If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-20776 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.97,"lon":-80.83,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Mead Township | |
Operator Name: XTO ENERGY INC. | |
Well Pad ID: US-OH-000549 | |
Farm/Lease Name: KALDOR UNIT B | |
License Status: Producing | |
License Date: 2015-11-02 | |
Spud Date: 2014-12-16 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2015-05-14 | |
Well Total Depth: 17559.00 ft | |
Configuration: Horizontal | |
Latitude: 39.970000 | |
Longitude: -80.830000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-04-23 | Proposed Formations:POINT PLEASANT, Issued Date:4/23/2014, Expired Date:4/22/2016 12:00:00 PM, Drilling unit acres:639.9934, Proposed Well Type:OG, Proposed Well Class:NWC |
APP | 2015-03-03 | Proposed Formations:POINT PLEASANT, Issued Date:3/3/2015, Expired Date:3/2/2017 12:00:00 PM, Drilling unit acres:639.9934, Proposed Well Type:OG, Proposed Well Class:NWC |
Reached Total Depth | 2015-05-14 | |
Correction to Well | 2015-08-07 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
APP | 2015-11-02 | Proposed Formations:POINT PLEASANT, Issued Date:11/2/2015, Expired Date:11/1/2017 12:00:00 PM, Drilling unit acres:183.434, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2015-11-06 | UPDATE TO TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2016-01-11 | |
Record Last Modified | 2017-10-24 | |
Construction Permit Expires | 2017-11-01 |
For data sources see[2]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 09/02/2015 | 09/22/2015 | 10067 | 14,098,200.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Clay Stabilizer, Cla-Chek G | Shrieve | Clay Stabilizer | Water | 7732-18-5 | 15 | 0.00003521 | 45.964 |
Other - (non-hazardous) | NA | 85 | 0.000199513 | 260.464 | ||||
Friction Reducer, Unislick ST-50 | CESI Chemical | Friction Reducer | Other - (non-hazardous) | NA | 70 | 0.0544929 | 71140.3 | |
Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.0233541 | 30488.7 | ||||
Scale Inhibitor, ScaleHib A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00426465 | 5567.49 | |
Other - (non-hazardous) | NA | 70 | 0.00995085 | 12990.8 | ||||
Acid Inhibitor, Unihib G | GeoSafe | Acid Inhibitor | Acetophenone | 98-86-2 | 1 | 0.00000694 | 9.056 | |
Ethoxylated alcohol | 68002-97-1 | 35 | 0.000242783 | 316.952 | ||||
Methanol | 67-56-1 | 5 | 0.00003468 | 45.279 | ||||
Thiourea | 62-56-6 | 1 | 0.00000694 | 9.056 | ||||
Other - (non-hazardous) | NA | 30 | 0.0031953 | 4171.46 | ||||
Short chained glycol ether | 112-34-5 | 60 | 0.0004162 | 543.347 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00000694 | 9.056 | ||||
Polyethylene Glycol | 25322-68-3 | 50 | 0.00532551 | 6952.43 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.0021302 | 2780.97 | ||||
Hydrochloric Acid (15%) | Axiall | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.0640994 | 83681.6 | |
Other - (non-hazardous) | NA | 85 | 0.68534 | 894709 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.0266073 | 34735.7 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.0302356 | 39472.4 | ||||
AP Breaker | Clearwater International | Gel Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.000549217 | 717 | |
Water | XTO | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 90.1183 | 117,649,000.0 | |
Unigel 5F | Universal | Viscosifier | Guar Gum | NA | 95 | 0.000521756 | 681.15 | |
Sand (Proppant) | Universal | Proppant | Silica Substrate | NA | 100 | 8.97123 | 11,711,900.0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-09-22 | H2O | 15 | 16242 Bbl | 660000 | Universal Well Services Inc. | STAGE 23/23
60 SHOTS |
2015-09-02 | H2O | 15 | 536161 Gal | 478600 | Universal Well Services Inc. | STAGE 1/23
60 SHOTS STAGES 2-22 SEE IMAGES |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | XTO ENERGY INC. | 474623 | 0 | 53 |
2016 | XTO ENERGY INC. | 3090257 | 0 | 307 |
2017 | XTO ENERGY INC. | 2251652 | 0 | 349 |
2018 | XTO ENERGY INC. | 909683 | 0 | 364 |
2019 | XTO ENERGY INC. | 122869 | 0 | 67 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | XTO ENERGY INC. | Brine | 10852 | 53 |
2016 | XTO ENERGY INC. | Brine | 28512 | 307 |
2017 | XTO ENERGY INC. | Brine | 16607 | 349 |
2018 | XTO ENERGY INC. | Brine | 7264 | 364 |
2019 | XTO ENERGY INC. | Brine | 918 | 67 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-452470098 | 2018-7-16 0:00: | PW | No Violations | 0.50 |
-898141379 | 2015-10-22 0:00 | PL | No Violations | 1.00 |
0452470098 | 2018-07-16 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with a four-string casing design, 5.5-inch diameter production casing and 2.875 inch diameter tubing that appeared to be open flowing with no artificial lift technology. Annular pressure monitoring was in place on both the 13.325-inch diameter surface casing and the 9.625-inch diameter deep intermediate casing, pressures were monitored with transducers with no ability to read pressures at the well head. Both casings had bleed down lines ran to the production fluid tanks, at the time of my inspection the 13.375-inch diameter casing was open flowing into tanks through a choke manifold. Production equipment included a Gas Processing Unit, that was inside of containment. There were also 4- 400-barrel production fluid tanks inside containment. Production fluid tanks were all shared with 34013206530000, 34013206540000. There was also a defoamer injection tank near the well head and production fluid tanks. There was also a gas compressor on the northeast corner of the pad, there was also a flare stack and approximately a 6 foot flare at the time of my inspection. There was also a 500 barrel frack tank on location that was no longer hooked up to the wells. Identification tags were present, and production was up to date. No violations were found at the time of my inspection. |
0898141379 | 2015-10-22 | Preliminary Restoration | No Violations | On this day there was still excavation equipment on the location. This site had a slip issue that the engineering department was working with them on. I will contact Anthony Carson to check the completion status before passing this restoration. |
For data sources see[9]