If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-031-27217 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.31,"lon":-82.17,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Coshocton | |
Municipality: Perry Township | |
Operator Name: SAMPLES JAMES F | |
Well Pad ID: | |
Farm/Lease Name: RICHARDS | |
License Status: Producing | |
License Date: 2013-05-03 | |
Spud Date: 2013-08-23 | |
Spud Drilling Contractor: H & D DRILLING | |
Final Drill Date: 2013-09-08 | |
Well Total Depth: 3310.00 ft | |
Configuration: Vertical | |
Latitude: 40.310000 | |
Longitude: -82.170000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-05-03 | Proposed Formations:CLINTON, Issued Date:5/3/2013, Expired Date:5/3/2015 12:00:00 PM, Drilling unit acres:100, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2013-09-08 | |
Completion Report Received | 2014-03-06 | |
Construction Permit Expires | 2015-05-03 | |
Record Last Modified | 2019-06-11 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-10-10 | H2O | 15 | 1400 Bbl | 30000 | Producers Service Corporation |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | SAMPLES JAMES F | 0.00 | 1214.00 | 365 |
2015 | SAMPLES JAMES F | 0.00 | 491.00 | 365 |
2016 | SAMPLES JAMES F | 0.00 | 650.00 | 365 |
2017 | SAMPLES JAMES F | 0.00 | 552.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | SAMPLES JAMES F | Brine | 35 | 365 |
2015 | SAMPLES JAMES F | Brine | 18 | 365 |
2016 | SAMPLES JAMES F | Brine | 15 | 365 |
2017 | SAMPLES JAMES F | Brine | 15 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1257843022 | 2013-9-6 0:00:0 | DD | No Violations | |
-1387538604 | 2014-6-10 0:00: | PL | No Violations | |
-420899523 | 2013-9-24 0:00: | DD | No Violations | |
-543456776 | 2014-12-16 0:00 | PL | No Violations | |
-709801520 | 2013-8-26 0:00: | DD | No Violations | |
0400402476 | 2013-10-29 | Preliminary Restoration | No Violations | On the day of my inspection I found that the drill site was graded out and the pit was closed. The well was equipped with a pumping unit. There were still drilling materials and equipment left at the location. There was no vegetative cover. This site does not pass preliminary restoration at this time. |
0420899523 | 2013-09-24 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that H&D Drilling was still rigged up on location. The pit was still open and the fluid level was not in danger of breeching the liner. The well head was shut in and there were no leaks or spills. |
0543456776 | 2014-12-16 | Preliminary Restoration | No Violations | On the day of my inspection I found that the drilling materials had been removed from the well site. The preliminary restoration passes inspection. |
0709801520 | 2013-08-26 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that H&D Drilling was drilling at a depth of 200 with a 10 bit. They reported 38 of conductor being set. The permit was on display, the pit liner was in good shape and there were no leaks or spills. |
0794333809 | 2013-08-29 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that H&D Drilling was drilling at a depth of 500 with a 10 bit. The permit was on display, the pit liner was in good shape and there were no leaks or spills. |
1255859697 | 2014-07-17 | Preliminary Restoration | No Violations | On the day of my inspection I found that the well site had not been graded and seeded. This violation is not resolved |
1257843022 | 2013-09-06 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that H&D Drilling was drilling on air with a power swivel at a depth of 2600. The permit was on display, there were no sags or tears in the pit liner and there were no leaks or spills. |
1377875114 | 2013-08-30 | Casing String Witnessed | No Violations | On the day of my inspection H&D Drilling ran 569 of 7 casing in a 10 hole. Cemenco pumped fresh water, gel, cotton seed hulls and cell flake. They shut in for 15 minutes and then went into cement. Cemenco pumped 200 sacks of class A cement. No circulation was ever established, no cement was circulated to surface. Upon landing the plug, Cemenco pressured up to 700 psi and held for 5 minutes with no bleed off. Jim Samples is required to run a bond log before resuming drilling operations. |
1378834508 | 2013-09-10 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that H&D Drilling had pulled all of the 4.5 casing from the well. They found that the float shoe was plugged shut with rust flakes. The removed the float shoe and equipped the casing with a packer. |
1378920679 | 2013-09-10 | Casing String Witnessed | No Violations | On the day of my inspection I found that H&D Drilling drilled a 6.25 hole to 3320. They set used, tested and drifted 4.5 casing at 3210 on a formation packer, with 90 of tail pipe. The casing was perforated above the packer. Cemenco broke circulation and pumped 50 sacks of class A cement. Good circulation was maintained throughout the job. |
1387538604 | 2014-06-10 | Preliminary Restoration | Violations Noted | On the day of my inspection I found that no attempt had been made to establish erosion control at this well site. The pits were closed and the top soil had been graded out, but there was zero vegetative cover established. There were ruts and washed out areas on the location where the rain water has eroded the soil. The site must be seeded in order to establish a vegetative cover for erosion control. This restoration was due on 2/23/14. |
1415892202 | 2014-11-12 | Preliminary Restoration | No Violations | On the day of my inspection I found that the drill site was approximately 85% covered in well established tall grasses. The restoration does not pass because there was still 4.5 casing and 1 plastic line left around the location. I contacted Jim Samples, who claimed that he would get out to remove the pipe. |
1470630805 | 2013-09-09 | Casing String Witnessed | No Violations | On the day of my inspection I found that H&D Drilling had set 3320 of used, tested and drifted 4.5 casing. Cemenco attempted to load the casing prior to starting the cement job. While loading the casing the float shoe plugged off, rapidly increasing pressure. Several unsuccessful attempts to clear the obstruction by working the casing and surging the fluid were made. H&D Drilling decided to pull the casing. |
1975312544 | 2013-08-22 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that H&D Drilling was rigging up and digging the drill pit. The well was not spudded yet. I met with Jim Samples to discuss casing program and to get paperwork from pressure and drift testing on used casing. |
1977430963 | 2013-09-04 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I received a copy of the post surface job bond log that was ran on 8/31/13. The bond log showed that the cement top was at 58. H&D Drilling topped the annulus off with sack cement. They were drilling on air with a power swivel at a depth of 729. The permit was on display, there were no sags or tears in the pit liner and there were no leaks or spills. |
400402476 | 2013-10-29 0:00 | PL | No Violations | |
794333809 | 2013-8-29 0:00: | DD | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1387538604 | US-OH-111488 | 2014-12-19 | Failure to restore within six months |
For data sources see[8]