X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-081-20813

Well Details

Well ID: 34-081-20813
Loading map...
Country: United States
State: Ohio
County: Jefferson
Municipality: Salem Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-001386
Farm/Lease Name: WILLIAMSON 12-10-3
License Status: Producing
License Date: 2019-03-19
Spud Date: 2019-03-22
Spud Drilling Contractor:
Final Drill Date: 2019-04-27
Well Total Depth: 20819.00 ft
Configuration: Horizontal
Latitude: 40.450000
Longitude: -80.770000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2019-03-19 Proposed Formations:POINT PLEASANT, Issued Date:3/19/2019, Expired Date:3/18/2021 12:00:00 PM, Drilling unit acres:513.55, Proposed Well Type:OG, Proposed Well Class:POOL
Record Last Modified 2019-04-02
Construction Permit Expires 2021-03-18

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
9305 9427 0
20483 20606 0
9305 9427 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1140356739 2019-7-22 0:00: CT No Violations 1.00
-1162757618 2019-8-7 0:00:0 CT No Violations 1.00
-1226196611 2019-8-15 0:00: PL No Violations 1.00
-1737383772 2019-6-5 0:00:0 CT No Violations
-353477897 2019-7-8 0:00:0 CT No Violations 1.00
-39240432 2019-8-1 0:00:0 CT No Violations 1.00
1430535587 2019-7-2 0:00:0 CT No Violations 1.00
1574227317 2019-8-7 0:00:0 CT No Violations 1.00
1704199313 2019-03-24 Casing String Witnessed No Violations PAD ADDRESS: 2455 Township road 218, Richmond. On the day of my inspection I witnessed Express Energy attempt to top out this well. On 3/23 they pumped 214 sacks of cement and there were no returns to surface. Today they tagged cement at 70 feet and ran 1 inch diameter tubing to 70 feet. Express pumped an additional 176 sacks of top out cement. Cement returned to surface.
1737383772 2019-06-05 Completion Testing No Violations On the day of my inspection I was accomapnied by Supervisor Eric Conrad. We witnessed a Profrac frac crew onsite pressure testing lines. No stages have been pumped on this pad yet. Toe sleeves on this well at 20681 feet. This well is slated for 76 frac stages. They will perform a formation injection test on the first stage of this well. Pad has four 350 barrel steel produced water tanks in their own containment on the northwest side of the pad. Tanks are temporary and will be removed after frac is completed. The 13.375x9.625 annular pressure was 60 psi and the 9.625x5.5 annular pressure is 160 psi.
1775958291 2019-04-15 Casing String Witnessed No Violations On the day of my inspection I witnessed the surface casing cement job. Patterson 580 drilled a 17.5 inch diameter open hole to a depth of 521 feet. Previous casing set and cemented was 20 inch diameter conductor casing to a depth of 120 feet ground level. Wyoming Casing ran 511 feet of 13.375 inch diameter casing, j-55, 54.5 lbs/foot, with 5 foot stick up. Casing was centralized. Shoe track is 43 feet long. Halliburton was onsite with 500 sacks of class H cement. Cement weighed with mudscale at 16.8 ppg and yield of 1.1. 50% excess ran in open hole. Cement displaced with 72 barrels of fresh water. 30 barrels of gel pumped ahead of cement. 14 barrels of cement returned to surface weighing 16 ppg, and floats held with 1 barrel back. All depths are based on rig KB. Rig KB is 25 feet.
357809377 2019-7-15 0:00: CT No Violations 0.70
855485 2019-6-18 0:00: CT No Violations 1.00
95841904 2019-7-15 0:00: CT No Violations 1.00

For data sources see[4]

References