If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-129-20105 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.61,"lon":-83.04,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Pickaway | |
Municipality: Jackson Township | |
Operator Name: HOUGHTON INVESTMENTS LLC | |
Well Pad ID: | |
Farm/Lease Name: BJ-78 (SWIW #9) | |
License Status: Active Injection | |
License Date: 2014-11-19 | |
Spud Date: 1995-08-13 | |
Spud Drilling Contractor: CLINT HURT | |
Final Drill Date: 1995-08-17 | |
Well Total Depth: 2431.00 ft | |
Configuration: Vertical | |
Latitude: 39.610000 | |
Longitude: -83.040000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1995-07-24 | 2936 COLUMBIA NATURAL RES INC GeoDate 7/24/95 |
Oil and Gas | 1995-07-24 | Issued Date 7/24/95 Expired Date 7/23/96 Acres 0020000 Tool Type RTAF Proposed Formation ROSE RUN/TPLU Proposed Depth 02431 Proposed Drill Depth 02431 |
Original Spud | 1995-08-12 | LOG TYPE=PHASOR 1 |
Completed | 1995-08-17 | LOG TYPE=PHASOR 1 |
Reached Total Depth | 1995-08-17 | LOG TYPE=PHASOR 1 |
Completion Report Received | 1995-12-04 | LOG TYPE=PHASOR 1 |
Change of Owner | 1999-01-26 | Operator changed from 2936, COLUMBIA NATURAL RES INC to 6227, HOUGHTON INVESTMENTS, L.L.C. |
Annulus Pressure Monitoring Approved | 2010-06-01 | LOG TYPE=PHASOR 1 |
APP | 2010-06-01 | Proposed Formations:ROSE RUN, Issued Date:6/1/2010, Expired Date:6/1/2011 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:SWD, Proposed Well Class:SWIW |
Last Compliance Report | 2010-06-01 | LOG TYPE=PHASOR 1 |
First Injection | 2010-07-12 | LOG TYPE=PHASOR 1 |
APP | 2014-11-19 | Proposed Formations:TRENTON, BLACK RIVER, TREMPEALEAU, Issued Date:11/19/2014, Expired Date:11/18/2016 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:SWD, Proposed Well Class:SWIW |
Construction Permit Expires | 2016-11-18 | LOG TYPE=PHASOR 1 |
Record Last Modified | 2017-02-15 | LOG TYPE=PHASOR 1 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-06-01 | 2393 | 2410 | 0 |
2393 | 2410 | 0 | |
2393 | 2410 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
0 | 0 | 0 | NONE |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1995 | CHESAPEAKE APPALACHIA LLC | 0.00 | 3850.00 | 91 |
1996 | CHESAPEAKE APPALACHIA LLC | 0.00 | 8380.00 | 303 |
1997 | CHESAPEAKE APPALACHIA LLC | 0.00 | 3368.00 | 365 |
1998 | CHESAPEAKE APPALACHIA LLC | 0.00 | 1662.00 | 215 |
1999 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0.00 | 0 |
2000 | HOUGHTON INVESTMENTS LLC | 0.00 | 1736.00 | 0 |
2001 | HOUGHTON INVESTMENTS LLC | 0.00 | 1717.00 | 365 |
2002 | HOUGHTON INVESTMENTS LLC | 0.00 | 1551.00 | 365 |
2003 | HOUGHTON INVESTMENTS LLC | 0.00 | 1045.00 | 365 |
2004 | HOUGHTON INVESTMENTS LLC | 0.00 | 631.00 | 365 |
2005 | HOUGHTON INVESTMENTS LLC | 0.00 | 459.00 | 365 |
2006 | HOUGHTON INVESTMENTS LLC | 0.00 | 282.00 | 365 |
2007 | HOUGHTON INVESTMENTS LLC | 0.00 | 279.00 | 365 |
2008 | HOUGHTON INVESTMENTS LLC | 0.00 | 141.00 | 365 |
2009 | HOUGHTON INVESTMENTS LLC | 0.00 | 143.00 | 365 |
2010 | HOUGHTON INVESTMENTS LLC | 0.00 | 360.00 | 365 |
2011 | HOUGHTON INVESTMENTS LLC | 0.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1995 | CHESAPEAKE APPALACHIA LLC | Brine | 0 | 91 |
1996 | CHESAPEAKE APPALACHIA LLC | Brine | 15711 | 303 |
1997 | CHESAPEAKE APPALACHIA LLC | Brine | 10301 | 365 |
