X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-093-21321

Well Details

Well ID: 34-093-21321
Loading map...
Country: United States
State: Ohio
County: Lorain
Municipality: Columbia Township
Operator Name: GREEN ENERGY INC
Well Pad ID:
Farm/Lease Name: GOODMAN
License Status: Final Restoration
License Date: 2013-10-07
Spud Date: 1989-09-13
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]]
Final Drill Date: 1989-09-16
Well Total Depth: 2870.00 ft
Configuration: Vertical
Latitude: 41.300000
Longitude: -81.900000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1986-11-06 909 DOME PRODUCING GeoDate 11/6/86
Oil and Gas 1986-11-06 Issued Date 11/6/86 Expired Date 11/6/87 Acres 0020000 Tool Type CRAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000
CO 1989-06-20 507 DOME DRILLING CO GeoDate 6/20/89
Oil and Gas 1989-06-20 Issued Date 6/20/89 Expired Date 6/20/90 Acres 0020000 Tool Type CRAF Proposed Formation CLINTON Proposed Depth 02870 Proposed Drill Depth 02870
Original Spud 1989-09-12 R.I. 6-24-89
Completed 1989-09-16 R.I. 6-24-89
Reached Total Depth 1989-09-16 R.I. 6-24-89
Completion Report Received 1990-01-25 R.I. 6-24-89
Change of Owner 2009-12-29 Operator changed from 507, DOME DRILLING CO to 1453, GREEN ENERGY INC
APP 2011-05-18 Proposed Formations:NEWBURG, Issued Date:5/18/2011, Expired Date:5/17/2013 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:EOUT
Plugged Back 2011-07-11 R.I. 6-24-89
APP 2013-10-07 Proposed Formations:CABOT HEAD, Issued Date:10/7/2013, Expired Date:10/7/2015 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2014-09-29 R.I. 6-24-89
Construction Permit Expires 2015-10-07 R.I. 6-24-89
Record Last Modified 2017-06-27 R.I. 6-24-89

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 2740 2803 0
2740 2803 0
2006-09-11 2742 2801 22
2742 2801 22
2740 2803 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 15 300 Gal 0 FRAC:WATER/SAND/ACID
H2O 0 59000 Gal 30000 AVG. 25 BPM AT 1300 PSI

