If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-23568 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.21,"lon":-80.78,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Howland Township | |
Operator Name: EVERFLOW EASTERN PARTNERS LP | |
Well Pad ID: | |
Farm/Lease Name: DENNIS UNIT | |
License Status: Producing | |
License Date: 1994-05-17 | |
Spud Date: 1994-07-07 | |
Spud Drilling Contractor: J & J DIRECTIONAL SERVICE | |
Final Drill Date: 1994-07-15 | |
Well Total Depth: 5256.00 ft | |
Configuration: Directional | |
Latitude: 41.210000 | |
Longitude: -80.780000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1994-05-17 | 84 EVERFLOW EASTERN PTNS L P GeoDate 5/17/94 |
Oil and Gas | 1994-05-17 | Issued Date 5/17/94 Expired Date 5/17/95 Acres 0044070 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05256 Proposed Drill Depth 05256 |
Original Spud | 1994-07-07 | CHG TGT/XY 7-29-95 |
Completed | 1994-07-15 | CHG TGT/XY 7-29-95 |
Reached Total Depth | 1994-07-15 | CHG TGT/XY 7-29-95 |
Completion Report Received | 1994-08-08 | CHG TGT/XY 7-29-95 |
Construction Permit Expires | 1995-05-17 | CHG TGT/XY 7-29-95 |
Record Last Modified | 2017-02-15 | CHG TGT/XY 7-29-95 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4929 | 5056 | 0 |
4929 | 5056 | 0 | |
2006-09-11 | 4976 | 5029 | 63 |
4976 | 5029 | 63 | |
4929 | 5056 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 120200 Gal | 80000 | FRAC W/120,200 GAL H20 & 80M# SAND |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1850881834 | 2013-2-5 0:00:0 | UP | No Violations | 0.50 |
1455834334 | 2004-03-11 | Preliminary Restoration | No Violations | Restoration approved . |
1850881834 | 2013-02-05 | UrbanProduction Wells | No Violations | My inspection found the well equipped with a plunger lift unit. It was surrounded by a locked chain link fence and the proper identification sign was posted. The tank battery contained one, 100 barrel production tank, one, 50 barrel brine tank, and a separator. It was surrounded by a locked chain link fence and the proper identification was posted. The proper dike was in place. There was a lock and plug on the load line. The lease road was in good condition. The production records were up to date on our database. This well was placed into production prior to House Bill 278. |
2065643875 | 2015-11-10 | UrbanProduction Wells | No Violations | I was on location for a status check. During my inspection, I found the well in production. The well is equipped with a plunger lift assembly. The tank battery consists of a 100 barrel production tank, a 50 barrel brine tank, and a mechanical separator. There is a dike around the tank battery. Identification signs were posted at the well and tank battery. There are locked, chain link fences around the tank battery and well. A plug is installed on the load line. The lease road is in stable condition. The well was placed into production prior to House Bill 278. |
797437908 | 2019-12-11 0:00 | UP | No Violations |
For data sources see[9]