X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-153-23055

Well Details

Well ID: 34-153-23055
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: BECK ENERGY CORPORATION
Well Pad ID:
Farm/Lease Name: TWIN FALLS
License Status: Producing
License Date: 2008-06-26
Spud Date: 2008-10-10
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2008-10-13
Well Total Depth: 4150.00 ft
Configuration: Vertical
Latitude: 41.140000
Longitude: -81.430000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2008-06-26 Proposed Formations:CLINTON/MEDINA, Issued Date:6/26/2008, Expired Date:6/26/2009 6:00:00 AM, Drilling unit acres:40.135, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2008-10-13
Completion Report Received 2008-12-26
Construction Permit Expires 2009-06-26
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2009-04-22 3940 3988 61
3940 3988 61
3940 3988 61

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 118250 Gal 50000 NO FRAC TREATMENT OR RESERVOIR PRESSURES WERE REPORTED

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 BECK ENERGY CORPORATION 136.00 0.00 0
2009 BECK ENERGY CORPORATION 27571.00 95.00 365
2010 BECK ENERGY CORPORATION 23728.00 100.00 365
2011 BECK ENERGY CORPORATION 24769.00 97.00 365
2012 BECK ENERGY CORPORATION 24910.00 100.00 366
2013 BECK ENERGY CORPORATION 26615.00 119.00 365
2014 BECK ENERGY CORPORATION 28309.00 185.00 365
2015 BECK ENERGY CORPORATION 46124.00 207.00 365
2016 BECK ENERGY CORPORATION 38079.00 228.00 365
2017 BECK ENERGY CORPORATION 36469.00 127.00 365
2018 BECK ENERGY CORPORATION 34485.00 181.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 BECK ENERGY CORPORATION Brine 0
2009 BECK ENERGY CORPORATION Brine 177 365
2010 BECK ENERGY CORPORATION Brine 65 365
2011 BECK ENERGY CORPORATION Brine 132 365
2012 BECK ENERGY CORPORATION Brine 46 366
2013 BECK ENERGY CORPORATION Brine 165 365
2014 BECK ENERGY CORPORATION Brine 250 365
2015 BECK ENERGY CORPORATION Brine 316 365
2016 BECK ENERGY CORPORATION Brine 289 365
2017 BECK ENERGY CORPORATION Brine 175 365
2018 BECK ENERGY CORPORATION Brine 145 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1076932104 2010-2-5 0:00:0 PW No Violations
-1200049859 2008-9-17 0:00: DD No Violations
-270812657 2014-9-12 0:00: UP No Violations
-602423756 2008-12-11 0:00 PW No Violations
-605868130 2009-1-26 0:00: PW No Violations
-696255353 2008-12-5 0:00: PW No Violations
0061275857 2008-10-10 Drill / Deepen / Reopen No Violations surface job
0193539748 2014-09-15 UrbanProduction Wells No Violations I was on this location to observe the remediation progress from an oil release on 9/4/2014. The tank battery was completely removed and placed upon a pit liner and the gravel , contaminated soil had been removed. The excavated area was 80(L) X 36(W) X 2(D). I was informed that a Cease Work Order was issued by the Mayor of Monroe Falls to Beck Energy for not having the proper excavation permit. Citation was issued to Junior Barehuff by Monroe Falls Police. Contaminated material has been removed and replaced. Rebuilding of the production equipment is delayed due to the stop work order.
0225398073 2014-09-10 UrbanProduction Wells No Violations I was on location to follow - up of the oil release which occurred during the period 9/4/2014 to 9/8/2014. I met with Jr. Barerhuff ( Beck Energy ) to discuss remediation plans. Lilly Landscaping Inc. was on location to begin excavation and removal of the contaminated material. The ground where the Peat-Sorb was placed, was removed in an area approximately 100 ( L ) X 20 ( W ) X 1.5 ( D ) . The depth was determined to be sufficent once the Hiram Glacial Clay Till ( Glenville - Fitchville soil series ) was encountered and free of contamination. Contaminated soil was hauled to Mr. Becks farm to be land farmed and remediated. New soil was brought in to replace the removed material. A lateral ditch was dug perpendicular to this excavation to prevent further migration out of the confines of the tank battery. Since the earthen dike appeared to be of sufficent size to contain said breach and investigation was started to determine the source of oil outside the diked area. A 3dike drain was found in the dike , but it was plugged with a flat plug on the outside of the dike. It appears that the oil followed the path of the 3 pipe and breached the dike. It was determined that the tank battery would have to be disassembled and moved while the complete tank battery base material would be removed. All remediation operations were shut down overnight.
