If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-157-25025 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.51,"lon":-81.46,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: EVERFLOW EASTERN PARTNERS LP | |
Well Pad ID: | |
Farm/Lease Name: TUSCARAWAS COUNTY COMMISSIONERS | |
License Status: Producing | |
License Date: 1998-03-16 | |
Spud Date: 1998-03-19 | |
Spud Drilling Contractor: MOHAWK DRLG | |
Final Drill Date: 1998-03-25 | |
Well Total Depth: 4856.00 ft | |
Configuration: Vertical | |
Latitude: 40.510000 | |
Longitude: -81.460000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 1998-03-16 | Proposed Formations:CLINTON, Issued Date:3/16/98, Expired Date:3/16/99 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 1998-03-19 | RBDMS Rec |
Completed | 1998-03-25 | RBDMS Rec |
Reached Total Depth | 1998-03-25 | RBDMS Rec |
Completion Report Received | 1998-07-06 | RBDMS Rec |
Construction Permit Expires | 1999-03-16 | RBDMS Rec |
Change of Owner | 2003-10-17 | Operator changed from 2651, D & L ENERGY INC to 84, EVERFLOW EASTERN PTNS L P |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1998-09-09 | 4632 | 4660 | 20 |
4632 | 4660 | 20 | |
4632 | 4660 | 20 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 7 | 2373 Bbl | 70600 | 500 GALLONS FE ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1998 | D & L ENERGY INC | 5092.00 | 0.00 | 365 |
1999 | D & L ENERGY INC | 14663.00 | 76.00 | 365 |
2000 | D & L ENERGY INC | 8797.00 | 0.00 | 365 |
2001 | D & L ENERGY INC | 7512.00 | 76.00 | 365 |
2002 | D & L ENERGY INC | 5261.00 | 0.00 | 365 |
2003 | D & L ENERGY INC | 4121.00 | 0.00 | 365 |
2004 | EVERFLOW EASTERN PARTNERS LP | 4056.00 | 0.00 | 365 |
2005 | EVERFLOW EASTERN PARTNERS LP | 5036.00 | 51.00 | 365 |
2006 | EVERFLOW EASTERN PARTNERS LP | 3210.00 | 0.00 | 365 |
2007 | EVERFLOW EASTERN PARTNERS LP | 2954.00 | 0.00 | 365 |
2008 | EVERFLOW EASTERN PARTNERS LP | 3230.00 | 0.00 | 365 |
2009 | EVERFLOW EASTERN PARTNERS LP | 2267.00 | 0.00 | 365 |
2010 | EVERFLOW EASTERN PARTNERS LP | 1980.00 | 0.00 | 365 |
2011 | EVERFLOW EASTERN PARTNERS LP | 2063.00 | 48.00 | 365 |
2012 | EVERFLOW EASTERN PARTNERS LP | 1256.00 | 0.00 | 306 |
2013 | EVERFLOW EASTERN PARTNERS LP | 909.00 | 0.00 | 155 |
2014 | EVERFLOW EASTERN PARTNERS LP | 1700.00 | 0.00 | 245 |
2015 | EVERFLOW EASTERN PARTNERS LP | 420.00 | 0.00 | 365 |
2016 | EVERFLOW EASTERN PARTNERS LP | 358.00 | 0.00 | 365 |
2017 | EVERFLOW EASTERN PARTNERS LP | 415.00 | 0.00 | 365 |
2018 | EVERFLOW EASTERN PARTNERS LP | 928.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1998 | D & L ENERGY INC | Brine | 295 | 365 |
1999 | D & L ENERGY INC | Brine | 120 | 365 |
2000 | D & L ENERGY INC | Brine | 35 | 365 |
2001 | D & L ENERGY INC | Brine | 0 | 365 |
2002 | D & L ENERGY INC | Brine | 65 | 365 |
2003 | D & L ENERGY INC | Brine | 0 | 365 |
2004 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2005 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2006 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2007 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2008 | EVERFLOW EASTERN PARTNERS LP | Brine | 70 | 365 |
2009 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2010 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2011 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2012 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 306 |
2013 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 155 |
2014 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 245 |
2015 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2016 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2017 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2018 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-658916428 | 2018-7-13 0:00: | PW | No Violations | 0.20 |
001252i268 | 2002-06-17 | Plug / Plug Back | No Violations | restoration ok |
0658916428 | 2018-07-13 | Production Wells | No Violations | Upon arrival on location, I witnessed the well was equipped 4.5 inch diameter casing, 1.5 inch diameter tubing, and a plunger lift system. The valves on the tubing and the casing were open. Domestic gas was being supplied off the 4.5 inch casing. Production equipment included a steel 100 barrel tank, a steel 50 barrel tank, and a horizonal separator within an earthen dike. The production equipment and well had a chain link fence around them. The production report was up to date and proper identification was present. |
1252i268 | 2002-6-17 0:00: | PB | No Violations | |
1710744015 | 2003-09-16 | Preliminary Restoration | No Violations |
For data sources see[9]