If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-081-20697 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.22,"lon":-80.85,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Jefferson | |
Municipality: Smithfield Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001458 | |
Farm/Lease Name: CLUB NW SMF JF | |
License Status: Producing | |
License Date: 2017-03-31 | |
Spud Date: 2017-03-06 | |
Spud Drilling Contractor: | |
Final Drill Date: 2017-06-10 | |
Well Total Depth: 19933.00 ft | |
Configuration: Horizontal | |
Latitude: 40.220000 | |
Longitude: -80.850000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-01-24 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:1/24/2017, Expired Date:1/24/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-03-31 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:3/31/2017, Expired Date:3/31/2019 12:00:00 PM, Drilling unit acres:375.55, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2017-05-19 | as drilled plat recvd TE |
Reached Total Depth | 2017-06-10 | |
Correction to Well | 2017-06-30 | CHANGE TO TARGET AND TAKE-POINT INFORMATION FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 501.465 ACRES. |
Completion Report Received | 2018-03-15 | |
Record Last Modified | 2018-03-28 | |
Correction to Well | 2018-03-30 | UPDATE TARGET/TAKE POINT PER AS-DRILLED PLAT |
Construction Permit Expires | 2019-03-31 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-03-20 | 9682 | 9822 | 30 |
2018-03-20 | 19653 | 19754 | 18 |
19653 | 19754 | 18 | |
9682 | 9822 | 30 | |
9682 | 9822 | 30 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 09/27/2017 | 11/04/2017 | 9293 | 1,160,910.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | MC MX 2-2822 | Halliburton | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 |
Ingredients | Listed Above | Listed Above | Water | 7732-18-5 | 100 | 1.62476 | 495145 | |
SP BREAKER | Halliburton | Breaker | Listed Below | Listed Below | 0 | 0 | 0 | |
SAND-PREMIUM WHITE-40/70 | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
FR-76 | Halliburton | Friction Reducer | Listed Below | Listed Below | 0 | 0 | 0 | |
WG-36 GELLING AGENT | Halliburton | Gelling Agent | Listed Below | Listed Below | 0 | 0 | 0 | |
FE-1A ACIDIZING COMPOSITION | Halliburton | Additive | Listed Below | Listed Below | 0 | 0 | 0 | |
Guar gum | 9000-30-0 | 100 | 0.00957183 | 2917 | ||||
Acrylamide acrylate copolymer | Proprietary | 30 | 0.097781 | 29799 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 66.3784 | 20,228,700.0 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.0343072 | 10456 | ||||
Phosphoric acid | 7664-38-2 | 0.1 | 0.000114357 | 35 | ||||
Inorganic salt | Proprietary | 30 | 0.097781 | 29799 | ||||
Olefins | Proprietary | 5 | 0.000577728 | 178 | ||||
Sodium chloride | 7647-14-5 | 5 | 0.0060422 | 1842 | ||||
Amines, polyethylenepoly-, ethoxylated,
phosphonomethylated, sodium salts |
70900-16-2 | 30 | 0.0362532 | 11049 | ||||
Hydrotreated light petrolem distillates | Proprietary | 100 | 0.000438394 | 134 | ||||
Sodium persulfate | 7775-27-1 | 100 | 0.000479084 | 146 | ||||
Fatty acids, tall oil | Proprietary | 30 | 0.00144432 | 441 | ||||
Acetic anhydride | 108-24-7 | 100 | 0.0291073 | 8871 | ||||
Hydrochloric acid | 7647-01-0 | 7.5 | 0.0877606 | 26745 | ||||
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl chlorides |
68424-85-1 | 5 | 0.00571786 | 1743 | ||||
Formaldehyde | 50-00-0 | 0.09 | 0.00010876 | 34 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.097781 | 29799 | ||||
Neutralized Polyacrylic Emulsion | Proprietary | 10 | 0.01158 | 3529 | ||||
Ethylene Glycol | 107-21-1 | 60 | 0.06948 | 21174 | ||||
Modified thiourea polymer | Proprietary | 30 | 0.00144432 | 441 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.00048144 | 147 | ||||
Ethoxylated alcohols | Proprietary | 30 | 0.00144432 | 441 | ||||
Sodium sulfate | 7757-82-6 | 0.1 | 0.00000048 | 1 | ||||
Methanol | 67-56-1 | 60 | 0.039302 | 11979 | ||||
Ethanol | 64-17-5 | 1 | 0.00114357 | 349 | ||||
