Well ID: 34-007-24559 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.52,"lon":-80.72,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Ashtabula | |
Municipality: Colebrook Township | |
Operator Name: US ENERGY OH LLC | |
Well Pad ID: | |
Farm/Lease Name: DUMITRAS UNIT | |
License Status: Producing | |
License Date: 2017-02-14 | |
Spud Date: 2017-02-27 | |
Spud Drilling Contractor: US ENERGY DRILLING LLC | |
Final Drill Date: 2017-04-24 | |
Well Total Depth: 6291.00 ft | |
Configuration: Horizontal | |
Latitude: 41.520000 | |
Longitude: -80.720000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-02-14 | Proposed Formations:WHITE CLINTON, Issued Date:2/14/2017, Expired Date:2/14/2019 12:00:00 PM, Drilling unit acres:346.8, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2017-04-07 | UPDATE ACREAGE/DRILL UNIT-ALE |
Reached Total Depth | 2017-04-24 | |
Correction to Well | 2017-05-26 | unit size changed |
Correction to Well | 2017-06-01 | UPDATE TARGET/TAKEPOINT-ALE |
Construction Permit Expires | 2019-02-14 | |
Record Last Modified | 2019-06-07 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-06-06 | 6190 | 6250 | 30 |
2017-06-06 | 4590 | 4653 | 30 |
6190 | 6250 | 30 | |
4590 | 4653 | 30 | |
4590 | 4653 | 30 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-05-18 | GEL | 8 | 657 Bbl | 0 | Reliance Well Service | SATGE 1/19
STAGES 2-18 SEE IMAGES |
2017-05-21 | GEL | 8 | 449 Bbl | 0 | Reliance Well Service | STAGE 19/19
STAGES 2-18 SEE IMAGES |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | US ENERGY OH LLC | 2715.00 | 920.00 | 74 |
2018 | US ENERGY OH LLC | 6964.00 | 3301.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | US ENERGY OH LLC | Brine | 2433 | 74 |
2018 | US ENERGY OH LLC | Brine | 4441 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1190050035 | 2017-2-14 0:00: | DD | No Violations | |
-1455355513 | 2017-2-10 0:00: | DD | No Violations | |
-153151485 | 2017-2-21 0:00: | DD | No Violations | |
-1615809688 | 2017-2-6 0:00:0 | DD | No Violations | |
-2055853722 | 2017-8-22 0:00: | PL | No Violations | |
-809241710 | 2017-9-26 0:00: | PL | No Violations | |
0109701768 | 2017-02-27 | Drill / Deepen / Reopen | No Violations | I arrived on site to find the drilling rig was drilling at 42 feet on the conductor bore. |
0153151485 | 2017-02-21 | Drill / Deepen / Reopen | No Violations | I arrived on site to find the road to the wellsite has been rocked and 90 percent of the wellsite has been rocked. A earthen pit has been established at the south-east corner of the wellsite area. There has been a silt fence established on the south and west sides of the wellsite location. |
0673413666 | 2017-10-03 | Production Wells | No Violations | Moore Well Service was lowering .75 inch sucker rods into the 2.375 tubing in order to initiate production. The pump jack was powered with electric. I walked the pad and did not see any contamination or leaks. The seeded area requires additional time for growth and stabilizing prior to qualifying for preliminary restoration classification. |
0767424188 | 2017-02-13 | Drill / Deepen / Reopen | No Violations | I arrived on site to find the company was grading the wellsite area. A silt fence had been established on the south side of the wellsite location. |
0809241710 | 2017-09-26 | Preliminary Restoration | No Violations | Personnel from U S Energy were constructing and positioning the pumping unit on the Dumitras Unit # 2-H well. The well still lacked sucker rods and downhole pump, which were on location. The lease road afforded good access to the stone pad. The tank battery had the I D signage posted. An earthen dike surrounded the tank battery and GPU. Grass was growing on the dike. The load lines were locked. The seeded were starting to grow, but there were bare areas remaining that have yet to fill in. The erosional controls were still in place and effective. I spoke with Cary LeShock concerning the water trucks not having the required U I C registration and told him that brine cannot be haul until the trucks are registered. No violations identified during this inspection. |