1998 | CHESAPEAKE APPALACHIA LLC | Brine | 7087 | 215 |
1999 | CHESAPEAKE APPALACHIA LLC | Brine | 0 | 0 |
2000 | HOUGHTON INVESTMENTS LLC | Brine | 4510 | |
2001 | HOUGHTON INVESTMENTS LLC | Brine | 13170 | 365 |
2002 | HOUGHTON INVESTMENTS LLC | Brine | 15274 | 365 |
2003 | HOUGHTON INVESTMENTS LLC | Brine | 21400 | 365 |
2004 | HOUGHTON INVESTMENTS LLC | Brine | 16728 | 365 |
2005 | HOUGHTON INVESTMENTS LLC | Brine | 14561 | 365 |
2006 | HOUGHTON INVESTMENTS LLC | Brine | 365 | |
2007 | HOUGHTON INVESTMENTS LLC | Brine | 809 | 365 |
2008 | HOUGHTON INVESTMENTS LLC | Brine | 2149 | 365 |
2009 | HOUGHTON INVESTMENTS LLC | Brine | 3060 | 365 |
2010 | HOUGHTON INVESTMENTS LLC | Brine | 6016 | 365 |
2011 | HOUGHTON INVESTMENTS LLC | Brine | 2845 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1037278002 | 2008-1-16 0:00: | PW | No Violations | |
-1049658029 | 2018-1-12 0:00: | SW | No Violations | 0.20 |
-1128451178 | 2016-7-27 0:00: | SW | No Violations | 2.00 |
-1148332731 | 2003-4-3 0:00:0 | PW | No Violations | |
-1242126416 | 2016-6-16 0:00: | SW | No Violations | 2.70 |
-131515260 | 2019-10-28 0:00 | SW | No Violations | 3.00 |
-1473906280 | 2018-8-29 0:00: | SW | No Violations | 1.10 |
-1644402556 | 2020-1-7 0:00:0 | SW | No Violations | 2.50 |
-1690771065 | 2006-10-26 0:00 | PW | No Violations | |
-1767731254 | 2014-6-3 0:00:0 | SW | No Violations | |
-1835717492 | 2007-3-29 0:00: | PW | No Violations | |
-1906189115 | 2010-8-10 0:00: | SW | No Violations | |
-1921983714 | 2017-6-2 0:00:0 | SW | No Violations | |
-202799066 | 2009-10-27 0:00 | PW | No Violations | |
-2071299249 | 2006-1-10 0:00: | PW | No Violations | |
-268787920 | 2018-12-5 0:00: | SW | No Violations | 1.00 |
-321181581 | 2017-3-3 0:00:0 | SW | No Violations | 2.00 |
-344601893 | 2008-9-10 0:00: | PW | No Violations | |
-39831638 | 2010-5-20 0:00: | PW | No Violations | |
-407273973 | 2005-10-4 0:00: | PW | No Violations | |
-426908326 | 2013-1-17 0:00: | SW | No Violations | |
-485072273 | 2016-11-15 0:00 | SW | No Violations | 2.00 |
-50112271 | 2020-7-27 0:00: | SW | No Violations | 1.00 |
-513239739 | 2010-1-5 0:00:0 | PW | No Violations | |
-587067417 | 2014-2-27 0:00: | SW | No Violations | 1.00 |
-607236932 | 2017-12-13 0:00 | SW | No Violations | 0.20 |
-638023238 | 2006-6-7 0:00:0 | PW | No Violations | |
-755153470 | 2012-8-8 0:00:0 | SW | No Violations | |
-776916072 | 2006-3-7 0:00:0 | PW | No Violations | |
-784926798 | 2012-6-14 0:00: | SW | No Violations | |
-822597111 | 2012-2-7 0:00:0 | SW | No Violations | |
-857768533 | 2013-10-23 0:00 | SW | No Violations | |
-878851763 | 2016-4-15 0:00: | SW | No Violations | 1.00 |
-90398744 | 2005-6-7 0:00:0 | PW | No Violations | |
-906795893 | 2019-2-5 0:00:0 | SW | No Violations | 1.10 |
-911802529 | 2007-1-10 0:00: | PW | No Violations | |
-915641709 | 2009-6-10 0:00: | PW | No Violations | |
-971091223 | 2004-10-5 0:00: | PW | No Violations | |
-978349482 | 2016-3-7 0:00:0 | SW | No Violations | 1.00 |
-983160346 | 2013-7-8 0:00:0 | SW | No Violations | |
001248i488 | 2002-09-03 | Production Wells | No Violations | Inspection revealed no violations noted this date. WEATHER CONDITIONS: Sunny and 77 degrees. |
0022662102 | 2016-04-26 | Administrative Inspection | No Violations | Compliance notice # 1170909584 follow up. Received Email with an attached disposal receipt for the contaminated material that was removed from the location. The site has been remediated. |
