If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-115-24674 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.65,"lon":-82.02,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Morgan | |
Municipality: Deerfield Township | |
Operator Name: ARTEX OIL COMPANY | |
Well Pad ID: | |
Farm/Lease Name: SIGMAN VINCENT | |
License Status: Producing | |
License Date: 2013-03-14 | |
Spud Date: 2013-06-18 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2013-07-02 | |
Well Total Depth: 6315.00 ft | |
Configuration: Vertical | |
Latitude: 39.650000 | |
Longitude: -82.020000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-03-14 | Proposed Formations:KNOX, Issued Date:3/14/2013, Expired Date:3/14/2015 12:00:00 PM, Drilling unit acres:45, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-07-02 | GMM UPDTED FIST PRODCUTION DATE TO 6/27/2014 PER FORM 6A. |
Completion Report Received | 2014-09-26 | GMM UPDTED FIST PRODCUTION DATE TO 6/27/2014 PER FORM 6A. |
Construction Permit Expires | 2015-03-14 | GMM UPDTED FIST PRODCUTION DATE TO 6/27/2014 PER FORM 6A. |
Record Last Modified | 2017-10-23 | GMM UPDTED FIST PRODCUTION DATE TO 6/27/2014 PER FORM 6A. |
For data sources see[2]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | ARTEX OIL COMPANY | 12025.00 | 0.00 | 365 |
2015 | ARTEX OIL COMPANY | 24816.00 | 43.00 | 365 |
2016 | ARTEX OIL COMPANY | 19518.00 | 52.00 | 365 |
2017 | ARTEX OIL COMPANY | 13746.00 | 27.00 | 365 |
2018 | ARTEX OIL COMPANY | 11972.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | ARTEX OIL COMPANY | Brine | 2769 | 365 |
2015 | ARTEX OIL COMPANY | Brine | 4705 | 365 |
2016 | ARTEX OIL COMPANY | Brine | 4514 | 365 |
2017 | ARTEX OIL COMPANY | Brine | 4391 | 365 |
2018 | ARTEX OIL COMPANY | Brine | 4705 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-114623059 | 2013-7-12 0:00: | DD | No Violations | 0.50 |
-124301225 | 2013-6-19 0:00: | CS | No Violations | 3.50 |
-739029579 | 2013-10-30 0:00 | DD | No Violations | 0.50 |
0114623059 | 2013-07-12 | Drill / Deepen / Reopen | No Violations | I came to location to witness the perf job but they had completed job earlier than expected and were running tubing when I arrived on location. |
0124301225 | 2013-06-19 | Casing String Witnessed | No Violations | I was on location to witness the cementing of the surface casing by Formation Cement CO. Artex is using the Kilbarger Patterson #17 rig. The Kilbarger drilled a 12 1/4 hole to a TD of 739. The casing shoe depth was 687. Centralizers were not run on the surface casing and the baffle insert was at a depth of 645. The plug was down at 2:33pm with good cement returns. The baffle still had a flapper so they shut the well in and bled the pressure to zero therefore indicating there were no leaks or loss of cement. I will return tomorrow to witness the surface casing pressure test (500psi for 5 minutes) when they test the BOP. |
0188797369 | 2014-08-15 | Preliminary Restoration | No Violations | Site now correctly meets 1509.072 preliminary requirements. |
0739029579 | 2013-10-30 | Drill / Deepen / Reopen | No Violations | The location almost meets preliminary restoration requirements, however there is still some equipment on site and the well isnt completely hooked up to tanks and separator. The pits have been filled and the location has good vegetative growth. I will come back next month to see if they have completed restoration. |
1371522921 | 2013-06-17 | Casing String Witnessed | No Violations | I was on location to witness the cementing of the conductor casing by Formation Cement CO. Artex is using the Killbarger Patterson #17 rig. There was good returns on the cement job. |
1371733258 | 2013-06-20 | Drill / Deepen / Reopen | No Violations | I was on location to witness the integrity of the surface casing. Artex had hooked up a high pressure pump with a pressure gauge box to the casing head in order to test the annular at 300psi for 30 minutes. Test began at 10:10 AM with a psi of 320 and passed at 10:45 with 310psi. They will finish installing the choke line, trip in hole with 3.5 heavy weight drill pipe down to baffle, close off the annular, and then test the BOP. |
1373896507 | 2013-07-15 | Completion Testing | No Violations | I came to location to witness Producers perform an acid job on the Beekmantown formation for Artex. They were still treating the formation with acid when I left the location. |
1399995142 | 2014-05-13 | Drill / Deepen / Reopen | No Violations | The site does not yet meet preliminary restoration requirements of ORC 1509.072A. The wellhead area has been restored with grass however the area of the dike still needs work. The access road near the dike and separator is still being used to keep pipeline. The well is still shut in however operator has recently completed pipeline installation. |
1475702434 | 2013-06-17 | Administrative Inspection | No Violations | Heath, from Artex, called and stated they were moving the Killbarger Patterson 17 rig onto location sometime today to begin drilling the conductor hole. |
1710840498 | 2013-06-20 | Drill / Deepen / Reopen | No Violations | Witnessed Blow Out Preventer test. 590 psi was held on the annulus for the required time period with no loss in pressure. Also witnessed the grouting of the surface casing with 50 sacks of Class A cement. Cement top had fallen back roughly 20 after the surface job. Good returns were seen at the surface. |
188797369 | 2014-8-15 0:00: | PL | No Violations |
For data sources see[7]