducer 2-Propenoic acid, polymer with 2 propenamide 9003-06-9 30 0.037933 15995.3
Hydrated light distillate (petroleum) 64742-47-8 30 0.030536 12876.2
AP One U.S. Well Services, LLC Gel Breakers Ammonium Persulfate 7727-54-0 100 0.001719 725
LGC-15 U.S. Well Services, LLC Gelling Agents Surfactant 68439-51-0 3 0.002518 1061.9
Guar Gum 9000-30-0 50 0.041972 17698.4
Suspending agent (solid) 14808-60-7 3 0.006419 2706.81
Petroleum Distillates 64742-47-8 60 0.03975 16761.4
HCL Acid (12.6%-17.5%) U.S. Well Services, LLC Bulk Acid Hydrogen Chloride 7647-01-0 17.5 0.066248 27934.8
Water 7732-18-5 87.4 0.28494 120151
AI-303 U.S. Well Services, LLC Acid Corrosion Inhibitors Cinnamaldehyde 104-55-2 20 0.00003700 15.5224
Formic acid 64-18-6 20 0.00003600 15.012
Polyether 60828-78-6 10 0.00001800 7.506
Acetophenone,thiourea,formaldehyde polymer 68527-49-1 5 0.00000900 3.753
Butyl cellosolve 111-76-2 20 0.00003200 13.5258
Ethylene glycol 107-21-1 40 0.000102 42.9343
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 30.5234 12,870,800.0
SI-1200s U.S. Well Services, LLC Scale Inhibitor Ammonia 7664-41-7 0.5 0.000207 87.3436
Alkyl Phosphonic Acid Proprietary 5 0.001354 570.873

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-04-01 H2O 15 9036 Bbl 505800 US Well Services Inc STAGE 1/26

