Well Details

Well ID: 34-127-23589
Loading map...
Country: United States
State: Ohio
County: Perry
Municipality: Harrison Township
Operator Name: SMITH RONALD DBA CHIPCO
Well Pad ID:
Farm/Lease Name: GIBSON RALPH E
License Status: Final Restoration
License Date: 2014-04-04
Spud Date: 1975-03-06
Spud Drilling Contractor:
Final Drill Date: 1975-04-24
Well Total Depth: 3650.00 ft
Configuration: Vertical
Latitude: 39.790000
Longitude: -82.110000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1975-02-03 435 HARDIN HANLEY E GeoDate 2/3/75
Original Spud 1975-03-06 NONE RPT.
Completed 1975-04-24 NONE RPT.
Reached Total Depth 1975-04-24 NONE RPT.
Change of Owner 2014-03-03 Operator changed from 435, HARDIN HANLEY E to 7640, SMITH RONALD DBA CHIPCO
APP 2014-04-04 Proposed Formations:CLINTON, Issued Date:4/4/2014, Expired Date:4/3/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2014-11-06 NONE RPT.
Construction Permit Expires 2016-04-03 NONE RPT.
Record Last Modified 2017-02-10 NONE RPT.

For data sources see[2]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1991 HARDIN HANLEY E 401.00 306.00 365
1992 HARDIN HANLEY E 296.00 101.00 365
1993 HARDIN HANLEY E 141.00 109.00 365
1994 HARDIN HANLEY E 309.00 141.00 365
1995 HARDIN HANLEY E 290.00 122.00 365
2014 SMITH RONALD DBA CHIPCO 0.00 0.00 0

For data sources see[3] [4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1991 HARDIN HANLEY E Brine 0 365
1992 HARDIN HANLEY E Brine 0 365
1993 HARDIN HANLEY E Brine 0 365
1994 HARDIN HANLEY E Brine 0 365
1995 HARDIN HANLEY E Brine 0 365
2014 SMITH RONALD DBA CHIPCO Brine 0 0

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1276170268 2014-11-6 0:00: PB No Violations
-1683462751 2014-11-3 0:00: PB No Violations
-1729719764 2014-11-4 0:00: PB No Violations 3.00
-187353018 2014-11-5 0:00: PB No Violations 3.00
-586654465 2014-10-8 0:00: PW No Violations 1.00
0187353018 2014-11-05 Plug / Plug Back No Violations I was onsite today when Chipco was trying to rip the 8. We found free pipe at 218ft. They were able to rip the pipe at 218ft. The rig crew worked on pulling the 8 from the well the rest of the afternoon. We will run tubing back in the well and set 2 plugs tomorrow.
0268786126 2014-03-04 Production Wells No Violations I talked with Chip Smith to see if the form 7 has been done yet to transfer this well into his name. He told me he had met with Hanley and had him sign the form. He said that the paperwork has been sent in and he is waiting on the permit so he can plug the well.
0487635465 2013-12-12 Production Wells No Violations I checked on this well with Doug Smith from Chipco LLC to see where it was at. Chipco is planning on taking this well over to plug from the owner. We double checked with the landowner to make sure the well was not given to him from Hanley Hardin. He informed us that Hanley still owned the well. I believe Chipco is going to work out a deal with Hanley to take this well over.
0586654465 2014-10-08 Production Wells No Violations I met with Chip Smith today to show him this well. He plans on moving a rig in on it to plug the well within the next few weeks.
0984118690 2015-10-06 Final Restoration No Violations The final restoration meets 1509.072B.
1276170268 2014-11-06 Plug / Plug Back No Violations The rig crew finished pulling out the 8 this morning and ran the 1.5 tubing back in the well to set the bottom of the surface plug. They then pulled the tubing up to set the surface plug. While we were pumping cement we lost circulation and didnt get any returns. We shut down for an hour to see where the cement was. We tagged the cement just below the 8 so we ran a 9 pre-cast plug down to 218ft where the pipe was ripped then filled the hole with cement. The well will be left open over night to make sure it does not settle.
1683462751 2014-11-03 Plug / Plug Back No Violations Chipco has moved there plugging rig in on this well to plug it. They have pulled out the rods and 2 tubing from the well and are running 1.5 tubing back in the well to set the bottom plug. Chipco set the bottom plug with 30sks of Class A Cement. The tubing will be pulled back out of the well and the rig crew will set up to rip the 4.5 tomorrow.
1729719764 2014-11-04 Plug / Plug Back No Violations Chipco was onsite today to plug this well. They were able to rip the 4 at 2608ft. They pulled out 59ft to make sure the pipe was free then we set the Lime plug through the 4 casing. The pipe was then pulled up to the Berea to set the Berea plug. Chipco will pull out the rest of the 4 so they can work on recovering the 8 casing.
268786126 2014-3-4 0:00:0 PW No Violations 1.00
487635465 2013-12-12 0:00 PW No Violations 1.00
984118690 2015-10-6 0:00: FR No Violations 1.00

For data sources see[7]