If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24175 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.01,"lon":-81.38,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Wills Township | |
Operator Name: DAVID R HILL INC | |
Well Pad ID: | |
Farm/Lease Name: BAIRD | |
License Status: Producing | |
License Date: 2010-12-28 | |
Spud Date: 2011-01-10 | |
Spud Drilling Contractor: BOWMAN DRILLING | |
Final Drill Date: 2011-01-14 | |
Well Total Depth: 4015.00 ft | |
Configuration: Vertical | |
Latitude: 40.010000 | |
Longitude: -81.380000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2010-12-28 | Proposed Formations:SQUAW THRU OHIO SHALE, Issued Date:12/28/2010, Expired Date:12/27/2012 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:ENPW |
Reached Total Depth | 2011-01-14 | |
Completion Report Received | 2011-11-16 | |
Construction Permit Expires | 2012-12-27 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 537362 Gal | 109500 | Universal Well Services Inc. |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | DAVID R HILL INC | 6619.00 | 0.00 | 271 |
2012 | DAVID R HILL INC | 10069.00 | 180.00 | 366 |
2013 | DAVID R HILL INC | 6200.00 | 106.00 | 365 |
2014 | DAVID R HILL INC | 4651.00 | 88.00 | 365 |
2015 | DAVID R HILL INC | 4100.00 | 50.00 | 365 |
2016 | DAVID R HILL INC | 3701.00 | 0.00 | 365 |
2017 | DAVID R HILL INC | 3236.00 | 0.00 | 365 |
2018 | DAVID R HILL INC | 3150.00 | 101.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | DAVID R HILL INC | Brine | 804 | 271 |
2012 | DAVID R HILL INC | Brine | 392 | 366 |
2013 | DAVID R HILL INC | Brine | 147 | 365 |
2014 | DAVID R HILL INC | Brine | 110 | 365 |
2015 | DAVID R HILL INC | Brine | 70 | 365 |
2016 | DAVID R HILL INC | Brine | 0 | 365 |
2017 | DAVID R HILL INC | Brine | 0 | 365 |
2018 | DAVID R HILL INC | Brine | 90 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1088643288 | 2020-2-14 0:00: | PW | No Violations | 1.00 |
-1702688854 | 2018-7-12 0:00: | PW | No Violations | 0.20 |
-2118617205 | 2019-4-30 0:00: | PW | No Violations | 0.20 |
-3452266 | 2012-7-31 0:00: | PW | No Violations | |
-385039128 | 2011-8-31 0:00: | PL | No Violations | |
0003452266 | 2012-07-31 | Production Wells | No Violations | On the day of my inspection I found the pump unit to be running, there is a separator/ drip/ chart/ brine tank and (1) two hundred ten barrel production tank setting inside a containment dike, the I.D. is posted. |
0385039128 | 2011-08-31 | Preliminary Restoration | No Violations | Inspection revealed that restoration work at site is satisfactory, pit has been filled in and site restored and vegetation has been established. |
0810716968 | 2011-01-11 | Drill / Deepen / Reopen | No Violations | Drilling@470 should be setting 7 surface casing late tonight or early morning. |
1030094112 | 2014-08-25 | Production Wells | No Violations | Onsite with Inspector Doug Bennett. Wellhead has 4.5 casing, 2 tubing, and an electric pumping unit with rods. The valves are open. The tank battery contains a 210 bbl tank, 50 bbl poly brine tank, 2 sales meter with 3/8 orifice, chart, drip, and vertical seperator all within an earthen dike. |
1294859869 | 2011-01-12 | Drill / Deepen / Reopen | No Violations | On site to witness testing of BOP driller pressured up on bladder and they applied 400 psi to drill string and we monitored pressure for 15 min with no decline in pressure.
Note: Instructed driller to replace 2 bull plug on choke system and properly chain down choke lines. |
1408994271 | 2014-08-25 | Production Wells | No Violations | On the day of my inspection accompanied by ODNR Inspector Dylan Pendleton, I witnessed that the well was equipped with 4.5 inch casing, 2 inch tubing, rods and a pumping unit powered by electricity with valves in the open position. Production equipped a 210bbl tank, a 50bbl polymer brine tank, a vertical separator, a drip, a 2 inch sales meter with a .375 inch orifice and a chart recorder all within an earthen dike. Identification was present and production records are current. |
1653141348 | 2020-8-14 0:00: | PW | No Violations | 1.00 |
1702688854 | 2018-07-12 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with 4.5-inch diameter production casing with a tubing head, 2.375-inch diameter tubing, rods and a pumping unit. Production valves were in the opened position. A gauge was present on the sales line reading 132 pounds per square inch. Production equipped consisted of one 210-barrel tank, one 50-barrel poly tank, a vertical separator, a drip, and a sales meter. The sales meter had a 2-inch diameter sales line, a .375-inch orifice plate, and a chart recorder. Identification was located on the tank ladder. David Hill Incorporated has submitted reports of gas production for the year 2017. |
1925228015 | 2016-12-20 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with 4.5 inch diameter casing, 2.375 inch diameter tubing, rods and an Oilwell pumping unit powered by electricity with valves in the open position. Production equipped a 210 barrel tank, a 50 barrel polymer brine tank, a vertical separator, a drip, a 2 inch sales meter with a .375 inch orifice and a chart recorder all within an earthen dike. Identification was present and production records are current. |
2096771562 | 2011-01-10 | Drill / Deepen / Reopen | No Violations | On site to instruct site builder on proper pit construction and proper handling of top soil, Bowman Drilling moving in on site to drill new well. |
2118617205 | 2019-04-30 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with 4.5-inch diameter production casing with a tubing head, 2.375-inch diameter tubing, rods and a pumping unit. Production valves were in the opened position. A gauge was present on the sales line reading 115 pounds per square inch. Production equipped consisted of one 210-barrel tank, one 50-barrel poly tank, a vertical separator, a drip, and a sales meter. The sales meter had a 2-inch diameter sales line, a .375-inch orifice plate, and a chart recorder. Identification was located on the tank ladder. David Hill Incorporated has submitted reports of gas and oil production for the year 2018. |
810716968 | 2011-1-11 0:00: | DD | No Violations |
For data sources see[8]