If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-103-23714 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.13,"lon":-82.05,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Medina | |
Municipality: Chatham Township | |
Operator Name: HARLEY DRILLING & PRODUCING LT | |
Well Pad ID: | |
Farm/Lease Name: PASEK DONALD | |
License Status: Producing | |
License Date: 1984-05-28 | |
Spud Date: 1986-12-29 | |
Spud Drilling Contractor: | |
Final Drill Date: 1987-01-15 | |
Well Total Depth: 405.00 ft | |
Configuration: Vertical | |
Latitude: 41.130000 | |
Longitude: -82.050000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1984-05-28 | 337 HARLEY DRILLING & PRODUCI GeoDate 5/28/84 |
Oil and Gas | 1984-05-28 | Issued Date 5/28/84 Expired Date 11/24/84 Acres 0063550 Tool Type CT Proposed Formation BEREA Proposed Depth 00000 Proposed Drill Depth 00000 |
Construction Permit Expires | 1984-11-24 | RI 11-29-86 FDT=DARK |
Original Spud | 1986-12-29 | RI 11-29-86 FDT=DARK |
Completed | 1987-01-15 | RI 11-29-86 FDT=DARK |
Reached Total Depth | 1987-01-15 | RI 11-29-86 FDT=DARK |
Record Last Modified | 2015-09-24 | RI 11-29-86 FDT=DARK |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 295 | 355 | 0 |
295 | 355 | 0 | |
295 | 355 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
NITR | 0 | 240 Qts | 0 |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1121520897 | 2014-6-30 0:00: | PW | No Violations | |
000PL11610 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
1121520897 | 2014-06-30 | Production Wells | No Violations | Inspected production well on 06/30/2014. The tank battery consists of 3-100 bbl steel tanks and an underground brine vault located within an earthen dike. Small accumulations of peat/oil/paraffin were noted within the diked area that will need to be cleaned up. The tank battery is used by multiple wells; identification is clearly displayed for all wells utilizing it. The well is equipped with a pump jack with an electric motor. Oil and paraffin were noted on the ground immediately around the wellhead that will need to be cleaned up. Well identification is posted at the wellhead as required. Jason Klauss with Harley Drilling was notified of the need for clean-up at both the tank battery and the wellhead and will address it as soon as possible. No other problems were noted at the time of the inspection. |
PL11610 | PL | No Violations |
For data sources see[9]