If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-093-21545 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.34,"lon":-81.89,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Lorain | |
Municipality: Columbia Township | |
Operator Name: GENESIS RESOURCES LLC | |
Well Pad ID: | |
Farm/Lease Name: RIVERSIDE GOLF ASSOCIATION | |
License Status: Producing | |
License Date: 2009-08-07 | |
Spud Date: 2009-08-21 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2009-08-25 | |
Well Total Depth: 2871.00 ft | |
Configuration: Vertical | |
Latitude: 41.340000 | |
Longitude: -81.890000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-08-07 | Proposed Formations:CLINTON, Issued Date:8/7/2009, Expired Date:8/7/2010 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2009-08-25 | |
Change of Owner | 2009-12-29 | Operator changed from 507, DOME DRILLING CO to 1453, GREEN ENERGY INC |
Completion Report Received | 2010-01-14 | |
Construction Permit Expires | 2010-08-07 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-01-22 | 2725 | 2770 | 23 |
2725 | 2770 | 23 | |
2725 | 2770 | 23 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 3600 Bbl | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | GREEN ENERGY INC | 6419.00 | 140.00 | 365 |
2011 | GREEN ENERGY INC | 5756.00 | 142.00 | 365 |
2012 | GREEN ENERGY INC | 4274.00 | 52.00 | 366 |
2013 | GREEN ENERGY INC | 3874.00 | 18.00 | 365 |
2014 | GREEN ENERGY INC | 3336.00 | 31.00 | 365 |
2015 | GREEN ENERGY INC | 2639.00 | 28.00 | 365 |
2016 | GREEN ENERGY INC | 2088.00 | 0.00 | 365 |
2017 | GREEN ENERGY INC | 1847.00 | 33.00 | 365 |
2018 | GREEN ENERGY INC | 2082.00 | 26.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | GREEN ENERGY INC | Brine | 138 | 365 |
2011 | GREEN ENERGY INC | Brine | 70 | 365 |
2012 | GREEN ENERGY INC | Brine | 0 | 366 |
2013 | GREEN ENERGY INC | Brine | 35 | 365 |
2014 | GREEN ENERGY INC | Brine | 45 | 365 |
2015 | GREEN ENERGY INC | Brine | 17 | 365 |
2016 | GREEN ENERGY INC | Brine | 0 | 365 |
2017 | GREEN ENERGY INC | Brine | 0 | 365 |
2018 | GREEN ENERGY INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1001883448 | 2010-8-5 0:00:0 | UP | No Violations | 1.00 |
-1285419978 | 2010-1-5 0:00:0 | PW | No Violations | 1.00 |
-1628446585 | 2009-9-9 0:00:0 | PW | No Violations | 1.00 |
-1977327239 | 2014-7-15 0:00: | PW | No Violations | |
-2057484116 | 2009-8-20 0:00: | DD | No Violations | 1.00 |
-533245153 | 2010-4-20 0:00: | PL | No Violations | 1.00 |
0533245153 | 2010-04-20 | Preliminary Restoration | No Violations | Restoration approved. Well in production and equipped with pump jack. 2-100 barrel tanks and separator in battery. Fences installed around well and tank battery. Cloudy, 60 degrees. |
1001883448 | 2010-08-05 | UrbanProduction Wells | No Violations | Well in production and equipped with pump jack. 2-100 barrel tanks and separator in battery. Sun, 80 degrees. |
1252066944 | 2009-09-03 | Preliminary Restoration | No Violations | Solidify drilling pits. Pumped fluid mixed Kiln dust. Sun, 70 degrees. |
1285419978 | 2010-01-05 | Production Wells | No Violations | Well is in production. HB 271. Fences are up and around tank battery and well. Pressure relief valves installed on 2- 100 barrel tanks in battery. 10 snow on ground. Unable to pass restoration. |
1303317089 | 2011-04-20 | UrbanProduction Wells | No Violations | Well is in production and no violations. Fences are installed and locked. Rain, 50 degrees. |
1628446585 | 2009-09-09 | Production Wells | No Violations | Inspected drilling pits. Due to heavy rains Jim Gessel will pump off rain water and add 1 dump truck load of kiln dust before closing pits. Frac is scheduled 9-14-2009. |
1977327239 | 2014-07-15 | Production Wells | No Violations | Inspected production well on 07/15/2014. The tank battery consists of 2-100 bbl steel tanks and 1-horizontal separator within an earthen dike. The diked area is located within a locked metal fence. Well identification is clearly displayed at the tank battery. The well is equipped with a pump jack with a gas-powered motor located within a locked metal fence. No problems were noted at the time of the inspection. |
2057484116 | 2009-08-20 | Drill / Deepen / Reopen | No Violations | preparing location for drilling rig. Poulson Drilling is contractor. Top soil is stockpiled south side of location. Tank battery is constucted. No tanks installed. Lease road is constructed according to pre-site meeting. Sun, 80 degrees. |
2105818501 | 2009-08-27 | Production Wells | No Violations | New well drilled in Urban area. Annular pressure exceeded minimum of 90 psi. Advised Dome Drilling Co. to open annular valve until well is put in production. Pop off valve was releasing gas at 91 psi. No odor or visible gas coming from annulus. Sound of gas bubbling thru water present. Safety fence installed around well and drilling pits. No smoking and no trespassing signs posted. Cloudy, 70 degrees. |
For data sources see[9]