If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-24726 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.92,"lon":-81.91,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: Canaan Township | |
Operator Name: C & C PRODUCING LLC | |
Well Pad ID: | |
Farm/Lease Name: SHAFER HOMER T | |
License Status: Producing | |
License Date: 1991-01-07 | |
Spud Date: 1991-07-16 | |
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]] | |
Final Drill Date: 1991-07-23 | |
Well Total Depth: 5675.00 ft | |
Configuration: Vertical | |
Latitude: 40.920000 | |
Longitude: -81.910000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1989-09-05 | 265 CSAPO FRANK A JR GeoDate 9/5/89 |
Oil and Gas | 1989-09-05 | Issued Date 9/5/89 Expired Date 9/5/90 Acres 0098700 Tool Type RTAF Proposed Formation TRENTON-TPL Proposed Depth 05675 Proposed Drill Depth 05675 |
Plugged/Abandoned | 1989-09-10 | |
CO | 1991-01-07 | 265 CSAPO FRANK A JR GeoDate 1/7/91 |
Oil and Gas | 1991-01-07 | Issued Date 1/7/91 Expired Date 1/7/92 Acres 0098700 Tool Type RTAF Proposed Formation TRENTON/TPL Proposed Depth 00000 Proposed Drill Depth 00000 |
Original Spud | 1991-07-16 | |
Completed | 1991-07-23 | |
Reached Total Depth | 1991-07-23 | |
Construction Permit Expires | 1992-01-07 | |
Completion Report Received | 1998-09-30 | |
Change of Owner | 2010-05-17 | Operator changed from 265, CSAPO LIMITED to 8423, C & C PRODUCING LLC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2012-05-18 | 5588 | 5596 | 25 |
5588 | 5596 | 25 | |
5588 | 5596 | 25 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 15 | 1500 Gal | 0 | |||
ACID | 15 | 1500 Gal | 0 | |||
0 | 0 | 0 | INFO. FOUND IN FORMATIONS |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1991 | CSAPO LIMITED | 0.00 | 3965.00 | 112 |
1992 | CSAPO LIMITED | 5219.00 | 8996.00 | 365 |
1993 | CSAPO LIMITED | 5364.00 | 5805.00 | 365 |
1994 | CSAPO LIMITED | 5420.00 | 2929.00 | 365 |
1995 | CSAPO LIMITED | 6090.00 | 1753.00 | 365 |
1996 | CSAPO LIMITED | 5350.00 | 1326.00 | 365 |
1997 | CSAPO LIMITED | 4736.00 | 1065.00 | 365 |
1998 | CSAPO LIMITED | 1032.00 | 845.00 | 365 |
2000 | CSAPO LIMITED | 2941.00 | 715.00 | 365 |
2001 | CSAPO LIMITED | 2966.00 | 882.00 | 365 |
2002 | CSAPO LIMITED | 2884.00 | 916.00 | 365 |
2003 | CSAPO LIMITED | 2735.00 | 521.00 | 365 |
2004 | CSAPO LIMITED | 3559.00 | 577.00 | 365 |
2005 | CSAPO LIMITED | 3213.00 | 869.00 | 365 |
2006 | CSAPO LIMITED | 2430.00 | 461.00 | 365 |
2007 | CSAPO LIMITED | 1631.00 | 5811.00 | 365 |
2008 | CSAPO LIMITED | 1632.00 | 508.00 | 365 |
2009 | CSAPO LIMITED | 1476.00 | 305.00 | 365 |
2010 | C & C PRODUCING LLC | 1520.00 | 493.00 | 365 |
2011 | C & C PRODUCING LLC | 1336.00 | 558.00 | 365 |
2012 | C & C PRODUCING LLC | 1234.00 | 522.00 | 366 |
2013 | C & C PRODUCING LLC | 975.00 | 323.00 | 365 |
2014 | C & C PRODUCING LLC | 837.00 | 326.00 | 365 |
2015 | C & C PRODUCING LLC | 432.00 | 201.00 | 365 |
2016 | C & C PRODUCING LLC | 515.00 | 188.00 | 365 |
2017 | C & C PRODUCING LLC | 142.00 | 51.00 | 365 |
2018 | C & C PRODUCING LLC | 32.00 | 101.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1991 | CSAPO LIMITED | Brine | 0 | 112 |
1992 | CSAPO LIMITED | Brine | 0 | 365 |
1993 | CSAPO LIMITED | Brine | 0 | 365 |
1994 | CSAPO LIMITED | Brine | 0 | 365 |
1995 | CSAPO LIMITED | Brine | 0 | 365 |
1996 | CSAPO LIMITED | Brine | 0 | 365 |
1997 | CSAPO LIMITED | Brine | 0 | 365 |
1998 | CSAPO LIMITED | Brine | 0 | 365 |
2000 | CSAPO LIMITED | Brine | 12 | 365 |
2001 | CSAPO LIMITED | Brine | 6 | 365 |
2002 | CSAPO LIMITED | Brine | 14 | 365 |
2003 | CSAPO LIMITED | Brine | 5 | 365 |
2004 | CSAPO LIMITED | Brine | 0 | 365 |
2005 | CSAPO LIMITED | Brine | 0 | 365 |
2006 | CSAPO LIMITED | Brine | 0 | 365 |
2007 | CSAPO LIMITED | Brine | 39 | 365 |
