If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-23112 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.44,"lon":-80.92,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Mesopotamia Township | |
Operator Name: NORTHWOOD ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: ARNOLD UNIT | |
License Status: Producing | |
License Date: 1987-09-24 | |
Spud Date: 1988-06-20 | |
Spud Drilling Contractor: CUBBY DRLG | |
Final Drill Date: 1988-06-25 | |
Well Total Depth: 3960.00 ft | |
Configuration: Vertical | |
Latitude: 41.440000 | |
Longitude: -80.920000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1987-09-24 | 2816 P & S ENERGY INC GeoDate 9/24/87 |
Oil and Gas | 1987-09-24 | Issued Date 9/24/87 Expired Date 9/23/88 Acres 0020000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 03960 Proposed Drill Depth 03960 |
Original Spud | 1988-06-21 | |
Completed | 1988-06-25 | |
Reached Total Depth | 1988-06-25 | |
Completion Report Received | 1988-07-07 | |
Construction Permit Expires | 1988-09-23 | |
Change of Owner | 2002-10-03 | Operator changed from 2816, P & S ENERGY INC to 1634, NORTHWOOD ENERGY CORP |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 3704 | 3824 | 0 |
3704 | 3824 | 0 | |
2006-09-11 | 3732 | 3883 | 19 |
3732 | 3883 | 19 | |
3704 | 3824 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
N2 | 0 | 125 Mscf | 0 | 51.6 BPM @ 2173# 12 HR. SI 1040# | ||
H2O | 0 | 70220 Gal | 50000 | FRAC:WATER/SAND/NITROGEN |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1989 | P & S ENERGY INC | 20069.00 | 433.00 | 365 |
1990 | P & S ENERGY INC | 6988.00 | 230.00 | 365 |
1991 | P & S ENERGY INC | 2345.00 | 107.00 | 365 |
1992 | P & S ENERGY INC | 3041.00 | 147.00 | 365 |
1993 | P & S ENERGY INC | 3029.00 | 151.00 | 365 |
1994 | P & S ENERGY INC | 2084.00 | 101.00 | 365 |
1995 | P & S ENERGY INC | 1780.00 | 104.00 | 358 |
1996 | P & S ENERGY INC | 1163.00 | 116.00 | 365 |
1997 | P & S ENERGY INC | 978.00 | 44.00 | 365 |
1998 | P & S ENERGY INC | 668.00 | 40.00 | 365 |
1999 | P & S ENERGY INC | 1110.00 | 39.00 | 365 |
2000 | P & S ENERGY INC | 276.00 | 25.00 | 63 |
2001 | P & S ENERGY INC | 0.00 | 0.00 | 0 |
2002 | P & S ENERGY INC | 30.00 | 0.00 | 60 |
2004 | NORTHWOOD ENERGY CORP | 534.00 | 57.00 | 365 |
2005 | NORTHWOOD ENERGY CORP | 292.00 | 117.00 | 365 |
2006 | NORTHWOOD ENERGY CORP | 290.00 | 74.00 | 365 |
2007 | NORTHWOOD ENERGY CORP | 215.00 | 106.00 | 365 |
2008 | NORTHWOOD ENERGY CORP | 273.00 | 148.00 | 365 |
2009 | NORTHWOOD ENERGY CORP | 576.00 | 91.00 | 365 |
2010 | NORTHWOOD ENERGY CORP | 1186.00 | 86.00 | 365 |
2011 | NORTHWOOD ENERGY CORP | 1255.00 | 71.00 | 0 |
2012 | NORTHWOOD ENERGY CORP | 951.00 | 87.00 | 366 |
2013 | NORTHWOOD ENERGY CORP | 790.00 | 53.00 | 365 |
2014 | NORTHWOOD ENERGY CORP | 664.00 | 58.00 | 365 |
2015 | NORTHWOOD ENERGY CORP | 359.00 | 55.00 | 365 |
2016 | NORTHWOOD ENERGY CORP | 485.00 | 50.00 | 365 |
2017 | NORTHWOOD ENERGY CORP | 209.00 | 53.00 | 365 |
2018 | NORTHWOOD ENERGY CORP | 320.00 | 62.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1989 | P & S ENERGY INC | Brine | 511 | 365 |
1990 | P & S ENERGY INC | Brine | 297 | 365 |
1991 | P & S ENERGY INC | Brine | 105 | 365 |
1992 | P & S ENERGY INC | Brine | 191 | 365 |
1993 | P & S ENERGY INC | Brine | 208 | 365 |
1994 | P & S ENERGY INC | Brine | 140 | 365 |
1995 | P & S ENERGY INC | Brine | 72 | 358 |
1996 | P & S ENERGY INC | Brine | 70 | 365 |
1997 | P & S ENERGY INC | Brine | 36 | 365 |
1998 | P & S ENERGY INC | Brine | 99 | 365 |
1999 | P & S ENERGY INC | Brine | 37 | 365 |
2000 | P & S ENERGY INC | Brine | 0 | 63 |
2001 | P & S ENERGY INC | Brine | 0 | 0 |
2002 | P & S ENERGY INC | Brine | 0 | 60 |
2004 | NORTHWOOD ENERGY CORP | Brine | 0 | 365 |
2005 | NORTHWOOD ENERGY CORP | Brine | 47 | 365 |
2006 | NORTHWOOD ENERGY CORP | Brine | 363 | 365 |
2007 | NORTHWOOD ENERGY CORP | Brine | 65 | 365 |
2008 | NORTHWOOD ENERGY CORP | Brine | 153 | 365 |
2009 | NORTHWOOD ENERGY CORP | Brine | 181 | 365 |
2010 | NORTHWOOD ENERGY CORP | Brine | 150 | 365 |
2011 | NORTHWOOD ENERGY CORP | Brine | 175 | |
2012 | NORTHWOOD ENERGY CORP | Brine | 140 | 366 |
2013 | NORTHWOOD ENERGY CORP | Brine | 128 | 365 |
2014 | NORTHWOOD ENERGY CORP | Brine | 106 | 365 |
2015 | NORTHWOOD ENERGY CORP | Brine | 117 | 365 |
2016 | NORTHWOOD ENERGY CORP | Brine | 78 | 365 |
2017 | NORTHWOOD ENERGY CORP | Brine | 73 | 365 |
2018 | NORTHWOOD ENERGY CORP | Brine | 137 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-639195768 | 2006-9-27 0:00: | PW | No Violations | |
0000PL3324 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0639195768 | 2006-09-27 | Production Wells | No Violations | no violations . |
1220153962 | 2015-05-13 | Production Wells | No Violations | I was on location for a status check. During my inspection, I found the well in production. The well is equipped with a pumpjack. The tank battery consisted of a 210 barrel production tank, a 100 barrel brine tank and a mechanical separator. A dike surrounds the tank battery. Identification signs are posted at the well and tank battery. The lease road is in stable condition. Tank battery is shared with permit numbers 2-3113, 2-3111, 2-3214. |
PL3324 | PL | No Violations |
For data sources see[9]