X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-169-24726

Well Details

Well ID: 34-169-24726
Loading map...
Country: United States
State: Ohio
County: Wayne
Municipality: Canaan Township
Operator Name: C & C PRODUCING LLC
Well Pad ID:
Farm/Lease Name: SHAFER HOMER T
License Status: Producing
License Date: 1991-01-07
Spud Date: 1991-07-16
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]]
Final Drill Date: 1991-07-23
Well Total Depth: 5675.00 ft
Configuration: Vertical
Latitude: 40.920000
Longitude: -81.910000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1989-09-05 265 CSAPO FRANK A JR GeoDate 9/5/89
Oil and Gas 1989-09-05 Issued Date 9/5/89 Expired Date 9/5/90 Acres 0098700 Tool Type RTAF Proposed Formation TRENTON-TPL Proposed Depth 05675 Proposed Drill Depth 05675
Plugged/Abandoned 1989-09-10
CO 1991-01-07 265 CSAPO FRANK A JR GeoDate 1/7/91
Oil and Gas 1991-01-07 Issued Date 1/7/91 Expired Date 1/7/92 Acres 0098700 Tool Type RTAF Proposed Formation TRENTON/TPL Proposed Depth 00000 Proposed Drill Depth 00000
Original Spud 1991-07-16
Completed 1991-07-23
Reached Total Depth 1991-07-23
Construction Permit Expires 1992-01-07
Completion Report Received 1998-09-30
Change of Owner 2010-05-17 Operator changed from 265, CSAPO LIMITED to 8423, C & C PRODUCING LLC
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2012-05-18 5588 5596 25
5588 5596 25
5588 5596 25

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 15 1500 Gal 0
ACID 15 1500 Gal 0
0 0 0 INFO. FOUND IN FORMATIONS

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1991 CSAPO LIMITED 0.00 3965.00 112
1992 CSAPO LIMITED 5219.00 8996.00 365
1993 CSAPO LIMITED 5364.00 5805.00 365
1994 CSAPO LIMITED 5420.00 2929.00 365
1995 CSAPO LIMITED 6090.00 1753.00 365
1996 CSAPO LIMITED 5350.00 1326.00 365
1997 CSAPO LIMITED 4736.00 1065.00 365
1998 CSAPO LIMITED 1032.00 845.00 365
2000 CSAPO LIMITED 2941.00 715.00 365
2001 CSAPO LIMITED 2966.00 882.00 365
2002 CSAPO LIMITED 2884.00 916.00 365
2003 CSAPO LIMITED 2735.00 521.00 365
2004 CSAPO LIMITED 3559.00 577.00 365
2005 CSAPO LIMITED 3213.00 869.00 365
2006 CSAPO LIMITED 2430.00 461.00 365
2007 CSAPO LIMITED 1631.00 5811.00 365
2008 CSAPO LIMITED 1632.00 508.00 365
2009 CSAPO LIMITED 1476.00 305.00 365
2010 C & C PRODUCING LLC 1520.00 493.00 365
2011 C & C PRODUCING LLC 1336.00 558.00 365
2012 C & C PRODUCING LLC 1234.00 522.00 366
2013 C & C PRODUCING LLC 975.00 323.00 365
2014 C & C PRODUCING LLC 837.00 326.00 365
2015 C & C PRODUCING LLC 432.00 201.00 365
2016 C & C PRODUCING LLC 515.00 188.00 365
2017 C & C PRODUCING LLC 142.00 51.00 365
2018 C & C PRODUCING LLC 32.00 101.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1991 CSAPO LIMITED Brine 0 112
1992 CSAPO LIMITED Brine 0 365
1993 CSAPO LIMITED Brine 0 365
1994 CSAPO LIMITED Brine 0 365
1995 CSAPO LIMITED Brine 0 365
1996 CSAPO LIMITED Brine 0 365
1997 CSAPO LIMITED Brine 0 365
1998 CSAPO LIMITED Brine 0 365
2000 CSAPO LIMITED Brine 12 365
2001 CSAPO LIMITED Brine 6 365
2002 CSAPO LIMITED Brine 14 365
2003 CSAPO LIMITED Brine 5 365
2004 CSAPO LIMITED Brine 0 365
2005 CSAPO LIMITED Brine 0 365
2006 CSAPO LIMITED Brine 0 365
2007 CSAPO LIMITED Brine 39 365
2008 CSAPO LIMITED Brine 0 365
2009 CSAPO LIMITED Brine 0 365
2010 C & C PRODUCING LLC Brine 143 365
2011 C & C PRODUCING LLC Brine 75 365
2012 C & C PRODUCING LLC Brine 114 366
2013 C & C PRODUCING LLC Brine 135 365
2014 C & C PRODUCING LLC Brine 90 365
2015 C & C PRODUCING LLC Brine 80 365
2016 C & C PRODUCING LLC Brine 69 365
2017 C & C PRODUCING LLC Brine 0 365
2018 C & C PRODUCING LLC Brine 145 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1802111883 2015-8-14 0:00: PW No Violations 0.50
-1862708701 2017-1-26 0:00: PL No Violations
-2127689774 2016-10-26 0:00 PW No Violations
0000016882 Preliminary Restoration No Violations PASSED Y WITNESSED 4/1/92 INSPECTOR HAROLD MORAVY DATE 04/0119/92 DATA FROM OLD VAX INFO
0241254030 2013-06-14 Production Wells No Violations This pump jack well has no apparent problems at time of inspection.
0701604418 2018-02-09 Production Wells No Violations Inspected production well on 02/09/2018. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank (shared), 1-vertical separator, 3-drips, and 1-meter box, located within an earthen dike; the diked area and 50 bbl tank are shared with the Rugh #2 well (PN: 169-24888). The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.
0925104864 2015-10-08 Production Wells No Violations Inspected production well on 10/08/2015. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank (shared with the Rugh #2 well), and 1-vertical separator located within an earthen dike. The well is equipped with a pump jack with an electric motor. The well was pumping at the time of the inspection. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.
1010651356 2014-06-12 Production Wells No Violations Producing pumping unit well with no apparent problems at time of inspection.
16882 PL No Violations
1788742635 2016-10-26 Preliminary Restoration No Violations Inspected production well on 10/26/2016. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes.
1802111883 2015-08-14 Production Wells No Violations This pumping unit well appears to have no problems at time of inspection.
1862708701 2017-01-26 Preliminary Restoration No Violations Inspected production well on 01/26/2017. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes.
2096873962 2017-01-26 Production Wells No Violations Inspected production well on 01/26/2017. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank (shared with the Rugh #2 well; PN: 169-24888), and 1-vertical separator, located within an earthen dike; the diked area is shared with the tank battery for the Rugh #2 well (PN: 169-24888). The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.
2127689774 2016-10-26 Production Wells No Violations Inspected production well on 10/26/2016. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank (shared with the Rugh #2 well; PN: 169-24888), and 1-vertical separator, located within an earthen dike. The diked area is shared with the production equipment for the Rugh #2 well (PN: 169-24888). The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection.
214924341 2019-9-25 0:00: PW No Violations
241254030 2013-6-14 0:00: PW No Violations 0.50
434711764 2020-5-1 0:00:0 PW No Violations
701604418 2018-2-9 0:00:0 PW No Violations
925104864 2015-10-8 0:00: PW No Violations

For data sources see[9]

References