If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-23587 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.25,"lon":-80.8,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: EVERFLOW EASTERN PARTNERS LP | |
Well Pad ID: | |
Farm/Lease Name: CONCORD STEEL UNIT | |
License Status: Producing | |
License Date: 1995-06-09 | |
Spud Date: 1995-06-12 | |
Spud Drilling Contractor: CUBBY DRLG | |
Final Drill Date: 1995-06-20 | |
Well Total Depth: 5095.00 ft | |
Configuration: Directional | |
Latitude: 41.250000 | |
Longitude: -80.800000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1995-06-09 | 84 EVERFLOW EASTERN PTNS L P GeoDate 6/9/95 |
Oil and Gas | 1995-06-09 | Issued Date 6/9/95 Expired Date 6/8/96 Acres 0044930 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05095 Proposed Drill Depth 05095 |
Original Spud | 1995-06-12 | CORR FTG/ XY/ACRES 12-16-95 |
Completed | 1995-06-20 | CORR FTG/ XY/ACRES 12-16-95 |
Reached Total Depth | 1995-06-20 | CORR FTG/ XY/ACRES 12-16-95 |
Completion Report Received | 1995-08-21 | CORR FTG/ XY/ACRES 12-16-95 |
Construction Permit Expires | 1996-06-08 | CORR FTG/ XY/ACRES 12-16-95 |
Record Last Modified | 2017-02-15 | CORR FTG/ XY/ACRES 12-16-95 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 4792 | 4892 | 97 |
4793 | 4917 | 0 | |
1997-06-29 | 4793 | 4917 | 0 |
4792 | 4892 | 97 | |
4792 | 4892 | 97 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 123000 Gal | 100000 | FRAC W/123M GAL WATER & 100M# SAND |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0188512194 | 2004-02-24 | Preliminary Restoration | No Violations | Restoration approved . |
0964292970 | 2014-03-27 | UrbanProduction Wells | No Violations | My inspection found the well in production. The well was equipped with a plunger lift unit. The tank battery consisted of four, 100 barrel production tanks, a 75 barrel brine tank and four separators. The dike was slightly weathered; however, it meets containment requirements. Identification signs were posted on the fence at the tank battery and the well. Locked, chain link fences with barb wire surrounded the production equipment and well. There were bull plugs on all of the load lines. There was a 7 day production chart at the separator. The lease road was the factories paved driveway. The tank battery location was shared with permit numbers 2-3572, 2-3607, 2-3492. The well was placed into production prior to House Bill 278. |
1109311031 | 2016-11-28 | UrbanProduction Wells | No Violations
-3492, 2-3572 and 2-3607. The equipment on the site consists of the following:
| |
188512194 | 2004-2-24 0:00: | PL | No Violations | |
964292970 | 2014-3-27 0:00: | UP | No Violations | 0.70 |
For data sources see[9]