2008 | CSAPO LIMITED | Brine | 0 | 365 |
2009 | CSAPO LIMITED | Brine | 0 | 365 |
2010 | C & C PRODUCING LLC | Brine | 143 | 365 |
2011 | C & C PRODUCING LLC | Brine | 75 | 365 |
2012 | C & C PRODUCING LLC | Brine | 114 | 366 |
2013 | C & C PRODUCING LLC | Brine | 135 | 365 |
2014 | C & C PRODUCING LLC | Brine | 90 | 365 |
2015 | C & C PRODUCING LLC | Brine | 80 | 365 |
2016 | C & C PRODUCING LLC | Brine | 69 | 365 |
2017 | C & C PRODUCING LLC | Brine | 0 | 365 |
2018 | C & C PRODUCING LLC | Brine | 145 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1802111883 | 2015-8-14 0:00: | PW | No Violations | 0.50 |
-1862708701 | 2017-1-26 0:00: | PL | No Violations | |
-2127689774 | 2016-10-26 0:00 | PW | No Violations | |
0000016882 | Preliminary Restoration | No Violations | PASSED Y WITNESSED 4/1/92 INSPECTOR HAROLD MORAVY DATE 04/0119/92 DATA FROM OLD VAX INFO | |
0241254030 | 2013-06-14 | Production Wells | No Violations | This pump jack well has no apparent problems at time of inspection. |
0701604418 | 2018-02-09 | Production Wells | No Violations | Inspected production well on 02/09/2018. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank (shared), 1-vertical separator, 3-drips, and 1-meter box, located within an earthen dike; the diked area and 50 bbl tank are shared with the Rugh #2 well (PN: 169-24888). The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
0925104864 | 2015-10-08 | Production Wells | No Violations | Inspected production well on 10/08/2015. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank (shared with the Rugh #2 well), and 1-vertical separator located within an earthen dike. The well is equipped with a pump jack with an electric motor. The well was pumping at the time of the inspection. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
1010651356 | 2014-06-12 | Production Wells | No Violations | Producing pumping unit well with no apparent problems at time of inspection. |
16882 | PL | No Violations | ||
1788742635 | 2016-10-26 | Preliminary Restoration | No Violations | Inspected production well on 10/26/2016. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
1802111883 | 2015-08-14 | Production Wells | No Violations | This pumping unit well appears to have no problems at time of inspection. |
1862708701 | 2017-01-26 | Preliminary Restoration | No Violations | Inspected production well on 01/26/2017. All drilling equipment and debris has been removed, pits closed, and the well placed into production. Preliminary restoration passes. |
2096873962 | 2017-01-26 | Production Wells | No Violations | Inspected production well on 01/26/2017. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank (shared with the Rugh #2 well; PN: 169-24888), and 1-vertical separator, located within an earthen dike; the diked area is shared with the tank battery for the Rugh #2 well (PN: 169-24888). The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
2127689774 | 2016-10-26 | Production Wells | No Violations | Inspected production well on 10/26/2016. The tank battery consists of 2-100 bbl steel tanks, 1-50 bbl steel tank (shared with the Rugh #2 well; PN: 169-24888), and 1-vertical separator, located within an earthen dike. The diked area is shared with the production equipment for the Rugh #2 well (PN: 169-24888). The well is equipped with a pump jack with an electric motor. Well identification is clearly displayed at both the tank battery and the wellhead. No problems were noted at the time of the inspection. |
214924341 | 2019-9-25 0:00: | PW | No Violations | |
241254030 | 2013-6-14 0:00: | PW | No Violations | 0.50 |
434711764 | 2020-5-1 0:00:0 | PW | No Violations | |
701604418 | 2018-2-9 0:00:0 | PW | No Violations | |
925104864 | 2015-10-8 0:00: | PW | No Violations |
For data sources see[9]