0270812657 2014-09-12 UrbanProduction Wells Violations Noted I was on location to observe the clean-up of the oil release which occurred on 9/4/2014. After an overnight rain I observed that the oil plume had migrated into the gravel driveway servicing the tank battery. It was determined that complete removal and replacement of the contaminated material was warranted. The contractors ( Lilly Landscaping ) excavated an area 120 (L) X 15 (W) X 1.5 (D), which was previously graveled and used as access to the tank battery. All oil contamination appeared to be within the confines of the roadway. Work continued on the breakdown of the production equipment in the tank battery. Northeast Oilfield Services was on location to remove any pooled oil found in any retention ditches and sumps. The amount of oil migration, in the ground, appears to be diminishing in volume. I requested from Ray Beck the opening and closing tank gauges for the stock tanks. This was done to possibly determine the amount of the release. Correction measures shall start immediately ( 9/12/2014 ) including, dismantling the tank battery, excavation of all the contaminated soil and replacement of soil and gravel. Tank battery shall be placed on a pit liner, during excavation, as to prevent cross-contamination. Once all excavations indicates no further contamination Operator shall reconstruct the tank battery.
0275086507 2008-10-08 Drill / Deepen / Reopen No Violations site made posted by city
0597199888 2008-10-09 Drill / Deepen / Reopen No Violations rig moving on putting more silt fence along eastern perimater
0602423756 2008-12-11 Production Wells No Violations The well is in production with the required fencing and ID. Preliminary restoration will be due in the spring.
0605868130 2009-01-26 Production Wells No Violations I received an anonymous complaint about the security and the identification at this facility. This inspection found that there no lock on the gate to the wellhead. The tank battery gate was locked and secured. The well identification is posted on the stock tank and requires some effort to locate and read. I called David Beck and told him to tell his pumper that locking the gates at all times. I also asked him to post a sign on the outside of the fence as he has done on other locations.
0696255353 2008-12-05 Production Wells No Violations The well has just recently been turned on. The required fence is up but the required ID has not been posted. I called David Beck and told him to post the ID or shut the well in today. He said that the ID would be posted.
1076932104 2010-02-05 Production Wells No Violations No voilation checked site for tour on Senate Bill 165.
1200049859 2008-09-17 Drill / Deepen / Reopen No Violations No activity to date toward preparing the site for drilling. I talked to Midwest Land Clearing personnel at another site who met with David Beck recently to look at the Twin Falls site.
1235396428 2009-02-18 Production Wells No Violations The gates on the tank battery and the wellhead were secured with locks. The ID is posted on one of the stock tanks.
1295108358 2014-09-11 UrbanProduction Wells No Violations I witnessed work continuing to clean - up the oil release at the Twin Falls Church # 1 on 9/11/2014. Work entailed disassembly of the production equipment and removal and replacement of contaminated material. Work delayed for rain. Shut down work overnight.
1382765344 2009-12-03 Preliminary Restoration No Violations Preliminary restoration is approved.
