If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23120 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.01,"lon":-81.56,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Coventry Township | |
Operator Name: CARGILL INC | |
Well Pad ID: | |
Farm/Lease Name: CITY OF AKRON(SMP #4) | |
License Status: Active Injection | |
License Date: 2010-09-23 | |
Spud Date: 2010-11-17 | |
Spud Drilling Contractor: UNION DRLG | |
Final Drill Date: 2010-12-02 | |
Well Total Depth: 3139.00 ft | |
Configuration: Vertical | |
Latitude: 41.010000 | |
Longitude: -81.560000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2010-09-23 | Proposed Formations:SALINA, Issued Date:9/23/2010, Expired Date:9/22/2012 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP |
Reached Total Depth | 2010-12-02 | |
Completion Report Received | 2011-05-27 | |
Construction Permit Expires | 2011-09-23 | |
Record Last Modified | 2015-11-24 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1011123396 | 2010-11-23 0:00 | SM | No Violations | |
-1013159274 | 2015-11-16 0:00 | SM | No Violations | |
-1124359250 | 2010-11-17 0:00 | SM | No Violations | |
-1325914645 | 2010-12-29 0:00 | SM | No Violations | |
-133943894 | 2011-10-24 0:00 | PL | No Violations | |
-1741134592 | 2014-12-5 0:00: | SM | No Violations | |
-1810127175 | 2016-8-16 0:00: | SM | No Violations | |
-2076835441 | 2020-2-24 0:00: | SM | No Violations | 0.30 |
0133943894 | 2011-10-24 | Preliminary Restoration | No Violations | Preliminary Restoration is approved. |
0169288525 | 2018-07-09 | Solution Mining Project | No Violations | I found the wellhead secure with a locked chain link fence. There is a wooden structure build over the wellhead. There is an identification sign posted. I observed no leaks or spills. |
0418861707 | 2010-11-28 | Solution Mining Project | No Violations | Union Rig 24 is drilling ahead with saltwater. Should TD the well in the next 24 hours. No violations at this time. |
1011123396 | 2010-11-23 | Solution Mining Project | No Violations | Union Drilling Rig 24 is drilling ahead on salt water. No violations at this time. |
1013159274 | 2015-11-16 | Solution Mining Project | No Violations | The Mechanical Integrity Testing of the City of Akron # 76 was group task with the hourly pressures being called into me by radio. The reference well was City of Akron # 79 ( 34-153-2-3169 ). The test parameters followed the Water - Brine Interface protocol. The duration of the M I T was eight (8) hours. The maximum pressure change allowable was 0.05 psi per hour. The City of Akron # 76 calculated to be 0.004 psi per hour. The City of Akron # 76 passed the test. |
1124359250 | 2010-11-17 | Solution Mining Project | No Violations | Union Drilling Rig 24 is nearly rigged up over the well. They should be ready to spud sometime tomorrow. |
1292250354 | 2010-11-26 | Urban Drill / Deepen / Reopen | No Violations | Union Drilling Rig 24 is drilling ahead with saltwater. No violations at this time. |
1325914645 | 2010-12-29 | Solution Mining Project | No Violations | Completed the mechanical integrity test on the 7 casing cemented in this well on 11/30. The test began at 09:00 am with an initial pressure of 565 psi. After 15 minutes, the pressure remained at 565 psi. The MIT passed. Cargill will notify MRM when the cement bond logs are scheduled for the Akron 76 and 77 wells. |
169288525 | 2018-7-9 0:00:0 | SM | No Violations | 0.20 |
1741134592 | 2014-12-05 | Solution Mining Project | No Violations | An inspection of the well found no violations at the time. |
1810127175 | 2016-08-16 | Solution Mining Project | No Violations | There were no violations at the time of inspection. |
1853676195 | 2020-8-28 0:00: | SM | No Violations | 6.70 |
1915525590 | 2013-06-24 | Solution Mining Project | No Violations | The well was properly identified. My inspection was accompanied by Andrew Adgate. |
344801129 | 2019-2-14 0:00: | SM | No Violations | 0.20 |
418861707 | 2010-11-28 0:00 | SM | No Violations |
For data sources see[3]