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1989 DOME DRILLING CO 431.00 0.00 48
1990 DOME DRILLING CO 4881.00 0.00 365
1991 DOME DRILLING CO 3240.00 0.00 365
1992 DOME DRILLING CO 2770.00 0.00 365
1993 DOME DRILLING CO 3092.00 0.00 365
1994 DOME DRILLING CO 2023.00 0.00 365
1995 DOME DRILLING CO 1374.00 0.00 365
1996 DOME DRILLING CO 2238.00 0.00 365
1997 DOME DRILLING CO 1967.00 0.00 365
1998 DOME DRILLING CO 1833.00 0.00 365
1999 DOME DRILLING CO 1205.00 0.00 365
2000 DOME DRILLING CO 1397.00 0.00 365
2001 DOME DRILLING CO 1405.00 0.00 365
2002 DOME DRILLING CO 1252.00 0.00 365
2003 DOME DRILLING CO 896.00 0.00 365
2004 DOME DRILLING CO 1049.00 0.00 365
2005 DOME DRILLING CO 939.00 0.00 365
2006 DOME DRILLING CO 643.00 0.00 365
2007 DOME DRILLING CO 771.00 0.00 365
2008 DOME DRILLING CO 738.00 0.00 365
2009 DOME DRILLING CO 432.00 0.00 365
2010 GREEN ENERGY INC 316.00 0.00 365
2011 GREEN ENERGY INC 282.00 5.00 189
2012 GREEN ENERGY INC 0.00 0.00 0
2013 GREEN ENERGY INC 0.00 0.00 0
2014 GREEN ENERGY INC 0.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1989 DOME DRILLING CO Brine 420 48
1990 DOME DRILLING CO Brine 0 365
1991 DOME DRILLING CO Brine 37 365
1992 DOME DRILLING CO Brine 20 365
1993 DOME DRILLING CO Brine 19 365
1994 DOME DRILLING CO Brine 20 365
1995 DOME DRILLING CO Brine 0 365
1996 DOME DRILLING CO Brine 0 365
1997 DOME DRILLING CO Brine 0 365
1998 DOME DRILLING CO Brine 0 365
1999 DOME DRILLING CO Brine 0 365
2000 DOME DRILLING CO Brine 0 365
2001 DOME DRILLING CO Brine 0 365
2002 DOME DRILLING CO Brine 0 365
2003 DOME DRILLING CO Brine 0 365
2004 DOME DRILLING CO Brine 0 365
2005 DOME DRILLING CO Brine 0 365
2006 DOME DRILLING CO Brine 0 365
2007 DOME DRILLING CO Brine 0 365
2008 DOME DRILLING CO Brine 0 365
2009 DOME DRILLING CO Brine 0 365
2010 GREEN ENERGY INC Brine 0 365
2011 GREEN ENERGY INC Brine 150 189
2012 GREEN ENERGY INC Brine 0 0
2013 GREEN ENERGY INC Brine 0 0
2014 GREEN ENERGY INC Brine 45 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1979262090 2017-6-14 0:00: FR No Violations
000PL13315 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0123667051 2014-09-29 Plug / Plug Back No Violations Arrived on location on 09/29/2014 to witness plugging operations. Waited on Medina Supply grout truck to arrive. Rigged up Medina Supply, then filled casing to surface with 9-sack grout.
0652252896 2014-07-17 Production Wells Violations Noted Inspected production well on 07/17/2014. The tank battery consists of 1-100 bbl steel tank, 1-horizontal separator, and 1-underground brine vault within an earthen dike. The diked area is located within a locked metal fence. The tank battery is used by multiple wells (2); well identification is clearly displayed for all wells utilizing it. The well is equipped with a wellhead with a large gate valve and swedge. No well identification is posted at the wellhead as required. The well did not appear to be hooked-up at the time of the inspection. Research into the production history of the well showed that it has not produced since 2011. If the well is not being produced, it must be plugged.
1056990517 2014-09-25 Plug / Plug Back No Violations Arrived on location on 09/25/2014 to witness plugging operations. Hagan Well Service was already rigged up and on locations. Waited on Omega Cementing Services to arrive. Set bottom plug through tubing just above the bottom bridge plug. Tripped out tubing and rigged up to rip pipe. Ripped pipe at 1,930. Tripped out 7 joints, established circulation, and set Big Lime/Oriskany plug. Pulled 29 joints, established circulations, and set plug at bottom of the surface casing. Shut down for the day. Will return tomorrow, tag cement, then set bridge plug on top.
1122039535 2011-07-11 Plug / Plug Back No Violations Bridge plug set to produce the Oriskany.
123667051 2014-9-29 0:00: PB No Violations
1916758098 2014-09-26 Plug / Plug Back No Violations Arrived on location on 09/26/2014 to witness continuining plugging operations. Waited on Timco to arrive to set plug. Rigged up Timco. Attempted to run in hole to ensure a free hole, but the tools hung up in the wellhead. Dug out around the wellhead and cut it off. Ran in hole with Timcos gauge tool. Tagged cement at 280. Set bridge plug at 278. Plan forward is to shut down for the weekend the finish plugging the well to surface with 9-sack grout.
1979262090 2017-06-14 Final Restoration No Violations Meets the final restoration Requirements.
652252896 2014-7-17 0:00: PW No Violations
PL13315 PL No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0652252896 US-OH-127382 2014-08-04 Failure to legibly identify well
0652252896 US-OH-127383 2014-08-04 Well shall be plugged

For data sources see[9]

References