0039831638 | 2010-05-20 | Production Wells | No Violations | - Site review per Tom Tamastik. Operator has applied for conversion of well to UIC. No water well in near location to this well, small perennial stream of 1.8 miles of drainage about 270 feet from well.
- Tubing has been removed from well. |
0090398744 | 2005-06-07 | Production Wells | No Violations | - Pump unit not operating while on site.
- No violation noted - Weather Sunny Temp. high 80s |
0202799066 | 2009-10-27 | Production Wells | No Violations | - ID on well and tank. Pump jack not operating while on site. Water meter combine with 34-129-2-0112 reading 7486 gallons = 178 barrels. |
0259031874 | 2014-09-25 | Salt Water Injection Well | No Violations | - Inspection, ID on well and tank
- Annulus pressure 140 PSI Injection pressure 40 - Water meter reading 747360 gallons = 17,794 barrels - Dike area free of debris. - |
0268787920 | 2018-12-05 | Salt Water Injection Well | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted. The containment dike is free of fluids. |
0286227675 | 2003-04-29 | Production Wells | No Violations | - Operator has posted ID sign as requested at last inspection on April 3, 2003.
- Well was operating while on site. |
0294258697 | 2016-04-20 | Salt Water Injection Well | No Violations | Compliance Notice # 1170909584 Follow up inspection. The contaminated material has been removed from the location. |
0321181581 | 2017-03-03 | Salt Water Injection Well | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted. The containment dike is free of fluids. |
0344601893 | 2008-09-10 | Production Wells | No Violations | - Pump unit not operating while on site. ID on well and tank. |
0407273973 | 2005-10-04 | Production Wells | No Violations | - Pump unit not operating while on site. |
0426908326 | 2013-01-17 | Salt Water Injection Well | No Violations | ID at well and tank, injection pump operating while on site. Met with Bob Atha, had Bob to install a small shut off valve between the gauge and the main annulus shut off on the well, this will help to prevent the loss of annulus fluid.
- Annulus pressure 200 Injection pressure 0 Water meter reading 132108 gallons = 3,145 barrels |
0485072273 | 2016-11-15 | Salt Water Injection Well | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted. The containment dike is free of fluids. |
0513239739 | 2010-01-05 | Production Wells | No Violations | - Pump jack not operating while on site, ID on well and tank.
- Weather condition - Temp 17 ground snow covered. |
0531452750 | 2016-04-12 | Salt Water Injection Well | No Violations | Compliance Notice # 1170909584 follow up inspection. The two burn barrels have been emptied. Debris from the burn pile on the ground has been partially removed with the remaining debris buried under a thin layer of soil and gravel. The thin layer was scraped aside during the inspection to reveal a piece of a filter and other burn pile residue. Bob Atha was contacted and sent a picture of the area and told to remove all debris from the burn area and to dispose of the material at an EPA approved land fill. |
0587067417 | 2014-02-27 | Salt Water Injection Well | No Violations | - ID on well and tank, Dike area free of water.
