If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24612 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.89,"lon":-81.27,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Beaver Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-001402 | |
Farm/Lease Name: WEHR UNIT | |
License Status: Producing | |
License Date: 2016-10-03 | |
Spud Date: 2016-11-08 | |
Spud Drilling Contractor: FRONTIER DRILLING | |
Final Drill Date: 2016-12-29 | |
Well Total Depth: 16769.00 ft | |
Configuration: Horizontal | |
Latitude: 39.890000 | |
Longitude: -81.270000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2016-08-29 | Proposed Formations:POINT PLEASANT, Issued Date:8/29/2016, Expired Date:8/29/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2016-10-03 | Proposed Formations:POINT PLEASANT, Issued Date:10/3/2016, Expired Date:10/3/2018 12:00:00 PM, Drilling unit acres:475.503, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2016-12-29 | |
Correction to Well | 2017-03-03 | UPDATE ACREAGE/TARGET/TAKEPOINT PER AS-DRILLED PLAT RCVD 2-13-17-ALE |
Completion Report Received | 2017-08-16 | |
Record Last Modified | 2018-04-06 | |
Construction Permit Expires | 2018-10-03 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-08-22 | 11542 | 11710 | 45 |
2017-08-22 | 16511 | 16678 | 60 |
16511 | 16678 | 60 | |
11542 | 11710 | 45 | |
11542 | 11710 | 45 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 04/01/2017 | 04/17/2017 | 8200 | 3,486,060.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Bioclear 2000 | U.S. Well Services, LLC | Anti-Bacterial Agent | 2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.008833 | 3724.41 |
Deionized Water | 7732-18-5 | 28 | 0.005045 | 2127.37 | ||||
Water | Antero Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 68.9489 | 29,073,700.0 | |
WFRA-500 | U.S. Well Services, LLC | Friction Reducer | 2-Propenoic acid, polymer with 2 propenamide | 9003-06-9 | 30 | 0.037933 | 15995.3 | |
Hydrated light distillate (petroleum) | 64742-47-8 | 30 | 0.030536 | 12876.2 | ||||
AP One | U.S. Well Services, LLC | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.001719 | 725 | |
LGC-15 | U.S. Well Services, LLC | Gelling Agents | Surfactant | 68439-51-0 | 3 | 0.002518 | 1061.9 | |
Guar Gum | 9000-30-0 | 50 | 0.041972 | 17698.4 | ||||
Suspending agent (solid) | 14808-60-7 | 3 | 0.006419 | 2706.81 | ||||
Petroleum Distillates | 64742-47-8 | 60 | 0.03975 | 16761.4 | ||||
HCL Acid (12.6%-17.5%) | U.S. Well Services, LLC | Bulk Acid | Hydrogen Chloride | 7647-01-0 | 17.5 | 0.066248 | 27934.8 | |
Water | 7732-18-5 | 87.4 | 0.28494 | 120151 | ||||
AI-303 | U.S. Well Services, LLC | Acid Corrosion Inhibitors | Cinnamaldehyde | 104-55-2 | 20 | 0.00003700 | 15.5224 | |
Formic acid | 64-18-6 | 20 | 0.00003600 | 15.012 | ||||
Polyether | 60828-78-6 | 10 | 0.00001800 | 7.506 | ||||
Acetophenone,thiourea,formaldehyde polymer | 68527-49-1 | 5 | 0.00000900 | 3.753 | ||||
Butyl cellosolve | 111-76-2 | 20 | 0.00003200 | 13.5258 | ||||
Ethylene glycol | 107-21-1 | 40 | 0.000102 | 42.9343 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 30.5234 | 12,870,800.0 | |
SI-1200s | U.S. Well Services, LLC | Scale Inhibitor | Ammonia | 7664-41-7 | 0.5 | 0.000207 | 87.3436 | |
Alkyl Phosphonic Acid | Proprietary | 5 | 0.001354 | 570.873 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-04-01 | H2O | 15 | 9036 Bbl | 505800 | US Well Services Inc | STAGE 1/26
STAGES 2-25 SEE IMAGES |
2017-04-17 | H2O | 15 | 5144 Bbl | 228760 | US Well Services Inc | STAGE 26/26
STAGES 2-25 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ANTERO RESOURCES CORPORATION | 957764 | 13511 | 184 |
2018 | ANTERO RESOURCES CORPORATION | 1233324 | 3138 | 363 |
2019 | ANTERO RESOURCES CORPORATION | 173571 | 322 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ANTERO RESOURCES CORPORATION | Brine | 22104 | 184 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 26090 | 363 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 2972 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1118166920 | 2017-6-3 0:00:0 | CT | No Violations | 0.20 |
-1384748036 | 2017-7-11 0:00: | CT | No Violations | 0.50 |
-1523865622 | 2017-10-11 0:00 | PW | No Violations | 0.50 |
-1533139644 | 2017-6-3 0:00:0 | CT | No Violations | 0.50 |
0585028725 | 2018-01-04 | Production Wells | No Violations | The purpose of my inspection was a status check on a production well. The well was equipped with a production tree style wellhead. Production valves were in the open position. The production equipment consisted of twelve 400 barrel tanks within steel line containment, six sand traps, and six gas production units. The pipeline tie in was located on the west side of the pad. The identification was located at the wellhead. Three Antero workers were maintenance production equipment and Myers Trucking were hauling produced fluids from the tank battery. |
0673772736 | 2017-04-11 | Completion Testing | No Violations | The purpose of my inspection today is a status check on a hydraulic fracturing operations. During my inspection Antero Company men, Allied wireline, and US Well Service were on location. I witnessed US Well Service rigging up to preform hydraulic fracturing on the 15th stage. Pad inspection found no violations present. |