1411726616 2014-09-09 UrbanProduction Wells Violations Noted I received a phone call ( 1726 hrs. ) from Jr. Barerhuff ( 330.958.1305, Beck Energy representative ) concerning an oil release at the Twin Falls Church # 1 ( Stow Twp., Summit Cty., 34-153-2-3055 ). Upon my arrival I noticed a triangular scattering of Peat-Sorb starting at the tank battery and traveling south for approximately 70. A petroleum odor was evident in the air. The tank battery was comprised of two 100 bbl Storage tanks, 30 bbl poly Brine storage tank, a 2408 horizontal separator and an orifice and a rotary gas measurement meters. An EOG pass key was used to gain access. Inside the tank battery the additional Peat-sorb was spread around the bases of the 100 bbl tanks. Upon examination of the orifice meter chart I saw where the well had a malfunction on 9/4/2014 and was in the on mode until shut-in by the well tender on 9/8/2014. It is apparent that with the well in the on mode the storage tanks were filled to their capacity and overflowed out the inspection hatch. Both Storage tanks had been wiped down of the oil on the outside. The base material for the tank battery is .25 to .50 sized pea gravel. I dug a hole into the gravel and found free oil 3 into the gravel bed. With out any Beck Energy representatives on location it was impossible to determine how much oil was released. I called Jr. Barerhuff to insure the well was shut-in and stable. I informed him I would meet him on the location @ 0730 hrs the next day. In order to satisfy this Compliance Notice, Beck Energy shall start remediation on 9/10/2014 and continue until all contaiminated soil and material is removed and replaced. The tank battery shall be dismantled and placed on a pit liner until approval to reconstruct is granted by the DOGMR Inspector.
1411742363 2014-09-12 UrbanProduction Wells No Violations I was on site to oversee the continued clean-up of the contaminated soil from the oil spill which occurred on September 4, 2014. On site was Ray Beck - Beck Energy and well owner, along with the contractor Lily Landscaping who is in charge of the soil removal. Ongoing removal of the contaminated soil continued for that day.
1412623319 2014-10-06 UrbanProduction Wells No Violations I inspected the Twin Falls # 1 well, tank battery location and lease road on 10/6/2014. I found that all the previously contaminated soil and gravel had been replaced with new suitable material. I did not observe any oil and / or residue remaining on the site previously contaminated. The tank battery equipment is located on pit liners and awaiting reconstruction. All previously prescribed corrective measures detailed in Compliance Notice # 1411726616 have been met.
1497433145 2017-09-19 UrbanProduction Wells No Violations The Twins Falls # 1 was operated as a plunger lift well. The wellhead was fenced, screened, landscaped and locked. The signage was compliant with the Urbanized requirements. The well was flowing during my inspection. I did not identify any leaks or contamination during the on cycle. The tank battery was serviced by a gravel road. The Urbanized landscaping, fencing and signage requirements were met. The tank battery contained three (3) 100 barrel stock tanks, a vertical separator and a DOM / EOG gas meter. The load lines were locked and plugged. No leaks were identified during this inspection. I did not see any residual effects from the oil release of 9/4/2014. No violations identified during this inspection.
1601299829 2008-10-07 Drill / Deepen / Reopen No Violations site made posted by city not to cross line
1892937342 2009-05-18 Production Wells No Violations Status check inspection found no violations at this time.
193539748 2014-9-15 0:00: UP No Violations
1939782992 2008-10-16 Drill / Deepen / Reopen No Violations The drilling pits have been solidified and are being covered over. Chemtron delivered 46 tons of dust equally divided between the two pits.
2058450191 2008-10-21 Drill / Deepen / Reopen No Violations The pits have been solidified and covered over and the tank battery is being built. The well is scheduled to be fraced next week.
225398073 2014-9-10 0:00: UP No Violations
275086507 2008-10-8 0:00: DD No Violations
597199888 2008-10-9 0:00: DD No Violations
61275857 2008-10-10 0:00 DD No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0270812657 US-OH-122808 2014-10-07 Well operation causing pollution and contamination
1411726616 US-OH-112114 2014-10-08 Well operation causing pollution and contamination

For data sources see[9]

References