If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23079 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.3,"lon":-81.48,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: TRANSCONTINENTAL OIL & GAS INC | |
Well Pad ID: | |
Farm/Lease Name: FERRARA | |
License Status: Producing | |
License Date: 2009-05-21 | |
Spud Date: 2009-07-27 | |
Spud Drilling Contractor: CAPSTAR DRILLING | |
Final Drill Date: 2009-08-03 | |
Well Total Depth: 3960.00 ft | |
Configuration: Vertical | |
Latitude: 41.300000 | |
Longitude: -81.480000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-05-21 | Proposed Formations:CLINTON, Issued Date:5/21/2009, Expired Date:5/21/2010 6:00:00 AM, Drilling unit acres:21.08, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2009-08-03 | |
Completion Report Received | 2009-12-22 | |
Construction Permit Expires | 2010-05-21 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
N2 | 0 | 168 Mscf | 40000 | NOTE THAT PERFED INTERVAL NOT INDICATED ON EITHER THE LOG OR WCR… |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | TRANSCONTINENTAL OIL & GAS INC | 2950.00 | 39.00 | 365 |
2011 | TRANSCONTINENTAL OIL & GAS INC | 412.00 | 0.00 | 365 |
2012 | TRANSCONTINENTAL OIL & GAS INC | 1568.00 | 41.00 | 366 |
2013 | TRANSCONTINENTAL OIL & GAS INC | 2943.00 | 51.00 | 365 |
2014 | TRANSCONTINENTAL OIL & GAS INC | 1030.00 | 45.00 | 365 |
2015 | TRANSCONTINENTAL OIL & GAS INC | 701.00 | 72.00 | 365 |
2016 | TRANSCONTINENTAL OIL & GAS INC | 566.00 | 45.00 | 365 |
2017 | TRANSCONTINENTAL OIL & GAS INC | 393.00 | 30.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | TRANSCONTINENTAL OIL & GAS INC | Brine | 1139 | 365 |
2011 | TRANSCONTINENTAL OIL & GAS INC | Brine | 307 | 365 |
2012 | TRANSCONTINENTAL OIL & GAS INC | Brine | 867 | 366 |
2013 | TRANSCONTINENTAL OIL & GAS INC | Brine | 835 | 365 |
2014 | TRANSCONTINENTAL OIL & GAS INC | Brine | 560 | 365 |
2015 | TRANSCONTINENTAL OIL & GAS INC | Brine | 315 | 365 |
2016 | TRANSCONTINENTAL OIL & GAS INC | Brine | 410 | 365 |
2017 | TRANSCONTINENTAL OIL & GAS INC | Brine | 513 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-136411948 | 2009-8-13 0:00: | DD | No Violations | |
-178342429 | 2009-8-4 0:00:0 | DD | No Violations | |
-1835100231 | 2009-10-8 0:00: | DD | No Violations | |
-1921536654 | 2010-7-23 0:00: | PL | No Violations | |
-520415029 | 2010-1-6 0:00:0 | PW | No Violations | |
-801164179 | 2009-8-7 0:00:0 | DD | No Violations | |
-818527446 | 2009-7-31 0:00: | DD | No Violations | |
0033943123 | 2010-06-02 | Production Wells | No Violations | The well is in production and the tank battery and wellhead are fenced. Preliminary restoration is due now. The site still needs some grading before seed and mulch. If the work is not completed by the end of June, a NOV will be issued. |
0136411948 | 2009-08-13 | Drill / Deepen / Reopen | No Violations | The drilling pits have been closed and the tank battery is being built. No violations at this time. |
0178342429 | 2009-08-04 | Drill / Deepen / Reopen | No Violations | The well is completed and Capstar has started rigging down. They are scheduled to move off location on 8/5. The pits are fenced, lined and in good condition. |
0183710282 | 2010-06-21 | Production Wells | No Violations | Preliminary reastoration is past due. The affected area has been graded but needs to be seeded and mulched. I met with Cal Marks and discussed both this well and the Hutcheson well which is also past due. |
0520415029 | 2010-01-06 | Production Wells | No Violations | The well is now in production. Preliminary restoration will be completed as soon as the weather permits in the spring. No violations at this time. |
0766915063 | 2009-10-21 | Drill / Deepen / Reopen | No Violations | This status check inspection found that the well has been fraced and tubed. The top perforation was reported to be at 3722 and the producing interval is less than 4000 deep. The spacing and set back minimums are therefore based on 20 acre requirements. The tank battery is nearly complete and the well should be ready to turn on in the near future. Preliminary restoration is due by the first of May 2010. |
0801164179 | 2009-08-07 | Drill / Deepen / Reopen | No Violations | Met on site with Cal Marks. Problems and complaints from two neighboring properties to the south and west continue. I suggested that he notify Macedonia police and fire before he does anything that the neighbors might notice or moves equipment on site including the frac equipment and the service rig. |
0818527446 | 2009-07-31 | Drill / Deepen / Reopen | No Violations | Meet with surveyor to confirm the as-drilled location of the well. The location issue was raised and challenged by a neighbor. This physical inspection confirmed that the well is being drilling in the correct and permitted location. |
1248921391 | 2009-07-27 | Drill / Deepen / Reopen | No Violations | Capstar Drilling Rig 4 is moving in and will spud the well tonight. The shale pit has been dug and lined. The blow pit will be dug later today. |
1392981310 | 2009-08-06 | Drill / Deepen / Reopen | No Violations | Transcontinental was on site to start solidifying the pits. The dump truck application was much more effective in keeping dust to a minimum. |
1445026252 | 2009-09-03 | Drill / Deepen / Reopen | No Violations | The tank battery is being built. The site has been rough graded, the pits have been solidified and covered. The well has not been fraced. |
1835100231 | 2009-10-08 | Drill / Deepen / Reopen | No Violations | The tank battery has been partially completed and the well is scheduled to be fraced next week. No violations at this time. |
183710282 | 2010-6-21 0:00: | PW | No Violations | |
1921536654 | 2010-07-23 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
33943123 | 2010-6-2 0:00:0 | PW | No Violations | |
766915063 | 2009-10-21 0:00 | DD | No Violations |
For data sources see[8]