If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-055-22149 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.35,"lon":-81.11,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Troy Township | |
Operator Name: EXCALIBUR EXPLORATION INC | |
Well Pad ID: | |
Farm/Lease Name: FURDA | |
License Status: Producing | |
License Date: 2014-08-07 | |
Spud Date: 2014-08-29 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2014-09-04 | |
Well Total Depth: 4275.00 ft | |
Configuration: Vertical | |
Latitude: 41.350000 | |
Longitude: -81.110000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-08-07 | Proposed Formations:ORISKANY/CLINTON, Issued Date:8/7/2014, Expired Date:8/6/2016 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-09-04 | |
Completion Report Received | 2015-08-20 | |
Construction Permit Expires | 2016-08-06 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-08-24 | 4062 | 4150 | 35 |
4062 | 4150 | 35 | |
4062 | 4150 | 35 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-09-12 | H2O | 15 | 96363 Gal | 50000 | C&J Energy Services |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | EXCALIBUR EXPLORATION INC | 0.00 | 0.00 | 0 |
2015 | EXCALIBUR EXPLORATION INC | 6372.00 | 1400.00 | 365 |
2016 | EXCALIBUR EXPLORATION INC | 4674.00 | 828.00 | 365 |
2017 | EXCALIBUR EXPLORATION INC | 4417.00 | 687.00 | 365 |
2018 | EXCALIBUR EXPLORATION INC | 4106.00 | 594.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | EXCALIBUR EXPLORATION INC | Brine | 493 | 0 |
2015 | EXCALIBUR EXPLORATION INC | Brine | 943 | 365 |
2016 | EXCALIBUR EXPLORATION INC | Brine | 903 | 365 |
2017 | EXCALIBUR EXPLORATION INC | Brine | 733 | 365 |
2018 | EXCALIBUR EXPLORATION INC | Brine | 539 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-174750442 | 2014-9-17 0:00: | PL | No Violations | |
-1849199637 | 2014-8-29 0:00: | CS | No Violations | |
-1869691534 | 2015-5-4 0:00:0 | PL | No Violations | |
-1892729886 | 2015-7-22 0:00: | PL | No Violations | |
-381652980 | 2014-9-3 0:00:0 | DD | No Violations | |
0024786509 | 2015-10-01 | Production Wells | No Violations | My inspection found no changes since my last inspection. |
0174750442 | 2014-09-17 | Preliminary Restoration | No Violations | My inspection found the well has a guage and a pop off valve on the annulus. The guage reads zero psi. Hagans Well Service has installed the tubing and rods in the well. The pump jack is on location but has not been installed on the well. The pits are open and in stable condition. The pit liner is in good repair. The location is in stable condition. No violations found. |
0381652980 | 2014-09-03 | Drill / Deepen / Reopen | No Violations | My inspection found PDC to have drilled to 3089. No reported issues while drilling to the current depth. The pit liner is in good repair. The location is in stable condition. No violations found. |
1409683410 | 2014-08-29 | Drill / Deepen / Reopen | No Violations | I received a call from Roy Poulson from PDC Drilling that they had spudded the well at 8:00 AM on 8/29/2014. |
1409942118 | 2014-09-05 | Casing String Witnessed | No Violations | I was on location to witness the cementing of the production casing. Poulson Drilling drilled a 7 7/8 hole to 4275. The 4.5 production casing was set at 4276. Petroset was the cement contractor on location. Petroset broke circulation and pumped 230 sacks of Class A Cement that mudscaled at 15.6 ppg. The plug was displaced using 66 BBLs of water. The plug landed and pressure was held at 1500 psi. The location is in stable condition. The pit liner is in good repair. No violations found. |
1829685265 | 2014-09-02 | Drill / Deepen / Reopen | No Violations | My inspection today found Poulson Drilling to have reached 1498. The company has no issues to report while drilling the previous 1498. The location is in stable condition and the pits are in good repair. No violations found. |
1849199637 | 2014-08-29 | Casing String Witnessed | No Violations | I was on location for the cementing of the conductor casing. The 14 3/4 hole was drilled to 93. The 11 3/4 conductor casing was set to 78. Petroset was the cement company on location. Petroset broke circulation and ran 200 sacks of Class A cement that mudscaled at 15.6 ppg. The cement was displaced using 8.5 bbls of fresh water. Cement returns were observed at the surface. The location is in stable condition. The lease road is stone half way to the well and then runs along a field to the location. The pits are stable and the liner is in good repair. The top soil is piled at the West side of the location. The cellar is constructed of a 46 plastic pipe. No violations found. |
1869691534 | 2015-05-04 | Preliminary Restoration | No Violations | My inspection found the location has been graded and seeded. Vegetation is beginning to establish around the location. The landowner is using the trees that were cut down for fire wood. The well is currently being produced. The tank battery is in good repair. The lease road is in stable condition. I will pass preliminary restoration when the vegetation has been established. |
1892729886 | 2015-07-22 | Preliminary Restoration | No Violations | My inspection found the trees have been cut and stacked for the landowners use. The location has been graded and vegetation has established. The well is currently in production. No violations found. Preliminary restoration can be passed. |
1978958416 | 2014-08-30 | Casing String Witnessed | No Violations | I was on location for the cementing of the surface casing. The 11 hole was drilled to 431. The 8 5/8 surface casing was set to 410. The landing joint was set to 390. Petroset was the cement company on location. Petroset broke circulation and ran 185 sacks of Class A cement that mudscaled at 15.6 ppg. The plug was released and displaced using 25 bbls of fresh water. The plug landed and was pressured up on for five minutes. The amount of cement returns was 14 bbls. The location is in stable condition. The pits are stable and the liner is in good repair. No violations found. |
24786509 | 2015-10-1 0:00: | PW | No Violations |
For data sources see[9]