X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-099-22628

Well Details

Well ID: 34-099-22628
Loading map...
Country: United States
State: Ohio
County: Mahoning
Municipality: Boardman Township
Operator Name: EVERFLOW EASTERN PARTNERS LP
Well Pad ID:
Farm/Lease Name: MCC BOARDMAN
License Status: Producing
License Date: 1994-07-14
Spud Date: 1994-08-24
Spud Drilling Contractor: J & J DIRECTIONAL SERVICE
Final Drill Date: 1994-09-02
Well Total Depth: 6367.00 ft
Configuration: Directional
Latitude: 41.000000
Longitude: -80.690000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1994-07-14 84 EVERFLOW EASTERN PTNS L P GeoDate 7/14/94
Oil and Gas 1994-07-14 Issued Date 7/14/94 Expired Date 7/14/95 Acres 0041540 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 06367 Proposed Drill Depth 06367
Original Spud 1994-08-24 CHG TGT/XY 7-29-95
Completed 1994-09-02 CHG TGT/XY 7-29-95
Reached Total Depth 1994-09-02 CHG TGT/XY 7-29-95
Completion Report Received 1994-09-19 CHG TGT/XY 7-29-95
Construction Permit Expires 1995-07-14 CHG TGT/XY 7-29-95
Record Last Modified 2017-02-15 CHG TGT/XY 7-29-95

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 6188 6256 79
6188 6256 79
6188 6256 79

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 124000 Gal 80000 FRAC W/124M GAL & 80M# SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1996 EVERFLOW EASTERN PARTNERS LP 13019.00 78.00 365
1997 EVERFLOW EASTERN PARTNERS LP 9191.00 22.00 365
1998 EVERFLOW EASTERN PARTNERS LP 10186.00 24.00 365
2001 EVERFLOW EASTERN PARTNERS LP 9364.00 0.00 365
2002 EVERFLOW EASTERN PARTNERS LP 7498.00 24.00 365
2003 EVERFLOW EASTERN PARTNERS LP 7959.00 12.00 365
2004 EVERFLOW EASTERN PARTNERS LP 5098.00 0.00 365
2005 EVERFLOW EASTERN PARTNERS LP 4433.00 19.00 365
2006 EVERFLOW EASTERN PARTNERS LP 5002.00 11.00 365
2007 EVERFLOW EASTERN PARTNERS LP 2124.00 0.00 365
2008 EVERFLOW EASTERN PARTNERS LP 3498.00 0.00 365
2009 EVERFLOW EASTERN PARTNERS LP 3230.00 0.00 365
2010 EVERFLOW EASTERN PARTNERS LP 4294.00 0.00 365
2011 EVERFLOW EASTERN PARTNERS LP 2352.00 0.00 197
2012 EVERFLOW EASTERN PARTNERS LP 1527.00 0.00 126
2013 EVERFLOW EASTERN PARTNERS LP 5510.00 0.00 365
2014 EVERFLOW EASTERN PARTNERS LP 2480.00 8.00 245
2015 EVERFLOW EASTERN PARTNERS LP 304.00 0.00 365
2016 EVERFLOW EASTERN PARTNERS LP 254.00 0.00 365
2017 EVERFLOW EASTERN PARTNERS LP 2108.00 0.00 365
2018 EVERFLOW EASTERN PARTNERS LP 2206.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1996 EVERFLOW EASTERN PARTNERS LP Brine 40 365
1997 EVERFLOW EASTERN PARTNERS LP Brine 21 365
1998 EVERFLOW EASTERN PARTNERS LP Brine 11 365
2001 EVERFLOW EASTERN PARTNERS LP Brine 18 365
2002 EVERFLOW EASTERN PARTNERS LP Brine 18 365
2003 EVERFLOW EASTERN PARTNERS LP Brine 12 365
2004 EVERFLOW EASTERN PARTNERS LP Brine 12 365
2005 EVERFLOW EASTERN PARTNERS LP Brine 5 365
2006 EVERFLOW EASTERN PARTNERS LP Brine 13 365
2007 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2008 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2009 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2010 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2011 EVERFLOW EASTERN PARTNERS LP Brine 0 197
2012 EVERFLOW EASTERN PARTNERS LP Brine 0 126
2013 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2014 EVERFLOW EASTERN PARTNERS LP Brine 8 245
2015 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2016 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2017 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2018 EVERFLOW EASTERN PARTNERS LP Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-363434121 2004-5-26 0:00: PW No Violations 0.50
0363434121 2004-05-26 Production Wells No Violations The tank battery is shared with permits: 2472, 2591, 2587 and 2629 and consists of 1-210 bbl storage tank, 3-separators and a marginal dike.
1001596469 2009-06-22 Production Wells No Violations I walked around the tank battery and the wellhead and found that there were no violations at this time.
1997928922 2018-07-17 Production Wells No Violations The purpose of my inspection was to conduct a status check on well #2-2628. RBDMS indicated reported production was current. Access remained stable and drivable through the sewage authority. The well was equipped with a plunger lift assembly that contained correct identification. Production valves were closed. No leaks were observed. The tank battery was shared with 2-2587, 2-2474, 2-2629, and 2-2591 . Correct identification was posted. A stable earthen dike was present around the production equipment. Equipment on location consisted of three (3) horizontal separators and one (1) 210 bbl steel production tanks. The separators remained in good repair. No charts were present in the meter boxes. The production tank remained in good repair.. Valves were closed and plugged. No violations were observed during this inspection.
iDIAN00100 1999-03-25 Preliminary Restoration No Violations
iDIAN001003 1999-3-25 0:00: PL No Violations

For data sources see[9]

References