Acetic acid | 64-19-7 | 60 | 0.0174644 | 5323 | ||||
MC B-8614 | Halliburton | Biocide | Listed Below | Listed Below | 0 | 0 | 0 | |
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 | |
HYDROCHLORIC ACID | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Water | 7732-18-5 | 100 | 31.7321 | 9,670,320.0 | |
SAND-COMMON WHITE - 100 MESH | Halliburton | Proppant | Listed Below | Listed Below | 0 | 0 | 0 | |
LCA-1 | Halliburton | Solvent | Listed Below | Listed Below | 0 | 0 | 0 | |
MC S-2510T | Halliburton | Scale Inhibitor | Listed Below | Listed Below | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-09-27 | H2O | 8 | 258125 Gal | 351795 | Halliburton | STAGE 1/58
STAGES 2-57 SEE IMAGES |
2017-10-26 | H2O | 8 | 284806 Gal | 404438 | Halliburton | STAGE 58/58
STAGES 2-57 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ASCENT RESOURCES UTICA LLC | 278097 | 0 | 13 |
2018 | ASCENT RESOURCES UTICA LLC | 5913981 | 0 | 365 |
2019 | ASCENT RESOURCES UTICA LLC | 510210 | 0 | 81 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2017 | ASCENT RESOURCES UTICA LLC | Brine | 4087 | 13 |
2018 | ASCENT RESOURCES UTICA LLC | Brine | 29626 | 365 |
2019 | ASCENT RESOURCES UTICA LLC | Brine | 2433 | 81 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1222926049 | 2017-8-16 0:00: | CT | No Violations | 0.70 |
-1339499074 | 2017-5-30 0:00: | DD | No Violations | 2.00 |
-1647614568 | 2017-9-15 0:00: | CT | No Violations | 1.70 |
-190491014 | 2017-12-11 0:00 | CT | No Violations | 0.50 |
-829594999 | 2020-4-20 0:00: | PW | No Violations | 1.00 |
-845190910 | 2017-3-6 0:00:0 | CS | No Violations | 4.50 |
0190491014 | 2017-12-11 | Completion Testing | No Violations | On the date of my inspection I found a well maintained access road with an unlocked gate. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. The pad has 5 recently stimulated wells, 10 sand separators, 5 gas production units, and 2 shared 500 barrel tanks within a metal dike. Identification has not been placed on the wellheads yet. The wellheads are equipped with christmas tree valves. There are 2 flowlines coming from each wellhead. Currently Express Energy Services and ROC Service Company are onsite rigging up flowback equipment on the 5H, 7H, and 8H. Ascent anticipates flowback operation to begin on 12/12/17. |
0536954984 | 2017-10-02 | Completion Testing | No Violations | On the date of my inspection I found a Halliburton crew rigged up on all three wells on the pad for hydraulic fracturing operations. While I was on site I witnessed Halliburton pump the frac job for stage 25 of 70 for permit 34-081-2-0700 and stage 11 of 56 for permit 34-081-2-0699. Halliburton has stimulated stage 10 of 53 states on this well. All hazardous materials are within double containment which is in good condition, free of visible punctures or tears. The location is surrounded by a fenced berm with healthy vegetation. The pad drain valves show they are in the closed position. |
0845190910 | 2017-03-06 | Casing String Witnessed | No Violations | I am on site today to witness the cementing of 24 inch conductor casing. Precision Drilling drilled a 30 inch diameter hole to a depth of 125 feet and ran 125 feet of 24 inch diameter 96 pound per foot conductor casing. A 10 foot mine void was found from 70 to 80 feet, a basket was ran at approximately 55 feet. O-Tex pumped 220 sacks of class H cement, 1.2 yield, 15.6 pounds per gallon with 2 percent Calcium Chloride and 0.25 pound per sack flow seal. O-Tex then displaced with 20 barrels of water to set the shoe. 1 bag of calcium chloride along with 1 bag of cotton seed hulls were poured down the backside of the 24 inch casing into the basket. O-Tex ran 10 feet of hose down the hole on one side of the casing to pump cement and ran another hose down the other side to pour approximately 10 gallons of Sodium Silicate to flash set the cement in the basket. O-Tex pumped approximately 122 sacks of cement until it returned to within 10 feet of surface and remained static. Ascent will come back and top out with ready-mix. |