- Annulus pressure 80 Injection 0 on vacuum - Water meter reading 976 756 gallons. - Valve on injection line at injection pump are closed - Weather condition Cloudy temp 22 ground condition frozen |
0596000661 | 2017-09-06 | Salt Water Injection Well | No Violations | My inspection today revealed the saltwater injection well had 75 psi on the annulus. The injection tubing was on vacuum. |
0607236932 | 2017-12-13 | Salt Water Injection Well | No Violations | My inspection revealed the salt water injection well had 41 psi on the annulus and 15 psi on the injection tubing. The containment dike was free of fluids. Legible identification was posted. |
0638023238 | 2006-06-07 | Production Wells | No Violations | - Pump unit operating while on site. ID on well and tanks. |
0646342462 | 2015-07-14 | Salt Water Injection Well | No Violations | Inspected the unloading pad, and pad vault, containment dike, tanks, injection pump, injection pressure and annulus pressure. The unloading pad vault was completely full of water. I called Bob Atha and told him that the vault must be pumped down. Bob responded that he would pump out the vault today. |
0671186194 | 2011-06-29 | Salt Water Injection Well | No Violations | - ID on well and tank, Annulus pressure 660 injection pressure 20 injection pump operating while on site. Water meter 660331 gallons = 15,722 barrels. |
0732434678 | 2012-09-09 | Salt Water Injection Well | No Violations | - Joint inspection with Jon Scott of MRM.
- ID on well and tank - Injection pressure 0 Vacuum annulus pressure 380 Water meter reading 725906 gallons = 17,283 barrels flow rate 5.01 |
0755153470 | 2012-08-08 | Salt Water Injection Well | No Violations | - ID on well and tank, Annulus pressure 460 injection pressure 120 Water meter reading 652453 gallons = 15,534 barrels flow rate 3.02 gallons |
0776916072 | 2006-03-07 | Production Wells | No Violations | - Pump unit not operarting while on site. ID at well and tanks.
- Water is pump into BJ 78 permit 194. |
0784926798 | 2012-06-14 | Salt Water Injection Well | No Violations | - ID on well and tank, dike area free of water and debris. Injection pump not operating while on site.
- Annulus pressure 500 PSI injection pressure 0 vacuum water meter reading 507155 gallons |
0822597111 | 2012-02-07 | Salt Water Injection Well | No Violations | - Annulus pressure 520 Injection pressure 0 on vacuum
- Dike area free of water, - ID on well and tank. - Weather conditions overcast temp. low 30s |
0847298687 | 2015-03-02 | Salt Water Injection Well | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted at the containment dike. |
0857768533 | 2013-10-23 | Salt Water Injection Well | No Violations | ID on well and tank, injection pump not operating while on site.
- Annulus pressure 100 Injection pressure 0 on vacuum water meter reading 778648 gallons = 18,539 barrels. |
0878851763 | 2016-04-15 | Salt Water Injection Well | No Violations | Compliance notice # 1170909584 follow up inspection. Meet Bob Atha on site. The remaining burn pile residue has been excavated and placed on a tarp. The excavated material is to be taken to the landfill. |
0892440654 | 2016-01-21 | Salt Water Injection Well | No Violations | Inspected the unloading pad, containment dike, tanks, injection line, injection pressure and annulus pressure. Identification posted on the pump house. |
0906795893 | 2019-02-05 | Salt Water Injection Well | No Violations | Inspected the unloading pad, containment dike, tanks, injection line, injection pressure and annulus pressure. Identification is posted on the pump house. The containment dike has 2 inches of ice. |
0911802529 | 2007-01-10 | Production Wells | No Violations | - Pump unit not operating while on site. ID on well and tank. |
0915641709 | 2009-06-10 | Production Wells | No Violations | - ID on well and tank, pump jack operating while on site. |
0971091223 | 2004-10-05 | Production Wells | No Violations | Well operating while on site, pump unit has fence around it, area clean of debris.
