If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-099-22307 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.05,"lon":-80.69,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Boardman Township | |
Operator Name: EVERFLOW EASTERN PARTNERS LP | |
Well Pad ID: | |
Farm/Lease Name: LOCKWOOD METHODIST CHURCH UNIT | |
License Status: Producing | |
License Date: 1989-01-13 | |
Spud Date: 1989-01-23 | |
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]] | |
Final Drill Date: 1989-01-28 | |
Well Total Depth: 5493.00 ft | |
Configuration: Vertical | |
Latitude: 41.050000 | |
Longitude: -80.690000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1989-01-13 | Issued Date 1/13/89 Expired Date 1/13/90 Acres 0041077 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05493 Proposed Drill Depth 05493 |
Original Spud | 1989-01-23 | CHG. ACG. 3-25-89 |
Completed | 1989-01-28 | CHG. ACG. 3-25-89 |
Reached Total Depth | 1989-01-28 | CHG. ACG. 3-25-89 |
CO | 1989-02-17 | 84 EVERFLOW EASTERN PTNS L P GeoDate 1/13/89 |
Completion Report Received | 1989-03-02 | CHG. ACG. 3-25-89 |
Construction Permit Expires | 1990-01-13 | CHG. ACG. 3-25-89 |
Record Last Modified | 2017-02-15 | CHG. ACG. 3-25-89 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 5256 | 5362 | 50 |
5256 | 5362 | 50 | |
5256 | 5362 | 50 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 121000 Gal | 80000 | FRAC:SAND/WATER |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000010639 | Preliminary Restoration | No Violations | PASSED Y WITNESSED 5/12/92 INSPECTOR BRETT FARNSWORTH DATE 05/1219/92 DATA FROM OLD VAX INFO | |
000PL12520 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
10639 | PL | No Violations | ||
1987547306 | 2009-03-31 | Production Wells | No Violations | I performed a random field inspection. I GPSd both the wellhead and the tank battery for the first time. I continued my walk around both the tank battery and the wellhead and found both to be in good shape. Both ID signs were posted. There were no violations at this time. |
PL12520 | PL | No Violations |
For data sources see[9]