1222926049 | 2017-08-16 | Completion Testing | No Violations | On the date of my inspection I found 9 Energy Services running a cement bond log on permit 34-081-2-0699 with a wireline truck. Great Lake Wellhead Inc. was also onsite installing wellheads. Currently there are 5 frac tanks and a few miscellaneous pieces of equipment onsite that are associated with the operations currently being performed on the pad. The pad berms and the area immediately adjacent to the pad have been recently hydroseeded. |
1316637386 | 2017-03-08 | Casing String Witnessed | No Violations | Today I verified that the remaining annulus and cellar were topped out with ready-mix. Ascent has filled the floor of the cellar with ready-mix, leaving an approximately 18 inch barrier between the cellar floor and soil below. Ascent plans to install the mouse hole after a top hole rig completes the surface string, before a big rig is brought in to complete the remaining strings. |
1317630211 | 2018-04-16 | Preliminary Restoration | No Violations | On the day of my inspection I found this pad containing 5 properly labeled wells that are producing. This well is equipped with christmas tree style wellhead. Pressure gauges read as follows: Surface 10 psi, Intermediate 1625 psi, Production 3100 psi, and tubing was 1400 psi. Production equipment includes two 500 barrel steel tanks within their own steel containment, five line heaters, and five GPUs. Site is stable and vegetated. Site meets preliminary restoration requirements of 1509.072A. |
1339499074 | 2017-05-30 | Drill / Deepen / Reopen | No Violations | I am onsite to perform a general site inspection. Patterson drilling rig 284 is currently drilling the intermediate string at approximately 7400 feet. The pad is in good condition and the vegetation on the berms appears healthy. The pad drain valves are closed and do not appear to have any leakage issues. The containment areas appear to be free of tears and punctures. All hazardous materials are within containment areas. |
1490091842 | 2017-03-21 | Casing String Witnessed | No Violations | I am on site to witness the running and cementing of 13.375 inch surface casing. Falcon Rig 26 drilled a 17.5 inch diameter hole to a depth of 1433 feet and set 1420 feet of 13.375 inch 61 pound per foot casing. O-Tex established circulation with fresh water, pumped 1420 sacks of class H cement, 1.2 yield and 15.6 pound per gallon, 2 percent calcium chloride, 0.25 pound cello flake per sack. Approximately 70 barrels of good quality cement returned to surface. The wiper plug landed and pressure was increased to approximately 500 pounds per square inch (psi) over pump pressure, the casing held approximately 1170 psi for 5 minutes. |
1497816229 | 2017-10-30 | Completion Testing | No Violations | On the date of my inspection I found the pad being prepared for drill out operations. The frac crew has moved off the pad after completing 63 stages on this well. Ascent estimates the drill out rig will be moving onto the pad within 8 days. Pressure gauges on the surface and intermediate casings read 0 and 700 pounds per square inch respectively. The pad is surrounded by a fenced earthen dike covered by healthy vegetation. The pad drain valves are in the closed position and do not appear to be leaking. |
1647614568 | 2017-09-15 | Completion Testing | No Violations | On the date of my inspection I found a Halliburton crew rigged up on all three wells on the pad for hydraulic fracturing operations. While I was on site I witnessed Halliburton pump the frac job for stage 28 of 62 on permit 3408120698. They are currently on stage 30 of 63 on this well. All hazardous materials are within double containment which is in good condition, free of visible punctures or tears. The location is surrounded by a fenced berm with healthy vegetation. The pad drain valves show they are in the closed position. |
536954984 | 2017-10-2 0:00: | CT | No Violations | 2.00 |
For data sources see[10]