If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-035-22066 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.55,"lon":-81.4,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: | |
Farm/Lease Name: BOGOMOLNY UNIT | |
License Status: Producing | |
License Date: 2008-09-02 | |
Spud Date: 2008-11-13 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2008-11-19 | |
Well Total Depth: 3430.00 ft | |
Configuration: Vertical | |
Latitude: 41.550000 | |
Longitude: -81.400000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-09-02 | Proposed Formations:CLINTON, Issued Date:9/2/2008, Expired Date:9/2/2009 6:00:00 AM, Drilling unit acres:42.1998, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2008-10-03 | ADDED X,Y COORDINATE TO DATABASE: X= 2,298,670 AND Y= 688,849. |
Reached Total Depth | 2008-11-19 | LOG TD TAKEN FROM CASED HOLE; COULD NOT GET OPEN-HOLE LOG TO BOTTOM |
Completion Report Received | 2009-01-13 | LOG TD TAKEN FROM CASED HOLE; COULD NOT GET OPEN-HOLE LOG TO BOTTOM |
Correction to Well | 2009-07-10 | UNIT SIZE DECREASED TO 25.4998 ACRES. |
Construction Permit Expires | 2009-09-02 | LOG TD TAKEN FROM CASED HOLE; COULD NOT GET OPEN-HOLE LOG TO BOTTOM |
Change of Owner | 2019-05-30 | Operator changed from 169, JAMES R SMAIL INC to 9722, PIN OAK ENERGY PARTNERS LLC |
Record Last Modified | 2019-05-30 | LOG TD TAKEN FROM CASED HOLE; COULD NOT GET OPEN-HOLE LOG TO BOTTOM |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-01-26 | 3237 | 3255 | 19 |
3237 | 3255 | 19 | |
3237 | 3255 | 19 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 73000 Gal | 50000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | JAMES R SMAIL INC | 1745.00 | 617.00 | 0 |
2010 | JAMES R SMAIL INC | 11347.00 | 955.00 | 365 |
2011 | JAMES R SMAIL INC | 58296.00 | 1434.00 | 365 |
2012 | JAMES R SMAIL INC | 33657.00 | 647.00 | 366 |
2013 | JAMES R SMAIL INC | 26228.00 | 395.00 | 365 |
2014 | JAMES R SMAIL INC | 20128.00 | 259.00 | 365 |
2015 | JAMES R SMAIL INC | 24527.00 | 233.00 | 365 |
2016 | JAMES R SMAIL INC | 26235.00 | 234.00 | 365 |
2017 | JAMES R SMAIL INC | 12837.00 | 74.00 | 365 |
2018 | JAMES R SMAIL INC | 19161.00 | 119.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | JAMES R SMAIL INC | Brine | 1690 | 0 |
2010 | JAMES R SMAIL INC | Brine | 1237 | 365 |
2011 | JAMES R SMAIL INC | Brine | 1837 | 365 |
2012 | JAMES R SMAIL INC | Brine | 1941 | 366 |
2013 | JAMES R SMAIL INC | Brine | 1947 | 365 |
2014 | JAMES R SMAIL INC | Brine | 1407 | 365 |
2015 | JAMES R SMAIL INC | Brine | 1911 | 365 |
2016 | JAMES R SMAIL INC | Brine | 1708 | 365 |
2017 | JAMES R SMAIL INC | Brine | 1212 | 365 |
2018 | JAMES R SMAIL INC | Brine | 1495 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1226155626 | 2013-2-25 0:00: | UP | No Violations | |
-146560125 | 2017-3-13 0:00: | UP | No Violations | 1.00 |
-335196564 | 2011-12-27 0:00 | UL | No Violations | 1.50 |
0146560125 | 2017-03-13 | UrbanProduction Wells | No Violations | I inspected this producing well as part of routine inspection. At the time of this inspection I observed the following: a wellhead with pump jack system and associated tank battery in separate enclosures which were locked and secure. The valves and connections at both the well and battery were secure and free from signs of leakage. Process safety equipment was present. ID signage was present and accurate. The areas surrounding the well and battery were comprised of fringe areas of shrubbery and grass on a moderate hillslope that drops off to the west towards the Chagrin River, located 1,000 feet to the west. I walked the surrounding areas and found no signs of impacts or degradation. Access to the well and battery was afforded by a dedicated, gravel-paved access road, with a locked access gate. The access road was sound and well drained with no wash-outs or other erosional deficits. |
0335196564 | 2011-12-27 | UrbanPreliminary Restoration | No Violations | On 12/27/2012, DNR Inspector Richard Skidmore completed an urban preliminary restoration well inspection for DNR Inspector Ray Wallace. The lease road, tank battery, and well head locations are in compliance with 1501:9-9-05. Inspection passed. |
1026951345 | 2008-11-18 | Drill / Deepen / Reopen | No Violations | cementing 4.5 casing in |
1226155626 | 2013-02-25 | UrbanProduction Wells | No Violations | The producing unit consists of the following elements: A production wellhead and tank battery. The production wellhead consists of a pumpjack system in a 6 enclosure. The tank battery is comprised of 1 100-barrel (BBL) tank, 10 BBL poly tank, mechanical separator, and associated piping and appurtenances enclosed in an 8 enclosure. The system is equipped with production safety equipment required by 1509:9-9-05. The loadout lines are locked and the secondary containment is good. I did not observe any leaks, releases, or problems. |
For data sources see[9]