Weather Sunny temp Mid 60s PM. |
0978349482 | 2016-03-07 | Salt Water Injection Well | Violations Noted | Inspected the unloading pad, containment dike, injection pump, injection line, injection pressure, and annulus pressure. Identification posted. Used brine filters were on the ground outside of the unload pad and in a pile between the well and dike. Bob Atha was contacted and told to remove the used filters from the ground and to store them in a waterproof container until they can be disposed of properly at an EPA approved landfill. |
0983160346 | 2013-07-08 | Salt Water Injection Well | No Violations | - ID on well and tank, Annulus pressure 220 injection pressure 0 on vaccum
- water meter reading 563225 gallons = 13,410 barrels |
1025320169 | 2003-10-21 | Production Wells | No Violations | 1- Well is pumping while on site, no problem note at this time. |
1032395256 | 2009-03-31 | Production Wells | No Violations | - ID on well and tank, pump unit not operating while on site. |
1037278002 | 2008-01-16 | Production Wells | No Violations | - Pump unit not operating while on site. ID at well and tanks. Dike area free of water. Tanks have been paint this past summer. |
1042576120 | 2003-01-14 | Preliminary Restoration | Violations Noted | 1. No permit at well head. Is sharing tank battery with permit 112 |
1049658029 | 2018-01-12 | Salt Water Injection Well | No Violations | Salt water injection well inspection. The well had 35 psi on the annulus and the injection tubing had 6 psi. The well had a legible identification. The dike was free of fluids. |
1057880045 | 2013-03-27 | Salt Water Injection Well | No Violations | - ID on well and tank Annulus pressure 200 Injection pressure 0
- Water meter reading 244337 gallons = 5,817 barrels - Tank Dike area shared with permits 20194 and 20112 - Weather conditions Cloudy temp 30s Wet ground conditions |
1072845327 | 2007-04-11 | Production Wells | No Violations | - well pump unit operating while on site. Dike area free of water. ID on tanks and well.
- Weather Overcast light rain Temp. low 40s wet ground condition. |
1073084317 | 2011-04-18 | Salt Water Injection Well | No Violations | - Annulus pressure 600 Injection 0 on vacuum. ID on well and tank. Injection pump not operating while on site. Meter reading 315745 gallons = 7,517 barrels
- Weather partly cloudy temp 70s wet ground conditions |
1111104301 | 2011-10-06 | Salt Water Injection Well | No Violations | - Annulus pressure 420 injection pressure 0 on vacuum, water meter 927169 gallons = 22,075 barrels.
- Dike area free of water. |
1128451178 | 2016-07-27 | Salt Water Injection Well | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted. |
1148332731 | 2003-04-03 | Production Wells | No Violations | 1. Well has no ID sign this well shares tank with permit 112. Notified operator and will make correction. |
1170909584 | 2016-04-01 | Salt Water Injection Well | Violations Noted | Compliance Notice # 978349482 follow up inspection. Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. A burn pile was observed between the well and containment dike. This burn site has the remains of burned brine filters and other trash. This is improper disposal of oil field waste. The waste must be cleaned up and removed to an EPA approved landfill for disposal. |
1176676000 | 2008-06-11 | Production Wells | No Violations | - ID at well and tanks. Pump unit not operating while on site. |
1210i85737 | 2002-04-02 | Production Wells | No Violations | Well has pump jack and is pumping. Have had old oil spill leak from well head. 6ft. X 2ft. oil stained area. |
1210i857376 | 2002-4-2 0:00:0 | PW | No Violations | |
1236075140 | 2015-04-28 | Salt Water Injection Well | No Violations | UIC inspection. The annulus pressure was 7 PSI, the injection side was on vacuum. |
1242126416 | 2016-06-16 | Salt Water Injection Well | No Violations | Inspected the injection facility, tanks, injection pump, injection line, containment dike, injection pressure and annulus pressure. Identification posted. I notified Bob Atha about a small leak(corroded area 2 in diameter was seeping brine) on the injection line between the 90 ell and the union on the well side. Bob replaced the section of injection line. |
1248i488 | 2002-9-3 0:00:0 | PW | No Violations | |
1277126633 | 2010-06-15 | Production Wells | No Violations | - On site for inspection, well has been approve to be converted into a UIC injection well.
