X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-055-22091

Well Details

Well ID: 34-055-22091
Loading map...
Country: United States
State: Ohio
County: Geauga
Municipality: Chardon Township
Operator Name: ROCKEFELLER OIL COMPANY LLC
Well Pad ID:
Farm/Lease Name: LOECY
License Status: Producing
License Date: 2009-05-15
Spud Date: 2009-08-12
Spud Drilling Contractor: GREAT PLAINS EXPLORATION LLC
Final Drill Date: 2009-08-19
Well Total Depth: 3820.00 ft
Configuration: Vertical
Latitude: 41.580000
Longitude: -81.280000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2009-05-15 Proposed Formations:CLINTON, Issued Date:5/15/2009, Expired Date:5/15/2010 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2009-08-19
Completion Report Received 2009-12-04
Change of Owner 2009-12-15 Operator changed from 7909, JOHN D OIL & GAS COMPANY to 7447, GREAT PLAINS EXPLORATION LLC
Construction Permit Expires 2010-05-15
Change of Owner 2016-12-05 Operator changed from 7447, GREAT PLAINS EXPLORATION LLC to 9828, ROCKEFELLER OIL COMPANY LLC
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2010-02-18 3622 3646 22
3622 3646 22
3622 3646 22

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 406 Bbl 100000 560M SCF NITROGEN ASSIST

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2009 GREAT PLAINS EXPLORATION LLC 3169.00 0.00 29
2010 GREAT PLAINS EXPLORATION LLC 17426.00 23.00 365
2011 GREAT PLAINS EXPLORATION LLC 11409.00 0.00 365
2012 GREAT PLAINS EXPLORATION LLC 9147.00 0.00 366
2013 GREAT PLAINS EXPLORATION LLC 3857.00 0.00 365
2014 GREAT PLAINS EXPLORATION LLC 2950.00 0.00 365
2015 GREAT PLAINS EXPLORATION LLC 3768.00 0.00 365
2016 ROCKEFELLER OIL COMPANY LLC 576.00 0.00 61

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2009 GREAT PLAINS EXPLORATION LLC Brine 0 29
2010 GREAT PLAINS EXPLORATION LLC Brine 776 365
2011 GREAT PLAINS EXPLORATION LLC Brine 320 365
2012 GREAT PLAINS EXPLORATION LLC Brine 160 366
2013 GREAT PLAINS EXPLORATION LLC Brine 80 365
2014 GREAT PLAINS EXPLORATION LLC Brine 170 365
2015 GREAT PLAINS EXPLORATION LLC Brine 81 365
2016 GREAT PLAINS EXPLORATION LLC Brine 0 304

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-380108228 2009-8-17 0:00: DD No Violations
-467196790 2016-3-21 0:00: PW No Violations
0380108228 2009-08-17 Drill / Deepen / Reopen No Violations Driller depth 3201, drilling on fluid. Pits are in good repair. Small amount of Diesel fuel spilled on ground, quart or less. Operator was mixing topsoil with spill to cover it up. Asked driller to get peat sorb on site for spills.
0467196790 2016-03-21 Production Wells No Violations My inspection found the well to be equipped with a plunger lift unit. The annulus valve is closed. The well and tank battery equipment are in good repair. The dike on the North West side of the tank battery needs rebuilt. The tank battery consists of a 210 BBL production tank, a 100 BBL brine tank, and a mechanical separator. The load line valves have plugs installed in them but are not locked. The proper identification is located on the tank battery. The lease road is in stable condition. I have contacted the company about repairing the dike.
1250179126 2009-08-12 Drill / Deepen / Reopen No Violations On site for surface cement. Jay Cheslock DMRM supervisor waived the CND for the well. Berea was shallow, bedrock was Berea. Cement job went well, 4 BBL return of cement to surface. Universal the service company on site had pump issues. Not able to completely displace cement. Service company flushed lines attempted to displace 2nd time. Unable to displace. Service company wanted to try a third time. Driller and myself agreed best to drill out cement than risk damaging surface job. Third attempt not made. Cement held at surface, hole was static.
1259783687 2009-12-02 Preliminary Restoration No Violations Well has been put into production today. Annulus pressure was 40psi. Site has been ruff graded. There are significant slopes to the east, north and west of the site. There are intermittent streams in the area. Sent an e-mail to Tim Reily from John D Oil requesting silt fence be installed. There is a stockpile of wood chips on location, suggested that the wood chips could be used as mulch to prevent offsite erosion. Lease road is stable and in good repair. Pits have been closed. Permit identification sign is posted at the end of the lease road.
1282064298 2010-08-17 Administrative Inspection No Violations Annulus pressure reported by the company. 20 August 2009 to 24 August 2009 annular pressure Zero.
1374237420 2013-07-19 Production Wells No Violations My inspection found the well to be equipped with a plunger lift unit. The annulus valve is closed. The well and tank battery are in good repair. The tank battery consists of a 210 BBL production tank, a 100 BBL brine tank, and a mechanical separator. The proper identification is located on the tank battery. The lease road is in stable condition.

For data sources see[9]

References