X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-055-21461

Well Details

Well ID: 34-055-21461
Loading map...
Country: United States
State: Ohio
County: Geauga
Municipality: Burton Township
Operator Name: EVERFLOW EASTERN PARTNERS LP
Well Pad ID:
Farm/Lease Name: KENT STATE UNIVERSITY
License Status: Producing
License Date: 1987-05-26
Spud Date: 1987-07-07
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]]
Final Drill Date: 1987-07-11
Well Total Depth: 4204.00 ft
Configuration: Vertical
Latitude: 41.480000
Longitude: -81.140000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1987-05-26 Issued Date 5/26/87 Expired Date 5/25/88 Acres 0000000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04204 Proposed Drill Depth 04204
Original Spud 1987-07-07
Completed 1987-07-11
Reached Total Depth 1987-07-11
Completion Report Received 1987-08-10
CO 1987-08-11 84 EVERFLOW EASTERN PTNS L P GeoDate 5/26/87
Construction Permit Expires 1988-05-25
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 3980 4090 0
3980 4090 0
2006-09-11 4002 4088 40
4002 4088 40
3980 4090 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 100000 Gal 60000 FRAC W/100M GAL H20 & 600 SX SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1987 EVERFLOW EASTERN PARTNERS LP 0.00 0.00 0
1988 EVERFLOW EASTERN PARTNERS LP 18013.00 1508.00 365
1989 EVERFLOW EASTERN PARTNERS LP 16608.00 574.00 365
1992 EVERFLOW EASTERN PARTNERS LP 11566.00 349.00 365
1993 EVERFLOW EASTERN PARTNERS LP 5959.00 195.00 365
1994 EVERFLOW EASTERN PARTNERS LP 7126.00 391.00 365
1995 EVERFLOW EASTERN PARTNERS LP 8336.00 284.00 365
1996 EVERFLOW EASTERN PARTNERS LP 6695.00 285.00 365
1997 EVERFLOW EASTERN PARTNERS LP 4320.00 187.00 365
1998 EVERFLOW EASTERN PARTNERS LP 3491.00 94.00 365
1999 EVERFLOW EASTERN PARTNERS LP 2384.00 144.00 365
2000 EVERFLOW EASTERN PARTNERS LP 1188.00 72.00 365
2001 EVERFLOW EASTERN PARTNERS LP 1644.00 180.00 365
2002 EVERFLOW EASTERN PARTNERS LP 3596.00 276.00 365
2003 EVERFLOW EASTERN PARTNERS LP 2847.00 101.00 365
2004 EVERFLOW EASTERN PARTNERS LP 4297.00 277.00 365
2005 EVERFLOW EASTERN PARTNERS LP 3540.00 199.00 365
2006 EVERFLOW EASTERN PARTNERS LP 3725.00 164.00 365
2007 EVERFLOW EASTERN PARTNERS LP 4191.00 174.00 365
2008 EVERFLOW EASTERN PARTNERS LP 3837.00 91.00 365
2009 EVERFLOW EASTERN PARTNERS LP 2883.00 85.00 365
2010 EVERFLOW EASTERN PARTNERS LP 2280.00 185.00 365
2011 EVERFLOW EASTERN PARTNERS LP 2174.00 109.00 365
2012 EVERFLOW EASTERN PARTNERS LP 2899.00 285.00 336
2013 EVERFLOW EASTERN PARTNERS LP 3048.00 219.00 365
2014 EVERFLOW EASTERN PARTNERS LP 2808.00 225.00 365
2015 EVERFLOW EASTERN PARTNERS LP 2857.00 133.00 365
2016 EVERFLOW EASTERN PARTNERS LP 2850.00 207.00 365
2017 EVERFLOW EASTERN PARTNERS LP 3126.00 199.00 365
2018 EVERFLOW EASTERN PARTNERS LP 2782.00 277.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1987 EVERFLOW EASTERN PARTNERS LP Brine 0 0
1988 EVERFLOW EASTERN PARTNERS LP Brine 713 365
1989 EVERFLOW EASTERN PARTNERS LP Brine 178 365
1992 EVERFLOW EASTERN PARTNERS LP Brine 148 365
1993 EVERFLOW EASTERN PARTNERS LP Brine 42 365
1994 EVERFLOW EASTERN PARTNERS LP Brine 80 365
1995 EVERFLOW EASTERN PARTNERS LP Brine 121 365
1996 EVERFLOW EASTERN PARTNERS LP Brine 80 365
1997 EVERFLOW EASTERN PARTNERS LP Brine 57 365
1998 EVERFLOW EASTERN PARTNERS LP Brine 37 365
1999 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2000 EVERFLOW EASTERN PARTNERS LP Brine 40 365
2001 EVERFLOW EASTERN PARTNERS LP Brine 40 365
2002 EVERFLOW EASTERN PARTNERS LP Brine 38 365
2003 EVERFLOW EASTERN PARTNERS LP Brine 82 365
2004 EVERFLOW EASTERN PARTNERS LP Brine 36 365
2005 EVERFLOW EASTERN PARTNERS LP Brine 37 365
2006 EVERFLOW EASTERN PARTNERS LP Brine 38 365
2007 EVERFLOW EASTERN PARTNERS LP Brine 30 365
2008 EVERFLOW EASTERN PARTNERS LP Brine 41 365
2009 EVERFLOW EASTERN PARTNERS LP Brine 41 365
2010 EVERFLOW EASTERN PARTNERS LP Brine 38 365
2011 EVERFLOW EASTERN PARTNERS LP Brine 131 365
2012 EVERFLOW EASTERN PARTNERS LP Brine 179 336
2013 EVERFLOW EASTERN PARTNERS LP Brine 97 365
2014 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2015 EVERFLOW EASTERN PARTNERS LP Brine 100 365
2016 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2017 EVERFLOW EASTERN PARTNERS LP Brine 27 365
2018 EVERFLOW EASTERN PARTNERS LP Brine 81 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-100510227 2014-4-24 0:00: PW No Violations
0000010459 Preliminary Restoration No Violations PASSED Y WITNESSED 11/7/89 INSPECTOR DATE 11/0719/89 DATA FROM OLD VAX INFO
0100510227 2014-04-24 Production Wells No Violations My inspection found the well to be equipped with a plunger lift unit. The annulus is open to a pop off valve that is plumbed into the flow line. The well and the tank battery are in good condition and are surrounded by a locked chain link fence. The tank battery consists of two 100 BBL production tanks, two buried concrete brine tanks, and two mechanical separators. The proper identification is located on the tank battery and the well. The lease road is in stable condition. The tank battery and lease road are being shared by permit number 2-1462.
0855960195 2015-07-21 Production Wells No Violations My inspection found the well to be equipped with a plunger lift unit. The annulus is open to a pop off valve that is plumbed into the flow line. The well and the tank battery are in good condition and are surrounded by a locked chain link fence. The tank battery consists of two 100 BBL production tanks, two buried concrete brine tanks, and two mechanical separators. The proper identification is located on the tank battery and the well. The lease road is in stable condition. The tank battery and lease road are being shared by permit number 2-1462.
10459 PL No Violations
855960195 2015-7-21 0:00: PW No Violations

For data sources see[9]

References