If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-157-22112 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.3,"lon":-81.56,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Tuscarawas | |
Municipality: Salem Township | |
Operator Name: DAVID R HILL INC | |
Well Pad ID: | |
Farm/Lease Name: TAYLOR JAMES & JANICE | |
License Status: Producing | |
License Date: 1973-10-11 | |
Spud Date: 1974-03-23 | |
Spud Drilling Contractor: EDCO DRLG | |
Final Drill Date: 1974-03-31 | |
Well Total Depth: 4930.00 ft | |
Configuration: Vertical | |
Latitude: 40.300000 | |
Longitude: -81.560000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1973-10-11 | 490 HILL DAVID R INC GeoDate 10/11/73 |
Original Spud | 1974-03-23 | |
Completed | 1974-03-31 | |
Reached Total Depth | 1974-03-31 | |
Completion Report Received | 1974-10-07 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2003-07-29 | 4817 | 4865 | 6 |
4817 | 4865 | 6 | |
4817 | 4865 | 6 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
N2 | 0 | 800000 Gal | 0 | |||
H2O | 0 | 800 Mscf | 70000 | 360 BBL WATER | ||
H2O | 0 | 360 Bbl | 70000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | DAVID R HILL INC | 1111.00 | 32.00 | 365 |
1986 | DAVID R HILL INC | 1869.00 | 0.00 | 365 |
1987 | DAVID R HILL INC | 1838.00 | 0.00 | 365 |
1988 | DAVID R HILL INC | 1234.00 | 0.00 | 365 |
1989 | DAVID R HILL INC | 1487.00 | 0.00 | 365 |
1990 | DAVID R HILL INC | 1495.00 | 0.00 | 365 |
1991 | DAVID R HILL INC | 1606.00 | 0.00 | 365 |
2000 | DAVID R HILL INC | 1098.00 | 50.00 | 365 |
2001 | DAVID R HILL INC | 950.00 | 0.00 | 365 |
2002 | DAVID R HILL INC | 813.00 | 156.00 | 365 |
2003 | DAVID R HILL INC | 756.00 | 16.00 | 365 |
2004 | DAVID R HILL INC | 30.00 | 0.00 | 365 |
2005 | DAVID R HILL INC | 159.00 | 0.00 | 365 |
2006 | DAVID R HILL INC | 211.00 | 0.00 | 365 |
2007 | DAVID R HILL INC | 0.00 | 0.00 | 365 |
2008 | DAVID R HILL INC | 0.00 | 0.00 | 365 |
2009 | DAVID R HILL INC | 0.00 | 0.00 | 0 |
2010 | DAVID R HILL INC | 80.00 | 0.00 | 365 |
2011 | DAVID R HILL INC | 341.00 | 0.00 | 365 |
2012 | DAVID R HILL INC | 439.00 | 0.00 | 366 |
2013 | DAVID R HILL INC | 653.00 | 54.00 | 365 |
2014 | DAVID R HILL INC | 386.00 | 0.00 | 365 |
2015 | DAVID R HILL INC | 435.00 | 0.00 | 365 |
2016 | DAVID R HILL INC | 332.00 | 25.00 | 365 |
2017 | DAVID R HILL INC | 373.00 | 0.00 | 365 |
2018 | DAVID R HILL INC | 413.00 | 3.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | DAVID R HILL INC | Brine | 0 | 365 |
1986 | DAVID R HILL INC | Brine | 0 | 365 |
1987 | DAVID R HILL INC | Brine | 0 | 365 |
1988 | DAVID R HILL INC | Brine | 0 | 365 |
1989 | DAVID R HILL INC | Brine | 0 | 365 |
1990 | DAVID R HILL INC | Brine | 0 | 365 |
1991 | DAVID R HILL INC | Brine | 50 | 365 |
2000 | DAVID R HILL INC | Brine | 0 | 365 |
2001 | DAVID R HILL INC | Brine | 0 | 365 |
2002 | DAVID R HILL INC | Brine | 0 | 365 |
2003 | DAVID R HILL INC | Brine | 0 | 365 |
2004 | DAVID R HILL INC | Brine | 0 | 365 |
2005 | DAVID R HILL INC | Brine | 0 | 365 |
2006 | DAVID R HILL INC | Brine | 0 | 365 |
2007 | DAVID R HILL INC | Brine | 0 | 365 |
2008 | DAVID R HILL INC | Brine | 0 | 365 |
2009 | DAVID R HILL INC | Brine | 15 | 0 |
2010 | DAVID R HILL INC | Brine | 0 | 365 |
2011 | DAVID R HILL INC | Brine | 0 | 365 |
2012 | DAVID R HILL INC | Brine | 0 | 366 |
2013 | DAVID R HILL INC | Brine | 0 | 365 |
2014 | DAVID R HILL INC | Brine | 0 | 365 |
2015 | DAVID R HILL INC | Brine | 0 | 365 |
2016 | DAVID R HILL INC | Brine | 45 | 365 |
2017 | DAVID R HILL INC | Brine | 0 | 365 |
2018 | DAVID R HILL INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-62428450 | 2018-5-29 0:00: | PW | No Violations | 0.20 |
0062428450 | 2018-05-29 | Production Wells | No Violations | Upon arrival on location, I witnessed the well was equipped 4.5 inch diameter casing, 1.5 inch diameter tubing, and a plunger lift system. The valves on the tubing and casing were open. Production equipment included a 275 gallon plastic tote, a vertical separator, and a chart recorder with an 2 by .750 inch orifice plate. The production report was up to date and proper identification was present. |
1496151773 | 2017-05-30 | Production Wells | No Violations | I received a phone call from Randy Lawton about a possible pipeline leak. Upon investigation, I found a pin hole leak ins a 2 inch diameter steel line. I called David Hill office and spoke to John about repairs needed. John is to contact me when the repairs are completed. |
For data sources see[9]