109701768 | 2017-2-27 0:00: | DD | No Violations | |
1190050035 | 2017-02-14 | Drill / Deepen / Reopen | No Violations | I arrived on site to find the company was preparing the wellsite for the drilling rig. |
1335206521 | 2017-04-19 | Drill / Deepen / Reopen | No Violations | I arrived on site to find the drilling rig was at a depth of 4142. They were in the process in running a survey of the well bore. |
1344219978 | 2017-02-16 | Drill / Deepen / Reopen | No Violations | I arrived on site to find the company was hauling stone for the lease road. |
1403517040 | 2019-6-3 0:00:0 | PW | No Violations | |
1455355513 | 2017-02-10 | Drill / Deepen / Reopen | No Violations | I arrived on site to find company was in the process in removing the trees from the wellsite area. |
1461809129 | 2017-06-28 | Drill / Deepen / Reopen | No Violations | I performed a site inspection on this location. They are preparing to frac the well. The well are fraced. The pits are in good condition with ample room before over flowing. Location is well maintained and clean. |
1496234334 | 2017-02-09 | Drill / Deepen / Reopen | No Violations | I arrived on site to find company was hauling stone for the entrance to the wellsite. |
1503936571 | 2017-08-28 | Preliminary Restoration | No Violations | I conducted a follow up inspection after being contacted by U S Energy ( Harry) that the requested items for restoration had been completed. My inspection revealed that the disturbed areas had been reseeded and the small brush in the woods was removed. The area requires time to allow vegetation. I will re - inspect this location to assess compliance for preliminary restoration. |
1526309086 | 2018-05-01 | Production Wells | No Violations | The Dumitras 2- H well is equipped with electric pumping well. The tank battery was shared with the Dumitras 1- H well ( 34-007-2-4560 ). The tank battery was comprised of three (3) 210 barrel stock tanks and a Gas Production Unit ( GPU ). The tank pad was surrounded by a earthen dike. |
1615809688 | 2017-02-06 | Drill / Deepen / Reopen | No Violations | I met with Harry Mills and Mark Anderson with U S Energy on site to discuss construction of well site and drilling of a horizontal clinton well in Ashtabula county. |
1626707866 | 2017-04-04 | Drill / Deepen / Reopen | No Violations | I was on site to witness the testing of the BOP. The company pressured up the annulus of the drill stem to 450 psi then shut-in the annulus. They held the pressure for 15 minutes with no loss of pressure. The test passed. |
2055853722 | 2017-08-22 | Preliminary Restoration | No Violations | I inspected this pad for preliminary restoration compliance. Access was gained on a gravel lease road to the stone pad. I found that the tank battery was constructed, the disturbed areas were graded and seeded. The electric service for the pumping units was installed. The tank battery consisted of three (3) - 210 barrel stock tanks and one - (1) Gas Production Unit ( GPU ). The tank battery was surrounded with an earthen dike which was seeded and strawed. The GPU was diked. There was one (1) 500 barrel frac tank that needed to be removed from location. The disturbed areas had spotty vegetative growth and would require reseeding east and south of the tank battery. There was small brush in the woods that requires removal and placement with the rest of the brush previously stockpiled. I will speak with U S Energy to resolve. Preliminary Restoration was not passed during this inspection. |
2147315544 | 2017-04-07 | Drill / Deepen / Reopen | No Violations | I was on site to witness the testing of the pipe rams and the blind rams. The company pressured up on the annulus of the drill stem to 400 psi. They then closed in the annulus. They held the pressure for 15 minutes with no loss of pressure. The test passed. |
673413666 | 2017-10-3 0:00: | PW | No Violations | |
767424188 | 2017-2-13 0:00: | DD | No Violations |
For data sources see[9]