X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-153-22853

Well Details

Well ID: 34-153-22853
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: EVERFLOW EASTERN PARTNERS LP
Well Pad ID:
Farm/Lease Name: STAN HYWET
License Status: Producing
License Date: 1996-11-20
Spud Date: 1997-02-21
Spud Drilling Contractor: CUBBY DRLG
Final Drill Date: 1997-03-03
Well Total Depth: 4612.00 ft
Configuration: Directional
Latitude: 41.120000
Longitude: -81.540000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1996-11-20 84 EVERFLOW EASTERN PTNS L P GeoDate 11/20/96
Oil and Gas 1996-11-20 Issued Date 11/20/96 Expired Date 11/20/97 Acres 0020700 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04612 Proposed Drill Depth 04612
Original Spud 1997-02-21 CORR FTG 6-7-97
Completed 1997-03-03 CORR FTG 6-7-97
Reached Total Depth 1997-03-03 CORR FTG 6-7-97
Completion Report Received 1997-03-21 CORR FTG 6-7-97
Construction Permit Expires 1997-11-20 CORR FTG 6-7-97
Record Last Modified 2017-02-15 CORR FTG 6-7-97

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 4339 4466 0
4339 4466 0
2006-09-11 4386 4466 75
4386 4466 75
4339 4466 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 118370 Gal 70000 FRAC W/118,370 GAL WATER & 70,000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1997 EVERFLOW EASTERN PARTNERS LP 5439.00 1060.00 152
1998 EVERFLOW EASTERN PARTNERS LP 15436.00 1808.00 365
1999 EVERFLOW EASTERN PARTNERS LP 17784.00 1165.00 365
2000 EVERFLOW EASTERN PARTNERS LP 12643.00 1707.00 365
2001 EVERFLOW EASTERN PARTNERS LP 13302.00 1060.00 365
2002 EVERFLOW EASTERN PARTNERS LP 8724.00 826.00 365
2003 EVERFLOW EASTERN PARTNERS LP 5029.00 591.00 365
2004 EVERFLOW EASTERN PARTNERS LP 4444.00 410.00 365
2005 EVERFLOW EASTERN PARTNERS LP 4552.00 350.00 365
2006 EVERFLOW EASTERN PARTNERS LP 3236.00 343.00 365
2007 EVERFLOW EASTERN PARTNERS LP 2728.00 312.00 365
2008 EVERFLOW EASTERN PARTNERS LP 1755.00 810.00 365
2009 EVERFLOW EASTERN PARTNERS LP 8140.00 889.00 365
2010 EVERFLOW EASTERN PARTNERS LP 9524.00 1006.00 365
2011 EVERFLOW EASTERN PARTNERS LP 10607.00 857.00 365
2012 EVERFLOW EASTERN PARTNERS LP 9169.00 723.00 366
2013 EVERFLOW EASTERN PARTNERS LP 8220.00 761.00 365
2014 EVERFLOW EASTERN PARTNERS LP 6850.00 680.00 365
2015 EVERFLOW EASTERN PARTNERS LP 8360.00 649.00 365
2016 EVERFLOW EASTERN PARTNERS LP 7727.00 539.00 365
2017 EVERFLOW EASTERN PARTNERS LP 4207.00 549.00 365
2018 EVERFLOW EASTERN PARTNERS LP 5506.00 467.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1997 EVERFLOW EASTERN PARTNERS LP Brine 2768 152
1998 EVERFLOW EASTERN PARTNERS LP Brine 2143 365
1999 EVERFLOW EASTERN PARTNERS LP Brine 1984 365
2000 EVERFLOW EASTERN PARTNERS LP Brine 2086 365
2001 EVERFLOW EASTERN PARTNERS LP Brine 1644 365
2002 EVERFLOW EASTERN PARTNERS LP Brine 1670 365
2003 EVERFLOW EASTERN PARTNERS LP Brine 1175 365
2004 EVERFLOW EASTERN PARTNERS LP Brine 1243 365
2005 EVERFLOW EASTERN PARTNERS LP Brine 922 365
2006 EVERFLOW EASTERN PARTNERS LP Brine 851 365
2007 EVERFLOW EASTERN PARTNERS LP Brine 424 365
2008 EVERFLOW EASTERN PARTNERS LP Brine 396 365
2009 EVERFLOW EASTERN PARTNERS LP Brine 1082 365
2010 EVERFLOW EASTERN PARTNERS LP Brine 1104 365
2011 EVERFLOW EASTERN PARTNERS LP Brine 1052 365
2012 EVERFLOW EASTERN PARTNERS LP Brine 929 366
2013 EVERFLOW EASTERN PARTNERS LP Brine 1177 365
2014 EVERFLOW EASTERN PARTNERS LP Brine 1185 365
2015 EVERFLOW EASTERN PARTNERS LP Brine 935 365
2016 EVERFLOW EASTERN PARTNERS LP Brine 1187 365
2017 EVERFLOW EASTERN PARTNERS LP Brine 912 365
2018 EVERFLOW EASTERN PARTNERS LP Brine 2028 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
1722615392 2003-03-18 Production Wells No Violations Status check inspection - no violations at this time.
1901418728 2018-01-05 UrbanProduction Wells No Violations The well and tank battery was accessed on a graveled road. The wellhead was configured to operate as a electric pyumping well. Visible equipment included 8.625 surface casing, 4.5 production casing and 2.375 tubing with rods. A two (2) inch riser allowed the 8.625 X 4.5 annular space to be monitored. The wellhead was fenced and locked. An I.D. sign was posted and legible. The tank battery was shared with the Stan Hywet #1, # 2-D, # 4-D and # 5-D wells. The combined tank battery consisted of four (4) 210 barrel stock tanks, one (1) 100 barrel brine tank, one (1) 50 barrel brine, five (5) 2408 horizontal separators and gas meters. The tank battery was surrounded by a chain link and an earthen dike. The load lines were locked and plugged. The I.D. signage was posted and legible. No violations identified during this inspection.

For data sources see[9]

References