STAGES 2-25 SEE IMAGES

2017-04-17 H2O 15 5144 Bbl 228760 US Well Services Inc STAGE 26/26

STAGES 2-25 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 ANTERO RESOURCES CORPORATION 957764 13511 184
2018 ANTERO RESOURCES CORPORATION 1233324 3138 363
2019 ANTERO RESOURCES CORPORATION 173571 322 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 ANTERO RESOURCES CORPORATION Brine 22104 184
2018 ANTERO RESOURCES CORPORATION Brine 26090 363
2019 ANTERO RESOURCES CORPORATION Brine 2972 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1118166920 2017-6-3 0:00:0 CT No Violations 0.20
-1384748036 2017-7-11 0:00: CT No Violations 0.50
-1523865622 2017-10-11 0:00 PW No Violations 0.50
-1533139644 2017-6-3 0:00:0 CT No Violations 0.50
0585028725 2018-01-04 Production Wells No Violations The purpose of my inspection was a status check on a production well. The well was equipped with a production tree style wellhead. Production valves were in the open position. The production equipment consisted of twelve 400 barrel tanks within steel line containment, six sand traps, and six gas production units. The pipeline tie in was located on the west side of the pad. The identification was located at the wellhead. Three Antero workers were maintenance production equipment and Myers Trucking were hauling produced fluids from the tank battery.
0673772736 2017-04-11 Completion Testing No Violations The purpose of my inspection today is a status check on a hydraulic fracturing operations. During my inspection Antero Company men, Allied wireline, and US Well Service were on location. I witnessed US Well Service rigging up to preform hydraulic fracturing on the 15th stage. Pad inspection found no violations present.
0766818447 2017-08-31 Production Wells No Violations The purpose of my inspection was a status check on a production well. The well was equipped with a production tree style wellhead. Production valves were in the open position. The production equipment consisted of twelve 400 barrel tanks within steel line containment, six sand traps, and six gas production units. The sand traps were flowing back into a 400 barrel gas buster tank. The pipeline tie in was located on the west side of the pad. The identification was located at the wellhead. Two Myers trucks were hauling produced fluids from the tank battery and one Antero Company man was on location.
1093201957 2019-12-24 0:00 PW No Violations 0.50
1118166920 2017-06-03 Completion Testing No Violations Status check inspection found the well stimulation process was started on 03/28/2017 and stopped on 04/21/2017 with 26 of 42 stages complete.
1275319994 2016-09-09 Casing String Witnessed No Violations I arrived on location to witness Express Energy Services set conductor casing on the WEHR UNIT 2H. Prior to my arrival Inspector Conrad had approved them to set the conductor to 80 feet. We set the conductor using 257 sacks of class A cement with 2% NaCl and about a half a pound of flake. The weight of the cement was 15.6 pounds and had a 1.18 yield with a 32.19 mix. We used a total of 43.35 barrels of fluid for displacement. When we finished setting the casing we had a 10 foot shoe. After we had finished setting the conductor we had about 20 barrels of cement come back to surface and 45 barrels of water come to surface giving us a total of 65 barrels total to surface.
1307588682 2017-04-17 Completion Testing No Violations US Well Services, Allied Horizontal Wireline, and Antero Company men were all on location. During my inspection accompanied by ODNR Regional Manager Brent Bear we verified that the zipper hydraulic fracturing operations were temporarily put on hold due to slightly high magnitude readings detected at 12:00 PM 4/17/17. Operations were put on hold following hydraulic fracturing operations on stage 26. Top perforations for that stage were at 11542 feet, bottom perforations were at 11710 feet, and the frac plug was placed at 11726 feet. A plan will be worked out for continuing operations between ODNR Seismic section and Antero Resources Completions Manager.
1330980444 2017-03-06 Preliminary Restoration No Violations Preliminary Restoration status check inspection accompanied by ODNR County Inspector Austin Gutridge. The area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. The lease road is stoned and in good repair. Signage is posted at the well pad entrance. Halliburton crews are on site preparing to begin the well stimulation 5.5 diameter production casing toe preparations.
1384748036 2017-07-11 Completion Testing No Violations The purpose of my inspection was a status check on completion operations. During my inspection the well was shut in and equipped with a production tree style wellhead. Multiple contractors are on location installing production lines, fittings, and valves to the wellhead.
1476471606 2016-10-14 Casing String Witnessed No Violations 10/14/2016 Frontier Drilling rig 32 is now on location and has drilled a 17.5 surface borehole to the depth of 1,052 and ran 1,042 of 13.375 54.5 lb/ft J-55 casing. C&J Cement service is on location to cement the casing using 1009 sacks of class A cement with 25 barrels of 6% gel spacer ran ahead of the cement nag cement returns witnessed to surface.
1523865622 2017-10-11 Production Wells No Violations The purpose of my inspection was a status check on a production well. The well was equipped with a production tree style wellhead. Production valves were in the open position. The production equipment consisted of twelve 400 barrel tanks within steel line containment, six sand traps, and six gas production units. The sand traps were flowing back into a 400 barrel gas buster tank. The pipeline tie in was located on the west side of the pad. The identification was located at the wellhead. Two Myers trucks were hauling produced fluids from the tank battery during inspection.
1533139644 2017-06-03 Completion Testing No Violations On site status check inspection found 27 out of a total 42 stages have been stimulated on the well pad with all operations being stopped on 04/21/2017.
1943032872 2017-03-06 Preliminary Restoration No Violations Preliminary Restoration status check inspection accompanied by ODNR County Inspector Austin Gutridge. The area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. The lease road is stoned and in good repair. Signage is posted at the well pad entrance. Halliburton crews are on site preparing to begin the well stimulation 5.5 diameter production casing toe preparations.
2076612087 2018-09-18 Production Wells No Violations The Wehr pad has a total of 7 wells, 6 production wells, and 1 well that has not been completed. The purpose of my inspection was a status check. The well was equipped with a production tree style wellhead. Production valves were in the open position. Annular pressure monitoring was present and evaluated. The production equipment consisted of twelve 400-barrel tanks, six sand traps, and six gas production units. The pipeline tie in was located on the west side of the pad. The identification was located at the wellhead. Myers Trucking was hauling produced fluids from the tank battery.
585028725 2018-1-4 0:00:0 PW No Violations 0.50
673772736 2017-4-11 0:00: CT No Violations 2.00
766818447 2017-8-31 0:00: PW No Violations 0.20
846164197 2020-10-19 0:00 PW No Violations 0.20

For data sources see[10]

References