If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-035-21515 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.5,"lon":-81.43,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: GREEN ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: GILMOUR ACADEMY | |
License Status: Producing | |
License Date: 1991-01-07 | |
Spud Date: 1991-04-26 | |
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]] | |
Final Drill Date: 1991-04-30 | |
Well Total Depth: 3645.00 ft | |
Configuration: Vertical | |
Latitude: 41.500000 | |
Longitude: -81.430000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1991-01-07 | Issued Date 1/7/91 Expired Date 1/7/92 Acres 0020000 Tool Type RTF Proposed Formation CLINTON Proposed Depth 03645 Proposed Drill Depth 03645 |
Original Spud | 1991-04-25 | |
Completed | 1991-04-30 | |
Reached Total Depth | 1991-04-30 | |
CO | 1991-06-18 | 507 DOME DRILLING CO GeoDate 1/7/91 |
Completion Report Received | 1991-09-26 | |
Construction Permit Expires | 1992-01-07 | |
Change of Owner | 2009-12-29 | Operator changed from 507, DOME DRILLING CO to 1453, GREEN ENERGY INC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 3440 | 3520 | 0 |
3440 | 3520 | 0 | |
2006-09-11 | 3473 | 3492 | 2 |
3473 | 3492 | 2 | |
3440 | 3520 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
GEL | 0 | 250 Lbs | 0 | WITH SURFACTANT, CLAY STABILIZER, FRICTION REDUCER & BACTERICIDE. | ||
H2O | 0 | 68590 Gal | 40000 | FRAC W/68,590 GAL WATER AND 400 SX |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1991 | DOME DRILLING CO | 4984.00 | 0.00 | 150 |
1992 | DOME DRILLING CO | 10236.00 | 0.00 | 365 |
1993 | DOME DRILLING CO | 16005.00 | 0.00 | 365 |
1994 | DOME DRILLING CO | 19846.00 | 65.00 | 365 |
1995 | DOME DRILLING CO | 33872.00 | 0.00 | 365 |
1996 | DOME DRILLING CO | 35324.00 | 144.00 | 365 |
1997 | DOME DRILLING CO | 48345.00 | 56.00 | 365 |
1998 | DOME DRILLING CO | 37508.00 | 0.00 | 365 |
1999 | DOME DRILLING CO | 19910.00 | 25.00 | 365 |
2000 | DOME DRILLING CO | 29515.00 | 0.00 | 365 |
2001 | DOME DRILLING CO | 22320.00 | 15.00 | 365 |
2002 | DOME DRILLING CO | 20341.00 | 0.00 | 365 |
2003 | DOME DRILLING CO | 24631.00 | 0.00 | 365 |
2004 | DOME DRILLING CO | 29216.00 | 0.00 | 365 |
2005 | DOME DRILLING CO | 17027.00 | 22.00 | 365 |
2006 | DOME DRILLING CO | 11826.00 | 0.00 | 365 |
2007 | DOME DRILLING CO | 9485.00 | 0.00 | 365 |
2008 | DOME DRILLING CO | 22454.00 | 36.00 | 365 |
2009 | DOME DRILLING CO | 11576.00 | 9.00 | 365 |
2010 | GREEN ENERGY INC | 5603.00 | 0.00 | 365 |
2011 | GREEN ENERGY INC | 4614.00 | 0.00 | 277 |
2012 | GREEN ENERGY INC | 361.00 | 0.00 | 245 |
2013 | GREEN ENERGY INC | 2666.00 | 0.00 | 365 |
2014 | GREEN ENERGY INC | 3177.00 | 0.00 | 365 |
2015 | GREEN ENERGY INC | 3823.00 | 0.00 | 365 |
2016 | GREEN ENERGY INC | 6926.00 | 0.00 | 365 |
2017 | GREEN ENERGY INC | 5706.00 | 38.00 | 365 |
2018 | GREEN ENERGY INC | 3270.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1991 | DOME DRILLING CO | Brine | 0 | 150 |
1992 | DOME DRILLING CO | Brine | 0 | 365 |
1993 | DOME DRILLING CO | Brine | 0 | 365 |
1994 | DOME DRILLING CO | Brine | 0 | 365 |
1995 | DOME DRILLING CO | Brine | 0 | 365 |
1996 | DOME DRILLING CO | Brine | 83 | 365 |
1997 | DOME DRILLING CO | Brine | 45 | 365 |
1998 | DOME DRILLING CO | Brine | 0 | 365 |
1999 | DOME DRILLING CO | Brine | 0 | 365 |
2000 | DOME DRILLING CO | Brine | 25 | 365 |
2001 | DOME DRILLING CO | Brine | 56 | 365 |
2002 | DOME DRILLING CO | Brine | 0 | 365 |
2003 | DOME DRILLING CO | Brine | 45 | 365 |
2004 | DOME DRILLING CO | Brine | 50 | 365 |
2005 | DOME DRILLING CO | Brine | 0 | 365 |
2006 | DOME DRILLING CO | Brine | 0 | 365 |
2007 | DOME DRILLING CO | Brine | 0 | 365 |
2008 | DOME DRILLING CO | Brine | 85 | 365 |
2009 | DOME DRILLING CO | Brine | 0 | 365 |
2010 | GREEN ENERGY INC | Brine | 160 | 365 |
2011 | GREEN ENERGY INC | Brine | 110 | 277 |
2012 | GREEN ENERGY INC | Brine | 2501 | 245 |
2013 | GREEN ENERGY INC | Brine | 299 | 365 |
2014 | GREEN ENERGY INC | Brine | 240 | 365 |
2015 | GREEN ENERGY INC | Brine | 103 | 365 |
2016 | GREEN ENERGY INC | Brine | 116 | 365 |
2017 | GREEN ENERGY INC | Brine | 103 | 365 |
2018 | GREEN ENERGY INC | Brine | 63 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1595570558 | 2010-12-1 0:00: | PW | No Violations | |
-1800556905 | 2010-11-16 0:00 | PW | No Violations | |
-204606736 | 2017-2-27 0:00: | UP | No Violations | |
-2144832614 | 2010-11-23 0:00 | PW | No Violations | |
-329108818 | 2010-12-9 0:00: | PW | No Violations | |
-484410016 | 2018-7-13 0:00: | UP | No Violations | 1.00 |
-951029631 | 2010-11-10 0:00 | PW | No Violations | |
0204606736 | 2017-02-27 | UrbanProduction Wells | No Violations | I inspected this producing well as part of routine inspection activity. The well and battery are located NW of the lower school parking area and are accessed via an unpaved maintenance drive which is shared with the school. The drive continues to the east and affords access to the #3 well (#2-1650), and well as other parts of the school grounds. The battery and wellhead are in separate chain-link enclosures which were locked and secure. The load-lines were locked. Secondary containment at the battery was present and intact and dry. Spark arrestor, charcoal filter, and sealing tank lids have been added since a previous inspection found these elements missing. The ID signage at the battery had been remedied and is satisfactory. Fittings and connections at the wellhead and battery are secure and free from signs of leakage or problems. |
0329108818 | 2010-12-09 | Production Wells | No Violations | All contaminated soil and gravel has been removed from site and new gravel replaced and oil storage tank has been reset.