- New 2 3/8 inch 4.7 lbs lined tubing rated at 7,000 psi and Pamaco packer on location. - Operator waiting for service rig for well completion. |
1279800767 | 2010-07-13 | Salt Water Injection Well | No Violations | - On Site for test of injection flow line from pump to well. The line is SDR 7 API-15 PE 3408 CDE ASTM D2513 and Flying W Spartan approved gas 2 inch IPS SDR 7.3 ASTM MD2513 PE 3608 / PE 3408 CDC
- The divisions gauge installed at well, line pressure to 200 psi and tested for 15 minutes, and passed with no loss of pressure. - Tubing and packer were set into well on July 1, 2010 and a variance was granted on July 2, 2010 for the placement of the packer to be set at 2160 feet which is 233 feet above the injection zone. The variance was approved by MRM Geologist Tom Tomastik. |
1379527737 | 2019-4-24 0:00: | SW | No Violations | 0.50 |
1381189634 | 2015-09-16 | Salt Water Injection Well | No Violations | Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Accompanied by UIC Geologist. Measured containment dike. 100 barrel steel tank had overflowed recently into the containment dike. The dike gravel is stained. All oil and water has been removed from the containment dike. |
1384586587 | 2008-04-08 | Production Wells | No Violations | - Pump unit operating while on site, ID on well electric box and tanks, Tank dike area free of water.
No violations. |
1401391382 | 2014-05-29 | Salt Water Injection Well | No Violations | - Site review request by Andrew Adgate
- The operator has submitted an application to deepen current injection well. - There appears to be no special requirement needed. |
1415289967 | 2014-11-06 | Salt Water Injection Well | No Violations | Site evaluation for Conversion -Deepen existing salt water injection well. Existing surface facility has two 210 barrel tanks and one 100 barrel tank in the containment dike. There are six water wells with in the 2640 radius of the injection well facility. Water Well Log numbers: 397503, 277926, 607465, 731454, 801271, 69659. Lick Run is located 168 West of the facility. |
1458303463 | 2016-03-11 | Salt Water Injection Well | No Violations | Compliance Notice #978349482 follow up inspection. The used filters by the unloading pad have been removed. The unloading pad sump fluid level has been lowered. There are used filters and filter socks on the ground by burn barrels that are located between the injection well and the containment dike. I contacted Bob Atha about the need to continue the removal of the filters. |
1472673590 | 2016-08-30 | Surface Facility Construction | No Violations | Injection line test. 130 feet of DR-11, 2 inch black plastic line. The injection line was filled with fresh water and tested multiple times. Each test failed with in 3 minutes. Bob Atha is going to reconfigure the injection line. |
1473906280 | 2018-08-29 | Salt Water Injection Well | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure, and annulus pressure. Identification posted. |
1474393345 | 2016-09-20 | Surface Facility Construction | No Violations | Injection line test. Tested the new 2 7/8 inch pvc lined injection line. The injection line is not buried. Tested from the containment dike to the injection tubing master valve. Tested at 305 psi for 15 minutes. At 5 minutes 305 psi. At 15 minutes 310 psi. The weather today is 85 degrees F. |
1499952300 | 2017-07-13 | Salt Water Injection Well | No Violations | Quarterly UIC inspection. The annulus pressure was 79 PSI, the injection tubing was on vacuum. Legible identification was posted. No violations noted. |
1524639819 | 2015-11-02 | Salt Water Injection Well | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted on tank. Dike was free of fluids. A new injection pump has been installed in a storage building that is raised above the containment dike. |
1526321416 | 2018-05-14 | Salt Water Injection Well | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification is posted. The containment dike is free of fluids. |
1567622726 | 2019-8-27 0:00: | SW | No Violations | 2.50 |
