X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-009-23813

Well Details

Well ID: 34-009-23813
Loading map...
Country: United States
State: Ohio
County: Athens
Municipality: Troy Township
Operator Name: BETHEL OIL AND GAS LLC
Well Pad ID:
Farm/Lease Name: RANDOLPH
License Status: Producing
License Date: 2011-09-20
Spud Date: 2011-10-24
Spud Drilling Contractor: CO TOOLS
Final Drill Date: 2012-02-10
Well Total Depth: 1868.00 ft
Configuration: Vertical
Latitude: 39.250000
Longitude: -81.780000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-09-20 Proposed Formations:BEREA -30 FT- GORDON, Issued Date:9/20/2011, Expired Date:9/19/2013 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2012-02-10
Completion Report Received 2012-08-01
Construction Permit Expires 2013-09-19
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2012-08-02 1828 1868 0
1828 1868 0
1828 1868 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-02-15 Not Treated 0 0 0 NATURAL BEREA GAS WELL

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2012 BETHEL OIL & GAS CO 2025.00 0.00 366
2013 BETHEL OIL & GAS CO 1311.00 0.00 365
2014 BETHEL OIL & GAS CO 743.00 0.00 365
2015 BETHEL OIL & GAS CO 1179.00 0.00 365
2016 BETHEL OIL & GAS CO 1014.00 0.00 365
2017 BETHEL OIL & GAS CO 1224.00 0.00 365
2018 BETHEL OIL & GAS CO 1316.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 BETHEL OIL & GAS CO Brine 296 366
2013 BETHEL OIL & GAS CO Brine 0 365
2014 BETHEL OIL & GAS CO Brine 0 365
2015 BETHEL OIL & GAS CO Brine 0 365
2016 BETHEL OIL & GAS CO Brine 0 365
2017 BETHEL OIL & GAS CO Brine 0 365
2018 BETHEL OIL & GAS CO Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1258390250 2011-12-2 0:00: AM No Violations 0.30
-1535406471 2012-2-14 0:00: DD No Violations 1.00
-1729065968 2012-9-27 0:00: PL No Violations 0.30
-447793531 2011-12-27 0:00 DD No Violations 0.50
-535400528 2012-2-3 0:00:0 DD No Violations 0.30
0252287808 2012-04-25 Preliminary Restoration No Violations Pits have been filled. Top soil needs to be placed and reseeded. Frac tanks remain on site.
0447793531 2011-12-27 Drill / Deepen / Reopen No Violations Currently down to 1165 feet. No violations.
0495346734 2012-06-19 Preliminary Restoration No Violations Pit closed and area has been graded off. Vegetative cover not yet established.
0503933549 2012-02-13 Administrative Inspection No Violations I spoke with Bob Lane of Bethel Oil & Gas. They are going to run the formation packer tomorrow.
0535400528 2012-02-03 Drill / Deepen / Reopen No Violations I spoke with Bob Lane who let me know they are drilling around 1750 feet.
1101497774 2011-10-14 Drill / Deepen / Reopen No Violations Drilling inspection. Not spudded yet but location built and rigged up.
1258390250 2011-12-02 Administrative Inspection No Violations Down to 425 now, currently shut down until 12/4/11. Once they begin drilling they will run around the clock until the get through the Red Rock and set the 8 intermediate string.
1318339223 2011-10-11 Drill / Deepen / Reopen No Violations Pad constructed but well not spudded. Pits not excavated yet.
1318882943 2011-10-17 Drill / Deepen / Reopen No Violations Drilling status check. They have not spudded yet, but plan to on Thursday (10/20/11).
1319120629 2011-10-20 Drill / Deepen / Reopen No Violations Dressing tools and laying gas line. Plan to spud at the beginning of next week.
1320847219 2011-11-09 Drill / Deepen / Reopen No Violations Drilling status inspection. Currently at 193, pit looks good.
1321480080 2011-11-16 Drill / Deepen / Reopen No Violations 283 feet of used 10 inch surface casing set into 283 feet of 13 inch borehole with 120 sacks of class A, 850 lb gel, 250 lb accelerator, 240 lb LCM, 2 qt polymer, with 100% excess. Circulation established, cement returns NOT seen at surface. Gel and LCM circulated, after displacement was pumped the fluid level stayed at surface. Will return in two days and find cement top then grout to surface.
1323189544 2011-11-23 Drill / Deepen / Reopen No Violations 21 bags Type 1 Portland cement grouted down backside of surface casing Friday 11/18/11, and another 10 bags used Monday 11/21/11 in order to bring cement to surface. 10 feet of cement was left inside the bottom of the surface casing. Currently drilling at 350 feet.
1323269855 2011-12-07 Drill / Deepen / Reopen No Violations Drilling around the clock now until they set the 8 intermediate string. Currently at 760 feet.
1324483116 2011-12-12 Drill / Deepen / Reopen No Violations Arrived after crew had left for the day. Pit looks good.
1325607232 2012-01-03 Drill / Deepen / Reopen No Violations The rig is drilling ahead at 1269. The drilling pit is in good repair.
1326916786 2012-01-18 Drill / Deepen / Reopen No Violations The rig is currently drilling at 1470. They plan to run 7 casing tomorrow (1/19/12).
1327676570 2012-01-27 Administrative Inspection No Violations I spoke with Bob Lane of Bethel Oil and Gas about the status of the drilling operations. They successfully ran 1457 of 7 intermediate casing. They are currently drilling ahead at approximately 1600.
1358936398 2011-11-18 Drill / Deepen / Reopen No Violations No water in hole, cement top at 23 feet below surface. Water vain was hit at 70 feet so roughly 50 feet of cement coverage. Tripping back in hole today to bail out water inside surface casing. Portland cement will be grouted down backside of surface casing to ensure 100% coverage on backside of casing.
1505835571 2011-12-21 Drill / Deepen / Reopen No Violations Drilling today and now at 1110 feet. Pit looks good and is holding water adequately.
1535406471 2012-02-14 Drill / Deepen / Reopen No Violations The 4 1/2 production string was set on a formation packer above the Berea. The bottom of the Big Injun Sand is 1415 and the 7 casing was run to a depth of 1457. The top of the Berea is at 1833. The well has a total depth of 1872.
1729065968 2012-09-27 Preliminary Restoration No Violations The pits have been filled, the grade has been restored, there is vegetative cover, there is no erosion at the site, there is no drilling equipment on site. Restoration pass.
2050189946 2011-10-28 Drill / Deepen / Reopen No Violations Drilling status check. Spud Monday 10/24/11, currently at 114 feet, 13 borehole. Pit liner secure, pit well constructed and large enough to hold Injun water.
252287808 2012-4-25 0:00: PL No Violations 0.50
495346734 2012-6-19 0:00: PL No Violations 1.30
503933549 2012-2-13 0:00: AM No Violations 0.30

For data sources see[9]

References