If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-23601 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.93,"lon":-81.84,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Milton Township | |
Operator Name: GASSER RONALD & HOPE | |
Well Pad ID: | |
Farm/Lease Name: GASSER RONALD | |
License Status: Producing | |
License Date: 1989-05-25 | |
Spud Date: 1983-11-04 | |
Spud Drilling Contractor: MARTIN DRILLING | |
Final Drill Date: 1983-11-09 | |
Well Total Depth: 3435.00 ft | |
Configuration: Vertical | |
Latitude: 40.930000 | |
Longitude: -81.840000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1983-08-16 | Issued Date 8/16/83 Expired Date 2/12/84 Acres 0020000 Tool Type RTF Proposed Formation CLINTON Proposed Depth 03435 Proposed Drill Depth 03435 |
Original Spud | 1983-11-04 | |
Completed | 1983-11-09 | |
Reached Total Depth | 1983-11-09 | |
CO | 1983-11-16 | 627 KENOIL GeoDate 8/16/83 |
Completion Report Received | 1983-11-21 | |
CO | 1989-05-25 | 2902 GASSER RONALD & HOPE GeoDate 5/25/89 |
Unknown | 1989-05-25 | Issued Date 5/25/89 Expired Date 5/25/90 Proposed Purpose OG Was Plug Supervised Who Superivsed Plug and Abandon Date |
Construction Permit Expires | 1990-05-25 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 0 | 0 | |
0 | 0 | ||
2006-09-11 | 3302 | 3352 | 18 |
3302 | 3352 | 18 | |
0 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
N2 | 0 | 175 Mscf | 0 | |||
H2O | 0 | 1740 Bbl | 70000 | FRAC;1740BBL H2O,70M# SD,175MCF N2 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | WENNER PETROLEUM CORP | 4925.00 | 502.00 | 0 |
1985 | WENNER PETROLEUM CORP | 1602.00 | 294.00 | 0 |
1986 | WENNER PETROLEUM CORP | 399.00 | 227.00 | 365 |
1988 | KENOIL LLC | 0.00 | 73.00 | 365 |
1989 | KENOIL LLC | 0.00 | 108.00 | 365 |
2006 | GASSER RONALD & HOPE | 0.00 | 0.00 | 0 |
2007 | GASSER RONALD & HOPE | 0.00 | 6.00 | 365 |
2008 | GASSER RONALD & HOPE | 0.00 | 6.00 | 365 |
2009 | GASSER RONALD & HOPE | 0.00 | 2.00 | 365 |
2010 | GASSER RONALD & HOPE | 0.00 | 2.00 | 365 |
2011 | GASSER RONALD & HOPE | 0.00 | 2.00 | 365 |
2012 | GASSER RONALD & HOPE | 0.00 | 2.00 | 366 |
2013 | GASSER RONALD & HOPE | 0.00 | 1.00 | 365 |
2014 | GASSER RONALD & HOPE | 0.00 | 33.00 | 365 |
2015 | GASSER RONALD & HOPE | 0.00 | 15.00 | 365 |
2016 | GASSER RONALD & HOPE | 0.00 | 32.00 | 365 |
2017 | GASSER RONALD & HOPE | 0.00 | 5.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | WENNER PETROLEUM CORP | Brine | 129 | 0 |
1985 | WENNER PETROLEUM CORP | Brine | 59 | 0 |
1986 | WENNER PETROLEUM CORP | Brine | 38 | 365 |
1988 | KENOIL LLC | Brine | 0 | 365 |
1989 | KENOIL LLC | Brine | 0 | 365 |
2006 | GASSER RONALD & HOPE | Brine | 0 | 0 |
2007 | GASSER RONALD & HOPE | Brine | 0 | 365 |
2008 | GASSER RONALD & HOPE | Brine | 0 | 365 |
2009 | GASSER RONALD & HOPE | Brine | 0 | 365 |
2010 | GASSER RONALD & HOPE | Brine | 0 | 365 |
2011 | GASSER RONALD & HOPE | Brine | 0 | 365 |
2012 | GASSER RONALD & HOPE | Brine | 0 | 366 |
2013 | GASSER RONALD & HOPE | Brine | 0 | 365 |
2014 | GASSER RONALD & HOPE | Brine | 3 | 365 |
2015 | GASSER RONALD & HOPE | Brine | 2 | 365 |
2016 | GASSER RONALD & HOPE | Brine | 0 | 365 |
2017 | GASSER RONALD & HOPE | Brine | 2 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1133016014 | 2013-8-29 0:00: | PW | No Violations | 0.50 |
-1884491706 | 2012-11-2 0:00: | PW | No Violations | |
-1964386092 | 2017-8-29 0:00: | PW | No Violations | |
1133016014 | 2013-08-29 | Production Wells | No Violations | This is a pumping unit well. No apparent prolems at time of inspection. |
1444459432 | 2016-03-14 | Production Wells | No Violations | Inspected production well on 03/14/2016. The tank battery consists of 3-100 bbl steel tanks, 2-vertical separators, and 1-underground brine vault located within an earthen dike. The well is equipped with a pump jack with an electric motor. No well identification is posted at either the tank battery or the wellhead. Attempted to notify Mr. Gasser at the phone number listed in RBDMS, but was unable to reach anyone or to leave a voicemail. Will send the operator a copy of the inspection report and request a phone call back regarding correcting this issue. No other problems were noted at the time of the inspection. |
1884491706 | 2012-11-02 | Production Wells | No Violations | This is a producing pump jack well. There were no problems noted at the time of the inspection. |
1964386092 | 2017-08-29 | Production Wells | No Violations | Inspected production well on 08/29/2017. The tank battery consists of 3-100 bbl steel tanks, 2-vertical separators, 3-drips, 1-meter box, and 1-underground brine vault, located within an earthen dike. The tank battery is used by multiple wells (2); partial well identification is posted at the tank battery for both wells. The well is equipped with a pump jack with an electric motor. Partial well identification is posted at the wellhead. Mr. Ron Gasser was notified of the need for proper well identification at both the tank battery and the wellhead, and he will address it promptly. No other problems were noted at the time of the inspection. |
2017253424 | 2014-12-04 | Production Wells | No Violations | This pumping unit well has no apparent problems. |
For data sources see[9]