X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-007-20297

Well Details

Well ID: 34-007-20297
Loading map...
Country: United States
State: Ohio
County: Ashtabula
Municipality: Lenox Township
Operator Name: C & D OIL & GAS LLC
Well Pad ID:
Farm/Lease Name: BROCKWAY A
License Status: Producing
License Date: 2007-08-07
Spud Date: 1970-05-07
Spud Drilling Contractor:
Final Drill Date: 1970-05-18
Well Total Depth: 3568.00 ft
Configuration: Vertical
Latitude: 41.650000
Longitude: -80.800000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1970-05-07 399 CHANSE PETROLEUM CORP GeoDate 5/7/70
Oil and Gas 1970-05-07 Issued Date 5/7/70 Expired Date Acres 0080000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000
Original Spud 1970-05-07
Completed 1970-05-18
Reached Total Depth 1970-05-18
Change of Owner 2006-10-12 Operator changed from 399, CORNER OPERATING COMPANY, INC to 5952, BELVOIR ENERGY INC.
APP 2007-08-07 Proposed Formations:CLINTON, Issued Date:8/7/2007, Expired Date:8/6/2008 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class:
Construction Permit Expires 2008-08-06
Change of Owner 2018-02-12 Operator changed from 5952, BELVOIR ENERGY INC. to 10067, C & D OIL & GAS LLC
Record Last Modified 2018-02-12

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 2158 Bbl 70000

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1989 CORNER OPERATING COMPANY, INC 860.00 84.00 365
2007 BELVOIR ENERGY INC. 334.00 0.00 365
2010 BELVOIR ENERGY INC. 0.00 0.00 365
2012 BELVOIR ENERGY INC. 698.00 22.00 366
2013 BELVOIR ENERGY INC. 0.00 0.00 365
2014 BELVOIR ENERGY INC. 0.00 0.00 365
2016 BELVOIR ENERGY INC. 0.00 0.00 365
2017 BELVOIR ENERGY INC. 0.00 0.00 365
2018 C & D OIL & GAS LLC 0.00 0.00 0

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1989 CORNER OPERATING COMPANY, INC Brine 147 365
2007 BELVOIR ENERGY INC. Brine 71 365
2010 BELVOIR ENERGY INC. Brine 0 365
2012 BELVOIR ENERGY INC. Brine 35 366
2013 BELVOIR ENERGY INC. Brine 0 365
2014 BELVOIR ENERGY INC. Brine 0 365
2016 BELVOIR ENERGY INC. Brine 0 365
2017 BELVOIR ENERGY INC. Brine 0 365
2018 C & D OIL & GAS LLC Brine 40 0

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-35760348 2004-7-22 0:00: PW No Violations
0035760348 2004-07-22 Production Wells No Violations no violations .
0479567917 2003-05-22 Preliminary Restoration Violations Noted Case#03-008 [ Walter K. Hennsse Jr. ] Inspection showed 210 bbl production tank outside dike on east side which is not in use . There is a area in front of pole building located N-W of tank battery that is very rough . This area is also a pipe line right-of -way . Flow line right-of-way from tank battery to wellsite also lease road is very rough . There was a 2 steel pipe sticking from surface halfway between wellsite and tank battery approx. 6 in air in flow line right-of-way . REMEDIAL WORK REQUIRED : Final grade all rough areas in pipe line right-of-ways, remove old flow line exposed in lease road below grade at least 30 , also remove 210 bbl production tank stock piled outside dike area .
0804767205 2003-12-09 Production Wells No Violations Remedial work has been completed . Case# 03-008 has been resolved .
1241582022 2003-05-22 Preliminary Restoration Violations Noted Case#03-008 [ Walter K. Hennsse Jr. ] Inspection showed 210 bbl production tank outside dike on east side which is not in use . There is a area in front of pole building located N-W of tank battery that is very rough . This area is also a pipe line right-of -way . Flow line right-of-way from tank battery to wellsite also lease road is very rough . There was a 2 steel pipe sticking from surface halfway between wellsite and tank battery approx. 6 in air in flow line right-of-way . REMEDIAL WORK REQUIRED : Final grade all rough areas in pipe line right-of-ways, remove old flow line exposed in lease road below grade at least 30 , also remove 210 bbl production tank stock piled outside dike area .
479567917 2003-5-22 0:00: PL No Violations
804767205 2003-12-9 0:00: PW No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0479567917 US-OH-125229 2003-06-01 Failure to restore land surface within 9 mos. (CHANGE) (REPLACE)
1241582022 US-OH-106443 2003-06-01 Failure to restore land surface within 9 mos. (CHANGE) (REPLACE)

For data sources see[8]

References