If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-099-22863 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.04,"lon":-80.69,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Boardman Township | |
Operator Name: EVERFLOW EASTERN PARTNERS LP | |
Well Pad ID: | |
Farm/Lease Name: CONDELLA | |
License Status: Producing | |
License Date: 2000-05-04 | |
Spud Date: 2000-05-08 | |
Spud Drilling Contractor: ROSE RUN DRILLING | |
Final Drill Date: 2000-05-17 | |
Well Total Depth: 6286.00 ft | |
Configuration: Directional | |
Latitude: 41.040000 | |
Longitude: -80.690000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2000-05-04 | Proposed Formations:CLINTON, Issued Date:5/4/00, Expired Date:5/4/01 6:00:00 AM, Drilling unit acres:45, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2000-05-08 | RBDMS Rec |
Completed | 2000-05-17 | RBDMS Rec |
Reached Total Depth | 2000-05-17 | RBDMS Rec |
Completion Report Received | 2000-06-19 | RBDMS Rec |
Correction to Well | 2000-08-11 | CHANGE IN TARGET INFORMATION: FOOTAGE-- 7439'NL & 3542'WL OF TWP. (IN LOT 5,4TH DIVISION); X= 2,496,850; Y= 505,800; ACRES= 45.28 (AS DRILLED SURVEY) |
Construction Permit Expires | 2001-05-04 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2000-08-23 | 6031 | 6131 | 0 |
6031 | 6131 | 0 | |
6031 | 6131 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 2904 Bbl | 100000 |
For data sources see[4]
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2000 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 30 |
2001 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2002 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2003 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2004 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2005 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2006 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2007 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2008 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2009 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2010 | EVERFLOW EASTERN PARTNERS LP | Brine | 7 | 181 |
2011 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 197 |
2012 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 336 |
2013 | EVERFLOW EASTERN PARTNERS LP | Brine | 14 | 365 |
2014 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2015 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2016 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2017 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2018 | EVERFLOW EASTERN PARTNERS LP | Brine | 8 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1094644791 | 2012-12-19 0:00 | PW | No Violations | 1.00 |
-753321838 | 2004-12-6 0:00: | PW | No Violations | 0.50 |
0753321838 | 2004-12-06 | Production Wells | No Violations | The tan battery is shared with permits 2665 and 2302 and consists of 1-100 bbl storage tank, 3-separators, a fence and a dike that is low on the northeast corner. |
0893180748 | 2009-04-01 | Production Wells | No Violations | I performed a random field inspection. I GPSd both the wellhead and the tank battery. I continued my walk around both the tank battery and the wellhead and found both to be in good shape. Both ID signs were posted. There were no violations at this time. |
1094644791 | 2012-12-19 | Production Wells | No Violations | On 12/19/2012, I performed a status check on the above location. The tank battery consist of one 140 barrel tank, one horizontal separator. The well is a 1.5 plunger lift. I D. signs are posted, dike is in good condition. No violations were noticed at this time. This well shares the same tank battery as the Boardman Baptist Church #1 and #2D |
1490681604 | 2012-02-07 | UrbanProduction Wells | No Violations | I conducted a status check on this site and found that the well head was fenced with chain link, and it is equipped with a plunger lift system. The tank battery consists of one 100 barrel stock tank and three separators, no brine storage tank present. The thief hatch was closed and there was a bull plug installed in the draw valve. The tank battery was fenced with board on board, and the dike was free of vegetation and debris. This tank battery is shared with permits 2302 and 2665. Proper identification was posted, and I found no leaks or spills at the well head or tank battery. I took new GPS coordinates of the well head and tank battery. No violations at this time. |
893180748 | 2009-4-1 0:00:0 | PW | No Violations | |
iDIAN00548 | 2000-10-24 | Preliminary Restoration | No Violations | |
iDIAN005487 | 2000-10-24 0:00 | PL | No Violations |
For data sources see[9]