Case closed |
0484410016 | 2018-07-13 | UrbanProduction Wells | No Violations | I inspected this producing well as part of routine inspection activity. The battery and wellhead are in separate chain-link enclosures which were locked and secure. The former plunger-lift system had been replaced with a pump jack. The well was in production. The fittings and connections were secure. The load-lines were locked. Secondary containment at the battery was present and intact and dry. |
0509669623 | 2011-01-04 | Production Wells | No Violations | Oil contaminated soil and gravel removed from site and disposed of, new gravel replace and tanks reset. |
0951029631 | 2010-11-10 | Production Wells | Violations Noted | Company called in to report a spill approximately 2 bbls of oil from oil storage tank that overflowed on Tuesday the 9th. The oil was contained inside the dike. I advised Mr.Gessle to cleanup oil remove fluids and remove gravel to landfill.
Will monitor site for final cleanup! |
1369344899 | 2013-05-23 | UrbanProduction Wells | No Violations | The producing unit consists of the following elements: a wellhead with pumpjack in a chain-link enclosure, and a tank battery system also in a chain-link enclosure. The enclosures are secured with locks and in in good condition. The tank battery is comprised of two 100-barrel steel tanks, and mechanical separator. Safety equipment is needed. I did not observe any other problems or violations. I contacted Jim with Green Energy and advised him that safety equipment would be needed within the next 30 days. |
1374697512 | 2013-07-24 | UrbanProduction Wells | Violations Noted | The producing unit consists of a wellhead with pumpjack unit and above-ground storage tank (AST) battery. The wellhead is located in a chain-link enclosure which is locked. The well is currently producing. There is no ID at the wellhead. I did not observe any signs of leakage or problems. The AST battery is comprised of one 140-barrel production tank, one 50-barrel brine tank, and mechanical separator in a chain-link enclosure. There is a unit ID at the wellhead. Secondary containment is good. The unit is lacking safety equipment in accordance with 1501:9-9-05E. I advised Green Energy that the ID and safety gear should be adressed before the start of school year. |
1385920917 | 2013-11-22 | UrbanProduction Wells | Violations Noted | Safety equipment has been added in accordance with 1501:9-0-05E. No problems noted |
1459260727 | 2017-02-15 | UrbanProduction Wells | No Violations | I inspected this well as part of routine inspection activity. At the time of this inspection, I observed the following elements: a wellhead with pump jack system in a chain-link enclosure. The enclosure gate was locked and secure. Fittings and connections were secure. The associated battery was comprised of two 100-barrel steel tanks and separator unit in a separate chain-link enclosure. The enclosure gates were locked and secure. Load-line valves were plugged and locked. The secondary containment was intact. Production reports are current. I walked the area surrounding the well and battery and found it to be comprised of small deciduous trees, shrubs and wild vegetation with no evidence of drainage problems or signs of impacts relative to the on-going production activity. Access to the well and battery is afforded by a shared-use, gravel-paved access path which is maintained by the school facility and was in good condition. |
1595570558 | 2010-12-01 | Production Wells | No Violations | Site stable no off site run off. |
1800556905 | 2010-11-16 | Production Wells | No Violations | Company waiting on samples to be tested for disposal of gravel. All oily fluid has been removed from site. Company plans to set another 100 bbl tank in tank battery had to get approval from landowner. |
2057777074 | 2003-09-25 | Production Wells | No Violations | inspected well and tank battery. 210bbls, seperator, plastic brine. |
2144832614 | 2010-11-23 | Production Wells | No Violations | Called company to check cleanup. Dike still holding fluid no oil present on fluid. Company still waiting on test results for material to go to landfill. |
509669623 | 2011-1-4 0:00:0 | PW | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0951029631 | US-OH-130867 | 2010-11-30 | Well operation causing pollution and contamination | |
1374697512 | US-OH-111103 | 2013-07-25 | ID (a-i) | |
1374697512 | US-OH-111104 | 2013-07-25 | TANKS (a-i) | |
1385920917 | US-OH-111456 | 2016-07-26 | 9-05E5 | OPERATIONMAINTANCE (a-c) |
For data sources see[9]