1621524198 | 2016-08-23 | Surface Facility Construction | No Violations | The injection line has been replaced with 130 feet of 2 inch SDR 11 black plastic line from the containment dike to the well. The injection line was filled with brine and tested at 265 psi the test failed due to pressure dropping off at a steady rate of 40 psi in 5 minutes. The entire system was inspected for leaks. No leaks were observed other than a slight drip on a 2 inch stainless steel nipple at the well head. Multiple attempts were made to test the line with no success. Bob Atha is scheduling a pump truck with fresh water. |
1639391355 | 2019-12-10 0:00 | SW | No Violations | 1.50 |
1647692199 | 2015-06-11 | Salt Water Injection Well | No Violations | Inspected the unload pad, unload pad vault, containment dike, tanks, injection pump, injection line, injection pressure, and annulus pressure. Containment dike is free of fluids. Identification posted at the tank containment dike and the well. |
1665746595 | 2020-5-26 0:00: | SW | No Violations | 1.00 |
1690771065 | 2006-10-26 | Production Wells | No Violations | - pump unit not operating while on site. ID on well and tank. |
1763168423 | 2012-03-20 | Salt Water Injection Well | No Violations | - ID on well and tank, Annulus pressure 520 Injection 100. Injection pump running while on site
- Water meter 272552 gallons = 6,489 barrels. |
1767731254 | 2014-06-03 | Salt Water Injection Well | No Violations | - On site for UIC inspection, ID on well and tank
- Annulus pressure 140 psi Injection pressure 0 -Water meter reading 121966 gallons = 2,903 barrels - Weather condition Cloudy Temp 85 Humid Damp to Wet ground conditions |
1827219795 | 2007-09-11 | Production Wells | No Violations | - Pump unit operating while on site, ID on well and tanks. |
1835717492 | 2007-03-29 | Production Wells | No Violations | - Pump unit operating while on site, ID on tanks and well. Fence around pump unit.
- Operator plans to place UIC unloading pad at tank battery. - Weather sunny Temp 60s |
1896276483 | 2010-12-07 | Salt Water Injection Well | No Violations | - Well ID and tank ID.
- Annulus pressure 340 injection 0 vacuum. Water meter reading 478205 gallons = 11385 barrels - injection pump line disconnected from tank to pump. - Tank dike area clean of debris and liner good shape. |
1906189115 | 2010-08-10 | Salt Water Injection Well | No Violations | - Injection pump operating while on site, injection pressure 0 on vacuum, annulus pressure 600 water meter 744349 gallons = 17,722 barrels. Flow rate 4.42gallons per minute.
- ID on well and tank. |
1921983714 | 2017-06-02 | Salt Water Injection Well | No Violations | Salt water injection well inspection. The injection pressure was 78 PSI, the annulus pressure was 161 PSI. No violations noted. |
2071299249 | 2006-01-10 | Production Wells | No Violations | - Pump unit operating while on site, ID at well area.
- Weather Cloudy temp 30s |
2129148102 | 2012-09-06 | Salt Water Injection Well | No Violations | Accompanied Mike Mitchell MRI 3 on inspection of the injection well facilities and checking injection and annulus pressures. |
2132161202 | 2010-03-17 | Production Wells | No Violations | - pump jack not operating while on site, ID on well and tank.
- Weather condition Sunny Temp 60s |
22662102 | 2016-4-26 0:00: | AM | No Violations | |
259031874 | 2014-9-25 0:00: | SW | No Violations | |
286227675 | 2003-4-29 0:00: | PW | No Violations | |
294258697 | 2016-4-20 0:00: | SW | No Violations | 1.00 |
531452750 | 2016-4-12 0:00: | SW | No Violations | 2.00 |
596000661 | 2017-9-6 0:00:0 | SW | No Violations | 1.00 |
646342462 | 2015-7-14 0:00: | SW | No Violations | 3.00 |
671186194 | 2011-6-29 0:00: | SW | No Violations | |
732434678 | 2012-9-9 0:00:0 | SW | No Violations | |
847298687 | 2015-3-2 0:00:0 | SW | No Violations | 1.00 |
892440654 | 2016-1-21 0:00: | SW | No Violations | 3.00 |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0978349482 | US-OH-131240 | 2016-05-06 | Pollution/Contamination | |
1042576120 | US-OH-100634 | 2003-01-14 | Failure to legibly identify well | |
1170909584 | US-OH-104521 | 2016-05-06 | Pollution/Contamination |
For data sources see[9]