If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-23506 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.25,"lon":-80.81,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: | |
Farm/Lease Name: KNOX | |
License Status: Producing | |
License Date: 1992-12-14 | |
Spud Date: 1992-12-22 | |
Spud Drilling Contractor: CUBBY DRLG | |
Final Drill Date: 1992-12-27 | |
Well Total Depth: 4629.00 ft | |
Configuration: Vertical | |
Latitude: 41.250000 | |
Longitude: -80.810000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1992-12-14 | 2816 P & S ENERGY INC GeoDate 12/14/92 |
Oil and Gas | 1992-12-14 | Issued Date 12/14/92 Expired Date 12/14/93 Acres 0049660 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04629 Proposed Drill Depth 04629 |
Original Spud | 1992-12-22 | |
Completed | 1992-12-27 | |
Reached Total Depth | 1992-12-27 | |
Completion Report Received | 1993-01-19 | |
Construction Permit Expires | 1993-12-14 | |
Change of Owner | 2019-02-26 | Operator changed from 2816, P & S ENERGY INC to 9722, PIN OAK ENERGY PARTNERS LLC |
Record Last Modified | 2019-02-26 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4348 | 4479 | 0 |
4348 | 4479 | 0 | |
2006-09-11 | 4384 | 4478 | 25 |
4384 | 4478 | 25 | |
4348 | 4479 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 81000 Gal | 80000 | FRAC W/81M GAL H20 & 800 SX SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1992 | P & S ENERGY INC | 0.00 | 0.00 | 365 |
1993 | P & S ENERGY INC | 84330.00 | 496.00 | 257 |
1994 | P & S ENERGY INC | 71536.00 | 101.00 | 330 |
1995 | P & S ENERGY INC | 51433.00 | 0.00 | 365 |
1996 | P & S ENERGY INC | 47508.00 | 80.00 | 365 |
1997 | P & S ENERGY INC | 40867.00 | 0.00 | 365 |
1998 | P & S ENERGY INC | 31020.00 | 0.00 | 365 |
1999 | P & S ENERGY INC | 28646.00 | 61.00 | 365 |
2000 | P & S ENERGY INC | 24596.00 | 0.00 | 344 |
2001 | P & S ENERGY INC | 19785.00 | 0.00 | 365 |
2002 | P & S ENERGY INC | 18971.00 | 33.00 | 365 |
2003 | P & S ENERGY INC | 14795.00 | 0.00 | 365 |
2004 | P & S ENERGY INC | 17338.00 | 0.00 | 365 |
2005 | P & S ENERGY INC | 16454.00 | 0.00 | 365 |
2006 | P & S ENERGY INC | 15886.00 | 24.00 | 365 |
2007 | P & S ENERGY INC | 15585.00 | 0.00 | 365 |
2008 | P & S ENERGY INC | 14992.00 | 0.00 | 365 |
2009 | P & S ENERGY INC | 11185.00 | 0.00 | 365 |
2010 | P & S ENERGY INC | 12274.00 | 0.00 | 365 |
2011 | P & S ENERGY INC | 11364.00 | 0.00 | 365 |
2012 | P & S ENERGY INC | 11134.00 | 0.00 | 366 |
2013 | P & S ENERGY INC | 10299.00 | 0.00 | 365 |
2014 | P & S ENERGY INC | 8659.00 | 0.00 | 365 |
2015 | P & S ENERGY INC | 8168.00 | 0.00 | 365 |
2016 | P & S ENERGY INC | 9202.00 | 0.00 | 365 |
2017 | P & S ENERGY INC | 7983.00 | 0.00 | 365 |
2018 | P & S ENERGY INC | 7676.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1992 | P & S ENERGY INC | Brine | 320 | 365 |
1993 | P & S ENERGY INC | Brine | 2845 | 257 |
1994 | P & S ENERGY INC | Brine | 65 | 330 |
1995 | P & S ENERGY INC | Brine | 0 | 365 |
1996 | P & S ENERGY INC | Brine | 0 | 365 |
1997 | P & S ENERGY INC | Brine | 0 | 365 |
1998 | P & S ENERGY INC | Brine | 20 | 365 |
1999 | P & S ENERGY INC | Brine | 0 | 365 |
2000 | P & S ENERGY INC | Brine | 0 | 344 |
2001 | P & S ENERGY INC | Brine | 0 | 365 |
2002 | P & S ENERGY INC | Brine | 70 | 365 |
2003 | P & S ENERGY INC | Brine | 0 | 365 |
2004 | P & S ENERGY INC | Brine | 0 | 365 |
2005 | P & S ENERGY INC | Brine | 0 | 365 |
2006 | P & S ENERGY INC | Brine | 70 | 365 |
2007 | P & S ENERGY INC | Brine | 0 | 365 |
2008 | P & S ENERGY INC | Brine | 0 | 365 |
2009 | P & S ENERGY INC | Brine | 0 | 365 |
2010 | P & S ENERGY INC | Brine | 0 | 365 |
2011 | P & S ENERGY INC | Brine | 0 | 365 |
2012 | P & S ENERGY INC | Brine | 70 | 366 |
2013 | P & S ENERGY INC | Brine | 0 | 365 |
2014 | P & S ENERGY INC | Brine | 0 | 365 |
2015 | P & S ENERGY INC | Brine | 0 | 365 |
2016 | P & S ENERGY INC | Brine | 43 | 365 |
2017 | P & S ENERGY INC | Brine | 0 | 365 |
2018 | P & S ENERGY INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-301061570 | 2017-5-25 0:00: | UP | No Violations | 0.50 |
-593103905 | 2014-3-27 0:00: | UP | No Violations | 0.50 |
0000020525 | Preliminary Restoration | No Violations | PASSED Y WITNESSED 6/16/93 INSPECTOR KEITH WHITE DATE 06/1619/93 DATA FROM OLD VAX INFO | |
0301061570 | 2017-05-25 | UrbanProduction Wells | No Violations
-up lines are secure with plugs. Identification signs are posted on the storage tank and separator. The production equipment and access road are in good repair. The equipment on site:
| |
0593103905 | 2014-03-27 | UrbanProduction Wells | No Violations | My inspection found the well in production. The well was equipped with a plunger lift unit. The tank battery consisted of a 210 barrel production tank and a separator. The dike was weathered and not capable of meeting containment requirements. An identification sign was properly posted on the tank. A bull plug was installed on the load line. The lease road was the parking lot of the scrap yard. The well was placed into production prior to House Bill 278. I contacted the well tender at 330-502-6736. I left a message instructing the well tender to build a new dike around the tank battery and that I would re-inspect by 4/28/14. |
0735195866 | 2014-06-03 | UrbanProduction Wells | No Violations | I was on location for a follow-up inspection. I found during my inspection a new dike built per my request. |
20525 | PL | No Violations | ||
735195866 | 2014-6-3 0:00:0 | UP | No Violations | 0.30 |
For data sources see[9]