If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23026 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.15,"lon":-81.51,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: SOUND ENERGY CO INC | |
Well Pad ID: | |
Farm/Lease Name: BATH CREEK | |
License Status: Producing | |
License Date: 2007-11-16 | |
Spud Date: 2007-12-21 | |
Spud Drilling Contractor: CAPSTAR DRILLING | |
Final Drill Date: 2008-01-03 | |
Well Total Depth: 3888.00 ft | |
Configuration: Vertical | |
Latitude: 41.150000 | |
Longitude: -81.510000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2007-11-16 | Proposed Formations:CLINTON, Issued Date:11/16/2007, Expired Date:11/15/2008 6:00:00 AM, Drilling unit acres:44.85, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-01-03 | |
Completion Report Received | 2008-02-19 | |
Construction Permit Expires | 2008-11-15 | |
Change of Owner | 2015-07-06 | Operator changed from 7626, M & M ROYALTY LTD to 4327, SOUND ENERGY CO INC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-05-27 | 3694 | 3770 | 49 |
3694 | 3770 | 49 | |
3694 | 3770 | 49 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1500 Bbl | 60000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | M & M ROYALTY LTD | 1853.00 | 1007.00 | 212 |
2009 | M & M ROYALTY LTD | 2614.00 | 730.00 | 365 |
2010 | M & M ROYALTY LTD | 1907.00 | 490.00 | 365 |
2011 | M & M ROYALTY LTD | 1721.00 | 463.00 | 365 |
2012 | M & M ROYALTY LTD | 1100.00 | 0.00 | 366 |
2013 | M & M ROYALTY LTD | 793.00 | 0.00 | 365 |
2014 | M & M ROYALTY LTD | 437.00 | 112.00 | 365 |
2015 | SOUND ENERGY CO INC | 0.00 | 0.00 | 0 |
2016 | SOUND ENERGY CO INC | 999.00 | 552.00 | 365 |
2017 | SOUND ENERGY CO INC | 707.00 | 216.00 | 365 |
2018 | SOUND ENERGY CO INC | 628.00 | 114.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | M & M ROYALTY LTD | Brine | 378 | 212 |
2009 | M & M ROYALTY LTD | Brine | 411 | 365 |
2010 | M & M ROYALTY LTD | Brine | 226 | 365 |
2011 | M & M ROYALTY LTD | Brine | 197 | 365 |
2012 | M & M ROYALTY LTD | Brine | 41 | 366 |
2013 | M & M ROYALTY LTD | Brine | 0 | 365 |
2014 | M & M ROYALTY LTD | Brine | 0 | 365 |
2015 | SOUND ENERGY CO INC | Brine | 0 | 0 |
2016 | SOUND ENERGY CO INC | Brine | 248 | 365 |
2017 | SOUND ENERGY CO INC | Brine | 158 | 365 |
2018 | SOUND ENERGY CO INC | Brine | 149 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1435038273 | 2008-5-7 0:00:0 | DD | No Violations | |
-1765023430 | 2010-2-5 0:00:0 | DD | No Violations | |
-1959361201 | 2008-9-18 0:00: | PL | No Violations | |
1193687101 | 2007-12-17 | Drill / Deepen / Reopen | No Violations | Independence Excavating has started building the lease road and the drilling location. The rig should be arriving on the 21st. |
1201815388 | 2008-01-24 | Drill / Deepen / Reopen | No Violations | Turbo Excavating and Chem Tech are on site to start solidifying the drilling pits. |
1312081283 | 2008-08-11 | Production Wells | No Violations | I received photos from Dave Ritter (Summit Soil & Water) showing sediment running off of the driveway leading to this location. There was no evidence of sedimentation in the road ditch. I called and left a message for Dave that I will ask the company to seed the exposed banks of the road cut. Preliminary restoration is not due until the end of September. |
1435038273 | 2008-05-07 | Drill / Deepen / Reopen | No Violations | Turbo Excavating is on site to lay the flowline. The tank battery location has been moved several hundred feet east of where it was proposed with the application. The company will need to submit a revised aerial photograph and map to reflect the new location. |
1483597966 | 2008-01-30 | Drill / Deepen / Reopen | No Violations | The pits have been solidified and closed and the site has been rough graded. The lease road and location are in good condition. The complaint from Mr. Finan has been resolved with the removal of the trackhoe and bulldozer from the lease road. |
1765023430 | 2010-02-05 | Drill / Deepen / Reopen | No Violations | checked site for tour on Senate Bill 165. |
1959361201 | 2008-09-18 | Preliminary Restoration | No Violations | Preliminary restoration is due by the end of the month. Grading and seeding still need to be finished around the entrance and the lease road to the tank battery. I called Mike Weinsz and informed him of what needed to be done. |
For data sources see[9]