0766818447 | 2017-08-31 | Production Wells | No Violations | The purpose of my inspection was a status check on a production well. The well was equipped with a production tree style wellhead. Production valves were in the open position. The production equipment consisted of twelve 400 barrel tanks within steel line containment, six sand traps, and six gas production units. The sand traps were flowing back into a 400 barrel gas buster tank. The pipeline tie in was located on the west side of the pad. The identification was located at the wellhead. Two Myers trucks were hauling produced fluids from the tank battery and one Antero Company man was on location. |
1093201957 | 2019-12-24 0:00 | PW | No Violations | 0.50 |
1118166920 | 2017-06-03 | Completion Testing | No Violations | Status check inspection found the well stimulation process was started on 03/28/2017 and stopped on 04/21/2017 with 26 of 42 stages complete. |
1275319994 | 2016-09-09 | Casing String Witnessed | No Violations | I arrived on location to witness Express Energy Services set conductor casing on the WEHR UNIT 2H. Prior to my arrival Inspector Conrad had approved them to set the conductor to 80 feet. We set the conductor using 257 sacks of class A cement with 2% NaCl and about a half a pound of flake. The weight of the cement was 15.6 pounds and had a 1.18 yield with a 32.19 mix. We used a total of 43.35 barrels of fluid for displacement. When we finished setting the casing we had a 10 foot shoe. After we had finished setting the conductor we had about 20 barrels of cement come back to surface and 45 barrels of water come to surface giving us a total of 65 barrels total to surface. |
1307588682 | 2017-04-17 | Completion Testing | No Violations | US Well Services, Allied Horizontal Wireline, and Antero Company men were all on location. During my inspection accompanied by ODNR Regional Manager Brent Bear we verified that the zipper hydraulic fracturing operations were temporarily put on hold due to slightly high magnitude readings detected at 12:00 PM 4/17/17. Operations were put on hold following hydraulic fracturing operations on stage 26. Top perforations for that stage were at 11542 feet, bottom perforations were at 11710 feet, and the frac plug was placed at 11726 feet. A plan will be worked out for continuing operations between ODNR Seismic section and Antero Resources Completions Manager. |
1330980444 | 2017-03-06 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection accompanied by ODNR County Inspector Austin Gutridge. The area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. The lease road is stoned and in good repair. Signage is posted at the well pad entrance. Halliburton crews are on site preparing to begin the well stimulation 5.5 diameter production casing toe preparations. |
1384748036 | 2017-07-11 | Completion Testing | No Violations | The purpose of my inspection was a status check on completion operations. During my inspection the well was shut in and equipped with a production tree style wellhead. Multiple contractors are on location installing production lines, fittings, and valves to the wellhead. |
1476471606 | 2016-10-14 | Casing String Witnessed | No Violations | 10/14/2016 Frontier Drilling rig 32 is now on location and has drilled a 17.5 surface borehole to the depth of 1,052 and ran 1,042 of 13.375 54.5 lb/ft J-55 casing. C&J Cement service is on location to cement the casing using 1009 sacks of class A cement with 25 barrels of 6% gel spacer ran ahead of the cement nag cement returns witnessed to surface. |
1523865622 | 2017-10-11 | Production Wells | No Violations | The purpose of my inspection was a status check on a production well. The well was equipped with a production tree style wellhead. Production valves were in the open position. The production equipment consisted of twelve 400 barrel tanks within steel line containment, six sand traps, and six gas production units. The sand traps were flowing back into a 400 barrel gas buster tank. The pipeline tie in was located on the west side of the pad. The identification was located at the wellhead. Two Myers trucks were hauling produced fluids from the tank battery during inspection. |
1533139644 | 2017-06-03 | Completion Testing | No Violations | On site status check inspection found 27 out of a total 42 stages have been stimulated on the well pad with all operations being stopped on 04/21/2017. |
1943032872 | 2017-03-06 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection accompanied by ODNR County Inspector Austin Gutridge. The area affected by the well pad construction meets ORC 1509.072 with vegetation established and erosion control in place. The lease road is stoned and in good repair. Signage is posted at the well pad entrance. Halliburton crews are on site preparing to begin the well stimulation 5.5 diameter production casing toe preparations. |
2076612087 | 2018-09-18 | Production Wells | No Violations | The Wehr pad has a total of 7 wells, 6 production wells, and 1 well that has not been completed. The purpose of my inspection was a status check. The well was equipped with a production tree style wellhead. Production valves were in the open position. Annular pressure monitoring was present and evaluated. The production equipment consisted of twelve 400-barrel tanks, six sand traps, and six gas production units. The pipeline tie in was located on the west side of the pad. The identification was located at the wellhead. Myers Trucking was hauling produced fluids from the tank battery. |
585028725 | 2018-1-4 0:00:0 | PW | No Violations | 0.50 |
673772736 | 2017-4-11 0:00: | CT | No Violations | 2.00 |
766818447 | 2017-8-31 0:00: | PW | No Violations | 0.20 |
846164197 | 2020-10-19 0:00 | PW | No Violations | 0.20 |
For data sources see[10]